White finding: Difference between revisions

From kanterella
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
|?start date
|?start date
|?description
|?description
|?cornerstone
|sort=start date
|sort=start date
|order=descending
|order=descending
Line 14: Line 15:
* Event (various sources)
* Event (various sources)
* Inspection, NRC will conduct a more detail inspection look at the issue and communicate a more than green concern with licensee.
* Inspection, NRC will conduct a more detail inspection look at the issue and communicate a more than green concern with licensee.
* Discussion between site and NRC about issue and significance (typically [[PRA]])
* Discussion between site and NRC about issue and significance (typically [[PRA]] and [[Senior Reactor Analyst]] (SRA) inspectors when the issue concerns safety systems)
* Exit - meeting to officially state the white finding
* Exit - meeting to officially state the white finding.
* Inspection report - contains a preliminary finding. Asks for acceptance or challenge.
* Inspection report - contains a preliminary finding. Asks for acceptance or challenge.
* Final Inspection Report - contains a final finding and this officiates the [[Reactor Oversight Process#NRC Action Matrix|change in ROP column]]
* Complete internal review of Finding. Typically, a [[root cause]] and/or [[self-assessment]].
* Notify NRC that the station is prepared for an inspection [[IP 95001]]
* Conduct NRC inspection [[IP 95001]]
* Inspection Report for [[IP 95001]] closes out White Input to ROP and moves station back down the [[Reactor Oversight Process#NRC Action Matrix|ROP action column]].


===Preliminary White Finding===
=== Preliminary White Finding ===
{{main|Preliminary White Finding}}
{{main|Preliminary White Finding}}
The '''Preliminary''' White Finding occurs when an Inspection Report documents the finding. It is, perhaps, the first official published step for the white finding issue.
The '''Preliminary''' White Finding occurs when an [[Inspection Report]] documents the finding. The [[Preliminary White Finding]] has a separate report number from the Final White Finding.
 
It is, perhaps, the first official published step for the white finding issue.
 
=== Final White Finding ===
{{main|Final Significance Determination of a White Finding}}
Label with a [[Inspection Report]] (separate from the [[Preliminary White Finding]]


==See also==
==See also==

Latest revision as of 13:24, 7 September 2024

A white finding is significant and relatively infrequent, but a site may expect to receive one of these every 10 years.

<list of white findings>

Sequence of a White finding

  • Event (various sources)
  • Inspection, NRC will conduct a more detail inspection look at the issue and communicate a more than green concern with licensee.
  • Discussion between site and NRC about issue and significance (typically PRA and Senior Reactor Analyst (SRA) inspectors when the issue concerns safety systems)
  • Exit - meeting to officially state the white finding.
  • Inspection report - contains a preliminary finding. Asks for acceptance or challenge.
  • Final Inspection Report - contains a final finding and this officiates the change in ROP column
  • Complete internal review of Finding. Typically, a root cause and/or self-assessment.
  • Notify NRC that the station is prepared for an inspection IP 95001
  • Conduct NRC inspection IP 95001
  • Inspection Report for IP 95001 closes out White Input to ROP and moves station back down the ROP action column.

Preliminary White Finding

The Preliminary White Finding occurs when an Inspection Report documents the finding. The Preliminary White Finding has a separate report number from the Final White Finding.

It is, perhaps, the first official published step for the white finding issue.

Final White Finding

Label with a Inspection Report (separate from the Preliminary White Finding

See also

  • Finding - General page for findings