ML23157A042: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Nuclear Regulatory Commission Region III, Lisle, IL. | {{#Wiki_filter:Nuclear Regulatory Commission Region III, Lisle, IL. | ||
2022 End of Cycle Annual Assessment Webinar Monticello Nuclear Generating Plant | 2022 End of Cycle Annual Assessment Webinar Monticello Nuclear Generating Plant 2022 Annual Assessment Webinar Monticello Nuclear Generating Plant | ||
For the Q&A Session: | |||
Raise your hand under Reaction on the Teams app | Raise your hand under Reaction on the Teams app Pre s s *5 to raise / lower hand if you are a dial -in caller Email your questions after the Webinar to the PAOs During the presentation, microphones w ill be muted, and cameras turned off. | ||
NRC Regional Staff | |||
Hironori Peterson Roy Elliott Branch Chief Senior Project Engineer Division of Operating Reactor Safety, Division of Operating Reactor Safety, Branch 3 Branch 3 | |||
Agenda | 3 Agenda | ||
* Presentation | * Presentation | ||
- NRC Mission | |||
- Reactor Oversight Process (ROP) | |||
- 2022 Safety Performance Over view | |||
- Control of Radiological Effluents | |||
* Question-and-Answer Session | * Question-and-Answer Session | ||
OUR MISSION | 4 OUR MISSION | ||
How do we meet our Mission? | To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the Region III Office, Lisle, IL environment. | ||
Regional Inspector | |||
5 How do we meet our Mission? | |||
Regional Licensing Inspector Ashley Demeter Oversight (Inspections) at Monticello Enforcement | |||
Incident Response | |||
Resident NRC Inspector Tom Emergency McGowan at Operations Monticello Center | |||
6 So how did the site do? | |||
Monticello 7 | Monticello 7 | ||
Monticello Resident Inspectors | |||
Chuck Norton Tom McGowan Senior Resident Inspector Resident Inspector | |||
8 Reactor Oversight Process | |||
www.nrc.gov/reactors/operating/oversight.html | |||
9 Action Matrix Columns | |||
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone | |||
Increasing: | |||
* Safety Significance | * Safety Significance | ||
* Inspection | * Inspection | ||
* Management Involvement | * Management Involvement | ||
* Regulatory Action www.nrc.gov/reactors/operating/oversight.html | * Regulatory Action www.nrc.gov/reactors/operating/oversight.html | ||
Monticello 2022 Assessment Summary | 10 Monticello 2022 Assessment Summary | ||
* Operated safely and in a manner that preserved the public health and safety and protected the environment | * Operated safely and in a manner that preserved the public health and safety and protected the environment | ||
* Licensee Response Column | * Licensee Response Column | ||
* 2225 hours of direct inspection | * 2225 hours of direct inspection | ||
* All Green Performance Indicators | * All Green Performance Indicators | ||
* One Green Findings | * One Green Findings w ith Associated Non-cited Violations | ||
- Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(2) | |||
* One Green Security Finding | * One Green Security Finding w ith Associated Non-cited Violation | ||
https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html | |||
11 Control of Radiological Effluents | |||
12 Over view | |||
* Nuclear power plants need to discharge radioactive effluents in small amounts in order to operate and have been doing so safely since initial start-up | * Nuclear power plants need to discharge radioactive effluents in small amounts in order to operate and have been doing so safely since initial start-up | ||
* Rules limit the amount that can be released to ensure they are a fraction of what is received from background sources | * Rules limit the amount that can be released to ensure they are a fraction of what is received from background sources | ||
* Release information is publicly available and inspected by the NRC | * Release information is publicly available and inspected by the NRC | ||
Dose | 13 Dose | ||
* A measurement of the energy imparted by radiation | * A measurement of the energy imparted by radiation | ||
* Conventional units used are mrem (millirem) | * Conventional units used are mrem (millirem) | ||
* Can be thought of as the overall risk from radiation to a person | * Can be thought of as the overall risk from radiation to a person | ||
* Average dose an individual receives per year from natural sources of radiation (sun, soil, etc.) is about 300 mrem | * Average dose an individual receives per year from natural sources of radiation (sun, soil, etc.) is about 300 mrem | ||
Regulations | 14 Regulations | ||
* Focus on limiting the dose to people living around the site | * Focus on limiting the dose to people living around the site | ||
* Nuclear power plants must limit dose to the public to 25 mrem/year | * Nuclear power plants must limit dose to the public to 25 mrem/year | ||
* Plants are designed to operate well below 25 mrem/year | * Plants are designed to operate well below 25 mrem/year | ||
* Monticello typically runs with the maximum dose to a member of the public below 0.1 mrem/year 15 | * Monticello typically runs with the maximum dose to a member of the public below 0.1 mrem/year | ||
15 Land Use Census | |||
Public GPI Health Effluent Controls | |||
& S a fe t y | |||
REMP | |||
Land Use Census | 16 Land Use Census | ||
* How the public is exposed to radiation depends on how the land around the plant is used | * How the public is exposed to radiation depends on how the land around the plant is used | ||
* Plants annually perform a census to identify changes in how the land is used | * Plants annually perform a census to identify changes in how the land is used | ||
* Looks for things such as large gardens, dairy cows, where residents are located, etc. | * Looks for things such as large gardens, dairy cows, where residents are located, etc. | ||
Land Use Census | 17 Land Use Census | ||
Effluent Controls | Public GPI Health Effluent Controls | ||
& S a fe t y | |||
REMP | |||
18 Effluent Controls | |||
* We are using effluent as a generic term to describe radioactive material released from the site in gaseous or liquid form | * We are using effluent as a generic term to describe radioactive material released from the site in gaseous or liquid form | ||
* Effluent controls ensure that what is being released is monitored and controlled to ensure dose limits are met | * Effluent controls ensure that what is being released is monitored and controlled to ensure dose limits are met | ||
Effluent Controls | 19 Effluent Controls | ||
* Doses to the public are too small to measure directly | * Doses to the public are too small to measure directly | ||
* Sites sample and analyze effluents from the plant piping or tanks they are being released from | * Sites sample and analyze effluents from the plant piping or tanks they are being released from | ||
* Information from the land use census used to model how an individual would be exposed to the effluent release | * Information from the land use census used to model how an individual would be exposed to the effluent release | ||
* Doses are calculated based on the model 20 | * Doses are calculated based on the model | ||
20 Effluent Controls | |||
21 Land Use Census | |||
Effluent Controls | Public GPI Health Effluent Controls | ||
& S a fe t y | |||
REMP | |||
REMP Radiological Environmental Monitoring Program | 22 REMP Radiological Environmental Monitoring Program | ||
* Measures radiation in the environment during the lifetime of the plant | * Measures radiation in the environment during the lifetime of the plant | ||
* Determines if any measurable levels of radiation are from plant operation | * Determines if any measurable levels of radiation are from plant operation | ||
* Determines if results are commensurate with the radioactive effluents 23 | * Determines if results are commensurate with the radioactive effluents | ||
23 REMP | |||
24 Land Use Census | |||
Public GPI Health Effluent Controls | |||
& S a fe t y | |||
REMP | |||
GPI Groundwater Protection Initiative | 25 GPI Groundwater Protection Initiative | ||
* Objectives include | * Objectives include | ||
* Provide timely detection and effective response to inadvertent on- | * Provide timely detection and effective response to inadvertent on-s i te releases to groundwater in order to prevent migration off-site and to quantify impacts on decommissioning | ||
* Improve communication with external stakeholders | * Improve communication with external stakeholders | ||
* Perform program oversight to ensure effective implementation | * Perform program oversight to ensure effective implementation | ||
GPI | 26 GPI | ||
* Site hydrology | * Site hydrology | ||
- How does the groundwater move? | |||
* Risk ranking | * Risk ranking | ||
- Where is there potential for leaks? | |||
* Groundwater monitoring | * Groundwater monitoring | ||
- Monitoring wells established in strategic locations based on hydrology and risk ranking | |||
* Recovery | * Recovery | ||
- Pumping contaminated water out of the ground for appropriate handling | |||
* Communications | * Communications | ||
- Protocols established between site and State/Local governments | |||
GPI | 27 GPI | ||
Recent Tritium Leak | 28 Recent Tritium Leak | ||
* November 2022 | * November 2022 | ||
- Site identified elevated tritium levels in one of the GPI monitoring wells during routine monthly sampling | |||
- Site notified the State and NRC of the elevated levels | |||
- Sampling frequencies of nearby monitoring wells increased | |||
- Site started investigation to determine source of the leak | |||
Recent Tritium Leak | 29 Recent Tritium Leak | ||
* December 2022 | * December 2022 | ||
- Site identified source of leak in pipe that runs between the reactor and turbine buildings, which have a small gap between them. | |||
- Leak was captured and rerouted back into the plant | |||
- Site started recovering contaminated groundwater | |||
* Stored in tanks on-site and reused as plant make-up water | * Stored in tanks on-site and reused as plant make-up water | ||
- Site started installing additional monitoring wells | |||
Recent Tritium Leak | 30 Recent Tritium Leak | ||
* March 2023 | * March 2023 | ||
- Routine sampling of monitoring well indicated some of the leak was again making it to groundwater | |||
- Site shut down the plant to replace the section of pipe | |||
* Permanent repair was originally planned for the routine maintenance outage scheduled in April 2023 | * Permanent repair was originally planned for the routine maintenance outage scheduled in April 2023 | ||
Recent Tritium Leak | 31 Recent Tritium Leak | ||
* Ongoing | * Ongoing | ||
- Site continues to monitor location of tritium | |||
- Monitoring well sample frequency adjusted for each well based on current conditions | |||
- Evaluation for additional monitoring wells continues | |||
- Recovery of contaminated groundwater routinely adjusted for current conditions | |||
- Sites actions are aimed at preventing uncontrolled migration of the tritium off-si te | |||
Recent Tritium Leak | 32 Recent Tritium Leak | ||
* Risk from off-site release | * Risk from off-site release | ||
- The amount of tritium leaked to the groundwater would not pose a health concern even if all of it reached the Mississippi River | |||
- Dose to a member of the public would be well below 1 mrem | |||
* Remember, 300 mrem/year from natural sources | * Remember, 300 mrem/year from natural sources | ||
Recent Tritium Leak | 33 Recent Tritium Leak | ||
* Even though there is no health concern, it does not mean it is okay to do nothing | * Even though there is no health concern, it does not mean it is okay to do nothing | ||
- NRC expects effluents to be released in a monitored and controlled fashion | |||
- Site had to identify and stop the leak | |||
- Recovery of contaminated groundwater to mitigate off-site release through groundwater is expected | |||
- Extensive monitoring of the groundwater will ensure that any off-site release through the groundwater is appropriately accounted for | |||
- NRC will verify appropriate control | |||
Inspections | 34 Inspections | ||
* The NRC has specialized inspectors perform periodic on-site inspections of the programs discussed today | * The NRC has specialized inspectors perform periodic on-site inspections of the programs discussed today | ||
* The NRC maintains at least two resident inspectors at each site to oversee the day-to-day operation of the site | * The NRC maintains at least two resident inspectors at each site to oversee the day-to-day operation of the site | ||
* NRC will continue to follow the sites actions through the routine inspection program | * NRC will continue to follow the sites actions through the routine inspection program | ||
Inspections | 35 Inspections | ||
* Land Use Census | * Land Use Census | ||
- Review implementation and results | |||
* Effluent Controls | * Effluent Controls | ||
- Observe routine effluent sampling and analysis | |||
- Walkdown effluent systems and radiation monitoring equipment | |||
- Review maintenance and calibration records | |||
- Review quality assurance programs | |||
- Review discharges | |||
* GPI | * GPI | ||
- Walkdown and observe GPI program elements | |||
- Review monitoring well results and licensee evaluations of results | |||
* REMP | * REMP | ||
- Observe sampling activities | |||
- Review laboratory results and licensee evaluation of results | |||
- Review quality assurance programs 36 Annual Reports | |||
Nuclear power plants are required to submit annual reports summarizing effluent releases, on-site groundwater monitoring results, and REMP results. | |||
These reports can be found at | |||
https://www.nrc. gov/reacto rs/operating /ops-experience/tritium/plant-info.html | |||
For more information | 37 For more information | ||
* Inspection Reports | * Inspection Reports | ||
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html | |||
* Reactor Oversight Process | * Reactor Oversight Process | ||
- https://www.nrc.gov/reactors/operating/oversight.html | |||
* Fact Sheets and Brochures | * Fact Sheets and Brochures | ||
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/ | |||
* NRC Information Digest | * NRC Information Digest | ||
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/ | |||
* Regulations | * Regulations | ||
- https://www.nrc.gov/reading-rm/doc-collections/cfr/ | |||
38 | |||
38 NRC Social Media Channels | |||
Facebook: https://www.facebook.com/nrcgov/ | |||
Twitter: https://twitter.com/nrcgov YouTube: http://www.youtube.com/user/NRCgov Linkedin: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/ | Twitter: https://twitter.com/nrcgov YouTube: http://www.youtube.com/user/NRCgov Linkedin: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/ | ||
Flickr: https://www.flickr.com/photos/nrcgov/ | Flickr: https://www.flickr.com/photos/nrcgov/ | ||
Meeting Feedback On Any Device or Computer: | 39 Meeting Feedback | ||
Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days) | |||
On Any Device or Computer: | |||
Go to the Public Meeting Schedule at (www.nrc. gov/pmns/mtg?do=recent30days) | |||
Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link. | Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link. | ||
Note: Meetings are sorted by date and time. Use last to get to the most recently completed meeting. | Note: Meetings are sorted by date and time. Use last to get to the most recently completed meeting. | ||
Region III Public Affairs Officers Viktoria Mitlyng | 40 Region III Public Affairs Officers | ||
Viktoria Mitlyng Prema Chandrathil Office: 630-829-9662 Office: 630-829-9663 Cell: 630- 201-1345Cell: 630- 515-6145 Viktoria.mitlyng@nrc. gov Prema.chandrathil@nrc. gov 41 QUESTIONS? | |||
To ask a question either: | To ask a question either: | ||
Raise your hand under Reaction on the Teams app Press *5 to raise / lower hand if you are a dial-in caller. | |||
Raise your hand under Reaction on the Teams app | |||
Press *5 to raise / lower hand if you are a dial-in caller. | |||
Email your questions after the Webinar to the PAOs. | Email your questions after the Webinar to the PAOs. | ||
This Concludes the 2022 End of Cycle Annual Assessment Webinar Presentation for Monticello Nuclear Generating Plant Thank You & Goodnight}} | viktoria.mitlyng@nrc.gov | ||
prema.chandrathil@nrc.gov | |||
42 This Concludes the 2022 End of Cycle Annual Assessment Webinar Presentation for Monticello Nuclear Generating Plant Thank You & Goodnight}} | |||
Revision as of 20:59, 13 November 2024
| ML23157A042 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/06/2023 |
| From: | NRC/RGN-III/DORS/RPB3 |
| To: | |
| Shared Package | |
| ML23013A315 | List: |
| References | |
| Download: ML23157A042 (1) | |
Text
Nuclear Regulatory Commission Region III, Lisle, IL.
2022 End of Cycle Annual Assessment Webinar Monticello Nuclear Generating Plant 2022 Annual Assessment Webinar Monticello Nuclear Generating Plant
For the Q&A Session:
Raise your hand under Reaction on the Teams app Pre s s *5 to raise / lower hand if you are a dial -in caller Email your questions after the Webinar to the PAOs During the presentation, microphones w ill be muted, and cameras turned off.
NRC Regional Staff
Hironori Peterson Roy Elliott Branch Chief Senior Project Engineer Division of Operating Reactor Safety, Division of Operating Reactor Safety, Branch 3 Branch 3
3 Agenda
- Presentation
- NRC Mission
- Reactor Oversight Process (ROP)
- 2022 Safety Performance Over view
- Control of Radiological Effluents
- Question-and-Answer Session
4 OUR MISSION
To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the Region III Office, Lisle, IL environment.
5 How do we meet our Mission?
Regional Licensing Inspector Ashley Demeter Oversight (Inspections) at Monticello Enforcement
Incident Response
Resident NRC Inspector Tom Emergency McGowan at Operations Monticello Center
6 So how did the site do?
Monticello 7
Monticello Resident Inspectors
Chuck Norton Tom McGowan Senior Resident Inspector Resident Inspector
8 Reactor Oversight Process
www.nrc.gov/reactors/operating/oversight.html
9 Action Matrix Columns
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone
Increasing:
- Safety Significance
- Inspection
- Management Involvement
- Regulatory Action www.nrc.gov/reactors/operating/oversight.html
10 Monticello 2022 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 2225 hours0.0258 days <br />0.618 hours <br />0.00368 weeks <br />8.466125e-4 months <br /> of direct inspection
- All Green Performance Indicators
- One Green Findings w ith Associated Non-cited Violations
- Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(2)
- One Green Security Finding w ith Associated Non-cited Violation
https://www.nrc.gov/reactors/operating/oversight/listofasmrpt.html
11 Control of Radiological Effluents
12 Over view
- Nuclear power plants need to discharge radioactive effluents in small amounts in order to operate and have been doing so safely since initial start-up
- Rules limit the amount that can be released to ensure they are a fraction of what is received from background sources
- Release information is publicly available and inspected by the NRC
13 Dose
- A measurement of the energy imparted by radiation
- Conventional units used are mrem (millirem)
- Can be thought of as the overall risk from radiation to a person
- Average dose an individual receives per year from natural sources of radiation (sun, soil, etc.) is about 300 mrem
14 Regulations
- Focus on limiting the dose to people living around the site
- Nuclear power plants must limit dose to the public to 25 mrem/year
- Plants are designed to operate well below 25 mrem/year
- Monticello typically runs with the maximum dose to a member of the public below 0.1 mrem/year
15 Land Use Census
Public GPI Health Effluent Controls
& S a fe t y
16 Land Use Census
- How the public is exposed to radiation depends on how the land around the plant is used
- Plants annually perform a census to identify changes in how the land is used
- Looks for things such as large gardens, dairy cows, where residents are located, etc.
17 Land Use Census
Public GPI Health Effluent Controls
& S a fe t y
18 Effluent Controls
- We are using effluent as a generic term to describe radioactive material released from the site in gaseous or liquid form
- Effluent controls ensure that what is being released is monitored and controlled to ensure dose limits are met
19 Effluent Controls
- Doses to the public are too small to measure directly
- Sites sample and analyze effluents from the plant piping or tanks they are being released from
- Information from the land use census used to model how an individual would be exposed to the effluent release
- Doses are calculated based on the model
20 Effluent Controls
21 Land Use Census
Public GPI Health Effluent Controls
& S a fe t y
22 REMP Radiological Environmental Monitoring Program
- Measures radiation in the environment during the lifetime of the plant
- Determines if any measurable levels of radiation are from plant operation
- Determines if results are commensurate with the radioactive effluents
23 REMP
24 Land Use Census
Public GPI Health Effluent Controls
& S a fe t y
25 GPI Groundwater Protection Initiative
- Objectives include
- Provide timely detection and effective response to inadvertent on-s i te releases to groundwater in order to prevent migration off-site and to quantify impacts on decommissioning
- Improve communication with external stakeholders
- Perform program oversight to ensure effective implementation
26 GPI
- Site hydrology
- How does the groundwater move?
- Risk ranking
- Where is there potential for leaks?
- Groundwater monitoring
- Monitoring wells established in strategic locations based on hydrology and risk ranking
- Recovery
- Pumping contaminated water out of the ground for appropriate handling
- Communications
- Protocols established between site and State/Local governments
27 GPI
28 Recent Tritium Leak
- November 2022
- Site identified elevated tritium levels in one of the GPI monitoring wells during routine monthly sampling
- Site notified the State and NRC of the elevated levels
- Sampling frequencies of nearby monitoring wells increased
- Site started investigation to determine source of the leak
29 Recent Tritium Leak
- December 2022
- Site identified source of leak in pipe that runs between the reactor and turbine buildings, which have a small gap between them.
- Leak was captured and rerouted back into the plant
- Site started recovering contaminated groundwater
- Stored in tanks on-site and reused as plant make-up water
- Site started installing additional monitoring wells
30 Recent Tritium Leak
- March 2023
- Routine sampling of monitoring well indicated some of the leak was again making it to groundwater
- Site shut down the plant to replace the section of pipe
- Permanent repair was originally planned for the routine maintenance outage scheduled in April 2023
31 Recent Tritium Leak
- Ongoing
- Site continues to monitor location of tritium
- Monitoring well sample frequency adjusted for each well based on current conditions
- Evaluation for additional monitoring wells continues
- Recovery of contaminated groundwater routinely adjusted for current conditions
- Sites actions are aimed at preventing uncontrolled migration of the tritium off-si te
32 Recent Tritium Leak
- Risk from off-site release
- The amount of tritium leaked to the groundwater would not pose a health concern even if all of it reached the Mississippi River
- Dose to a member of the public would be well below 1 mrem
- Remember, 300 mrem/year from natural sources
33 Recent Tritium Leak
- Even though there is no health concern, it does not mean it is okay to do nothing
- NRC expects effluents to be released in a monitored and controlled fashion
- Site had to identify and stop the leak
- Recovery of contaminated groundwater to mitigate off-site release through groundwater is expected
- Extensive monitoring of the groundwater will ensure that any off-site release through the groundwater is appropriately accounted for
- NRC will verify appropriate control
34 Inspections
- The NRC has specialized inspectors perform periodic on-site inspections of the programs discussed today
- The NRC maintains at least two resident inspectors at each site to oversee the day-to-day operation of the site
- NRC will continue to follow the sites actions through the routine inspection program
35 Inspections
- Land Use Census
- Review implementation and results
- Effluent Controls
- Observe routine effluent sampling and analysis
- Walkdown effluent systems and radiation monitoring equipment
- Review maintenance and calibration records
- Review quality assurance programs
- Review discharges
- Walkdown and observe GPI program elements
- Review monitoring well results and licensee evaluations of results
- Observe sampling activities
- Review laboratory results and licensee evaluation of results
- Review quality assurance programs 36 Annual Reports
Nuclear power plants are required to submit annual reports summarizing effluent releases, on-site groundwater monitoring results, and REMP results.
These reports can be found at
https://www.nrc. gov/reacto rs/operating /ops-experience/tritium/plant-info.html
37 For more information
- Inspection Reports
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
- Reactor Oversight Process
- https://www.nrc.gov/reactors/operating/oversight.html
- Fact Sheets and Brochures
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
- NRC Information Digest
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- Regulations
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
38 NRC Social Media Channels
Facebook: https://www.facebook.com/nrcgov/
Twitter: https://twitter.com/nrcgov YouTube: http://www.youtube.com/user/NRCgov Linkedin: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/
Flickr: https://www.flickr.com/photos/nrcgov/
39 Meeting Feedback
On Any Device or Computer:
Go to the Public Meeting Schedule at (www.nrc. gov/pmns/mtg?do=recent30days)
Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link.
Note: Meetings are sorted by date and time. Use last to get to the most recently completed meeting.
40 Region III Public Affairs Officers
Viktoria Mitlyng Prema Chandrathil Office: 630-829-9662 Office: 630-829-9663 Cell: 630- 201-1345Cell: 630- 515-6145 Viktoria.mitlyng@nrc. gov Prema.chandrathil@nrc. gov 41 QUESTIONS?
To ask a question either:
Raise your hand under Reaction on the Teams app
Press *5 to raise / lower hand if you are a dial-in caller.
Email your questions after the Webinar to the PAOs.
viktoria.mitlyng@nrc.gov
prema.chandrathil@nrc.gov
42 This Concludes the 2022 End of Cycle Annual Assessment Webinar Presentation for Monticello Nuclear Generating Plant Thank You & Goodnight