ML24017A080: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML24017A080
| number = ML24017A080
| issue date = 01/11/2024
| issue date = 01/11/2024
| title = Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301
| title = Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301
| author name = Stephen T
| author name = Stephen T
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:January 11, 2024
 
            Eric S. Carr
            President Nuclear Operations and
            Chief Nuclear Officer
            Innsbrook Technical Center
            5000 Dominion Boulevard
            Glen Allen, VA 29060
 
            SUBJECT:                                    NORTH ANNA POWER STATION -                    NOTIFICATION OF LICENSED
                                    OPERATOR INITIAL EXAMINATION 05000338/2024301 AND
                                    05000339/2024                    301
 
            Dear Mr. Carr:
 
            During a telephone conversation on                                                      January 4, 2024, between Mr. Andrew Brust, Exam Author
            of Record,                      and Mr. Michael Donithan,                                                                  Senior Operations Engineer, arrangements were made
            for the administration of licensing examinations at the        North Anna                                                                  Nuclear Station.                                            The on-                                                                            site
            preparatory week is scheduled for the week of June 24, 2024                                                                .  The operating test is scheduled
            to be administered during the week          s                    of August 5                                and August 12,                                            2024                                                                .  The written examination
            is scheduled to be administered the week of August          19, 2024                                                                  .
 
            As agreed during the telephone conversation, your staff will prepare both the operating test and
            written examination based on the guidelines in Revision                                12 of NUREG-1021, "Operator
            Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory
            Commission (NRC)                                                                                      regional office will discuss with your staff any changes that might be
            necessary before the examinations are administered.  Your staff has also agreed to make
            copies of all examination materials that are necessary for administering the examination.
 
            To meet the above schedule, it will be necessary for your staff to furnish the operating test
            outline                                            by March 8, 2024.  The written examination outline                                          was provided                                                                to your staff o          n August
            16, 2023.  The written examinations, operating tests, and supporting reference materials
            identified in NUREG-1021, Examination                                            Standard (ES)-2.1, Preparing for Operator Licensing
            Initial Examinations, will be due by May 22, 2024                                                                                                                        .  Pursuant to Title 10, Section 55.40(b)(3), of
            the Code of Federal Regulations (10 CFR                            55.40(b)(3)), an authorized representative of the
            facility licensee shall approve the outline, examination, and test before they are submitted to the
            NRC for review and approval.  All materials shall be complete and ready-to-use.
 
            We request that any personal, proprietary, sensitive unclassified, or safeguards information in
            your response be contained in a separate enclosure and appropriately marked.  Any delay in
            receiving the required examination and reference materials, or the submittal of inadequate or
            incomplete materials, may cause the examinations to be rescheduled.
E. Carr                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                2
 
 
To conduct the requested written examinations and operating tests, your staff will need to
provide adequate space and accommodations and to make the simulation facility available on
the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the NRC takes licensing action
on all the applications and any adjudicatory actions on any hearing demands are complete.
 
ES-                                                  1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for
the written examinations and operating tests as they are being administered.
 
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver and/or excusal requests (Office of Management and
Budget (OMB) approval number 3150-                                                                                                0090) at least 60 days before the first examination date (if
possible).  Contact Mr. Donithan to determine the method for submission of any          waiver or
excusal requests.  Preliminary reactor operator and senior reactor operator license applications
(OMB approval number 3150-                                                                                        0090) and medical certifications (OMB approval number 3150-
0024) should be submitted at least 30 days before the first examination date.  If the applications
are not received at least 30 days before the examination date, a postponement may be
necessary.  Final signed applications certifying that all training has been completed and
requesting any waivers or excusals, as applicable, should be submitted at least 14 days before
the first examination date.
 
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before
the first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early as possible in the process (see the 60-                                                                        day guideline
above).  Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form
398, Personal Qualifications  Statement - Licensee, or as directed by Mr. Donithan                                                                  when
contacting him to determine the method for submission).          The NRC will document its final
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398
submitted for the applicant.            The NRC will not provide its decision until the final application is
submitted to the agency.
 
Paperwork Reduction Act Statement
 
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
 
The burden to the public for these voluntary information collections is estimated
to average 2,250 hours per examination or response including the time for reviewing
instructions, searching existing data sources,          gathering and maintaining the data needed, and
completing and reviewing the information collections. Send comments regarding this information
collection to the FOIA, Library, and Information Collections Branch (T6-                                            A10M), U.S. Nuclear
Regulatory Commission, Washington, DC 20555 0001, or by e-                              mail to
Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and
Regulatory Affairs (3150-0018), Attn: Desk Officer for the                                          Nuclear Regulatory Commission, 725
17th Street, NW Washington, DC 20503; email:
oira_submission@omb.eop.gov.
 
 
E. Carr                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                3
 
 
Public Protection Notification
 
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information, unless the document requesting or requiring the collection displays a currently
valid OMB control number.
 
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the agencys Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection through the Agencywide Documents Access and
Management System (ADAMS).  ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-                                          rm.adams.html.
 
Thank you for your cooperation in this matter.  Mr. Brust has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Donithan at (404) 997          -4538, (E-mail:
Michael.Donithan@                                                                nrc.gov), or me at (404) 997-4                                                                            703, (E                                                                  -mail: Thomas.Stephen@                                                                                                            nrc.gov).
 
                                                                                                                                                Sincerely,
 
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          /RA/
 
                                                                                                                                                Thomas A. Stephen, Chief
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Operations Branch 1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Division of Reactor Safety
 
Docket Nos.: 50-3                                          38 and 50-3                                                      39
License Nos.:                      NPF-4 and NPF-7
 
cc: Distribution via Listserv
 
  ML24017A080                                                  SUNSI REVIEW COMPLETE                                    FORM 665 ATTACHED
  OFFICE                                RII:DRS                        RII:DRS                        RII:DRS
  NAME                                  K. Wallace                    M. Donithan                    T. Stephen
  DATE                                  01/10/24                      1/10/24                        1/11/24
}}
}}

Revision as of 19:54, 5 October 2024

– Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301
ML24017A080
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/11/2024
From: Tom Stephen
NRC/RGN-II
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
50-338/24-301, 50-339/24-301 50-338/OL-24, 50-339/OL-24
Download: ML24017A080 (4)


See also: IR 05000338/2024301

Text

January 11, 2024

Eric S. Carr

President Nuclear Operations and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 29060

SUBJECT: NORTH ANNA POWER STATION - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000338/2024301 AND

05000339/2024 301

Dear Mr. Carr:

During a telephone conversation on January 4, 2024, between Mr. Andrew Brust, Exam Author

of Record, and Mr. Michael Donithan, Senior Operations Engineer, arrangements were made

for the administration of licensing examinations at the North Anna Nuclear Station. The on- site

preparatory week is scheduled for the week of June 24, 2024 . The operating test is scheduled

to be administered during the week s of August 5 and August 12, 2024 . The written examination

is scheduled to be administered the week of August 19, 2024 .

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 12 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by March 8, 2024. The written examination outline was provided to your staff o n August

16, 2023. The written examinations, operating tests, and supporting reference materials

identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing

Initial Examinations, will be due by May 22, 2024 . Pursuant to Title 10, Section 55.40(b)(3), of

the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the

facility licensee shall approve the outline, examination, and test before they are submitted to the

NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

E. Carr 2

To conduct the requested written examinations and operating tests, your staff will need to

provide adequate space and accommodations and to make the simulation facility available on

the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff

should retain the original simulator performance data (e.g., system pressures, temperatures,

and levels) generated during the dynamic operating tests until the NRC takes licensing action

on all the applications and any adjudicatory actions on any hearing demands are complete.

ES- 1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for

the written examinations and operating tests as they are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver and/or excusal requests (Office of Management and

Budget (OMB) approval number 3150- 0090) at least 60 days before the first examination date (if

possible). Contact Mr. Donithan to determine the method for submission of any waiver or

excusal requests. Preliminary reactor operator and senior reactor operator license applications

(OMB approval number 3150- 0090) and medical certifications (OMB approval number 3150-

0024) should be submitted at least 30 days before the first examination date. If the applications

are not received at least 30 days before the examination date, a postponement may be

necessary. Final signed applications certifying that all training has been completed and

requesting any waivers or excusals, as applicable, should be submitted at least 14 days before

the first examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60- day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form

398, Personal Qualifications Statement - Licensee, or as directed by Mr. Donithan when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398

submitted for the applicant. The NRC will not provide its decision until the final application is

submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these voluntary information collections is estimated

to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response including the time for reviewing

instructions, searching existing data sources, gathering and maintaining the data needed, and

completing and reviewing the information collections. Send comments regarding this information

collection to the FOIA, Library, and Information Collections Branch (T6- A10M), U.S. Nuclear

Regulatory Commission, Washington, DC 20555 0001, or by e- mail to

Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and

Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory Commission, 725

17th Street, NW Washington, DC 20503; email:

oira_submission@omb.eop.gov.

E. Carr 3

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information, unless the document requesting or requiring the collection displays a currently

valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the agencys Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection through the Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading- rm.adams.html.

Thank you for your cooperation in this matter. Mr. Brust has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Donithan at (404) 997 -4538, (E-mail:

Michael.Donithan@ nrc.gov), or me at (404) 997-4 703, (E -mail: Thomas.Stephen@ nrc.gov).

Sincerely,

/RA/

Thomas A. Stephen, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-3 38 and 50-3 39

License Nos.: NPF-4 and NPF-7

cc: Distribution via Listserv

ML24017A080 SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS

NAME K. Wallace M. Donithan T. Stephen

DATE 01/10/24 1/10/24 1/11/24