ML23353A144: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:January 8, 2024 | ||
MEMORANDUM TO: Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
FROM: Daniel G. King, ATF Project Manager /RA/ | |||
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | |||
UPDATE TO THE ACCIDENT TOLERANT FUEL ROADMAP TO READINESS | |||
The purpose of this memorandum is to transmit an update to the accident tolerant fuel (ATF) | |||
Roadmap to Readiness graphic. As a complement to the ATF project plan (Agencywide Documents Access and M anagement System (ADAMS) Accession No. ML21243A298), it has provided: (1) a graphical representation of the project timeline; (2) project efficiency and reliability; (3) regulatory certainty of licensing near-term ATF, increased enrichment, and higher burnup technologies; and (4) a visual of critical milestones anticipated to maintain a mid-to-late 2020s batch loading deployment timeline for the entire suite of near-term ATF, increased enrichment, and higher burnup. This graphic has been updated to reflect critical milestones completed since the last revision was issued in June 2023. | |||
The information presented does not supersede any regulations or guidance and the information presented should not be interpreted as new regulatory requirements or guidance. The future updates will be on an ongoing basis and evaluated biannually, through continued stakeholder engagements. | |||
==Enclosures:== | |||
: 1. Change History | |||
: 2. Accident Tolerant Fuel, Increased Enrichment, and Higher Burnup Roadmap to Readiness | |||
CONTACT: Daniel G. King, NRR/DORL (301) 415-1233 | |||
Change History | |||
Item Location Description Version 1.1 (January 2024) | |||
RG 1.183 Coated Updated hyperlink RG 1.183 Revision 0, Alternative Rev.1 Source Cladding, Radiological Source Terms for Term Doped Pellet, Evaluating Design Basis Accidents Increased at Nuclear Power Reactors (ML003716792) to RG 1.183 Enrichment, Revision 1 (ML23082A305). | |||
and Higher Updated completion for RG 1.183 Revision 1 to Issued Burnup October 2023. | |||
Code Stakeholder Updated hyperlink to Development Engagement https://www.nrc.gov/reactors/power/atf/review/independent-confirm-calc.html Regulatory Stakeholder Updated hyperlink to Issue Engagement https://www.nrc.gov/reactors/power/atf/interactions/industry-Summary interact.html#general (RIS) Updated completion for Regulatory Issue Summary (RIS) to Issued November 2019 and June 2023 NUREG on Stakeholder Updated hyperlink to NUREG 2266, Environmental Environmental Engagement Evaluation of Accident Tolerant Fuels with Increased Evaluation of Enrichment and Higher Burnup Levels Draft Report for ATF with IE Comment (ML23240A756). | |||
and HBU IE Increased Updated hyperlink to Rulemaking Enrichment https://www.regulations.gov/docket/NRC-2020-0034 SRM-SECY-and Higher 109 Burnup Batch Load Destination Updated timeline to be ~2030 for BWRs. | |||
Near-Term ATF Concepts New Fuels Footnote Removed hyperlink text, maintaining hyperlink to graphic Info Graphic (ML23135A021). | |||
Enclosure 1 | |||
Package: ML23353A163 Memo: ML23353A144 Slide: ML23353A145 OFFICE NRR/DORL/LLPB PM NRR/DORL/LLPB LA RES/DSA/FSCB BC NRR/DSS/SNSB BC NAME DKing DHarrison HEsmaili SKrepel DATE 12/18/23 12/22/23 1/8/24 12/22/23 OFFICE NRR/DORL/LLPB BC NMSS/DFM/NARAB/BC NMSS/REFS/ERNRB BC (A) NRR/DRA/ARCB BC NAME GGeorge DMarcano DPalmrose KHsueh DATE 12/22/23 1/8/24 1/3/24 1/8/24 OFFICE NRR/DORL/LLPB PM NAME DKing DATE 1/8/24}} | |||
Revision as of 20:54, 5 October 2024
| ML23353A144 | |
| Person / Time | |
|---|---|
| Issue date: | 01/08/2024 |
| From: | King D Licensing Processes Branch |
| To: | Gerond George Licensing Processes Branch |
| Shared Package | |
| ML23353A163 | List: |
| References | |
| Download: ML23353A144 (3) | |
Text
January 8, 2024
MEMORANDUM TO: Gerond A. George, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
FROM: Daniel G. King, ATF Project Manager /RA/
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
UPDATE TO THE ACCIDENT TOLERANT FUEL ROADMAP TO READINESS
The purpose of this memorandum is to transmit an update to the accident tolerant fuel (ATF)
Roadmap to Readiness graphic. As a complement to the ATF project plan (Agencywide Documents Access and M anagement System (ADAMS) Accession No. ML21243A298), it has provided: (1) a graphical representation of the project timeline; (2) project efficiency and reliability; (3) regulatory certainty of licensing near-term ATF, increased enrichment, and higher burnup technologies; and (4) a visual of critical milestones anticipated to maintain a mid-to-late 2020s batch loading deployment timeline for the entire suite of near-term ATF, increased enrichment, and higher burnup. This graphic has been updated to reflect critical milestones completed since the last revision was issued in June 2023.
The information presented does not supersede any regulations or guidance and the information presented should not be interpreted as new regulatory requirements or guidance. The future updates will be on an ongoing basis and evaluated biannually, through continued stakeholder engagements.
Enclosures:
- 1. Change History
- 2. Accident Tolerant Fuel, Increased Enrichment, and Higher Burnup Roadmap to Readiness
CONTACT: Daniel G. King, NRR/DORL (301) 415-1233
Change History
Item Location Description Version 1.1 (January 2024)
RG 1.183 Coated Updated hyperlink RG 1.183 Revision 0, Alternative Rev.1 Source Cladding, Radiological Source Terms for Term Doped Pellet, Evaluating Design Basis Accidents Increased at Nuclear Power Reactors (ML003716792) to RG 1.183 Enrichment, Revision 1 (ML23082A305).
and Higher Updated completion for RG 1.183 Revision 1 to Issued Burnup October 2023.
Code Stakeholder Updated hyperlink to Development Engagement https://www.nrc.gov/reactors/power/atf/review/independent-confirm-calc.html Regulatory Stakeholder Updated hyperlink to Issue Engagement https://www.nrc.gov/reactors/power/atf/interactions/industry-Summary interact.html#general (RIS) Updated completion for Regulatory Issue Summary (RIS) to Issued November 2019 and June 2023 NUREG on Stakeholder Updated hyperlink to NUREG 2266, Environmental Environmental Engagement Evaluation of Accident Tolerant Fuels with Increased Evaluation of Enrichment and Higher Burnup Levels Draft Report for ATF with IE Comment (ML23240A756).
and HBU IE Increased Updated hyperlink to Rulemaking Enrichment https://www.regulations.gov/docket/NRC-2020-0034 SRM-SECY-and Higher 109 Burnup Batch Load Destination Updated timeline to be ~2030 for BWRs.
Near-Term ATF Concepts New Fuels Footnote Removed hyperlink text, maintaining hyperlink to graphic Info Graphic (ML23135A021).
Enclosure 1
Package: ML23353A163 Memo: ML23353A144 Slide: ML23353A145 OFFICE NRR/DORL/LLPB PM NRR/DORL/LLPB LA RES/DSA/FSCB BC NRR/DSS/SNSB BC NAME DKing DHarrison HEsmaili SKrepel DATE 12/18/23 12/22/23 1/8/24 12/22/23 OFFICE NRR/DORL/LLPB BC NMSS/DFM/NARAB/BC NMSS/REFS/ERNRB BC (A) NRR/DRA/ARCB BC NAME GGeorge DMarcano DPalmrose KHsueh DATE 12/22/23 1/8/24 1/3/24 1/8/24 OFFICE NRR/DORL/LLPB PM NAME DKing DATE 1/8/24