ASME Code Case: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page with "'''ASME Code Case''' are model changes to the the ASME OM Code, per 10 CFR 50.55a. Applicants or licensees may submit a request to implement one or more of the Code Cases through 10 CFR 50.55a(z), which permits the use of alternatives to the Code requirements referenced in 10 CFR 50.55a. Applicants or licensees must submit a plant-specific request that addresses the Code Case at issue. * Regulatory Guide 1.147 * Regulatory Guide 1.193 See also: * [...")
 
No edit summary
 
Line 1: Line 1:
'''ASME Code Case''' are model changes to the the ASME OM Code, per [[10 CFR 50.55a]].
'''ASME Code Case''' are model changes to the the ASME OM Code, per [[10 CFR 50.55a]]. American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) code, [[ASME Section XI]].


Applicants or licensees may submit a request to implement one or more of the Code Cases through [[10 CFR 50.55a(z)]], which permits the use of alternatives to the Code requirements referenced in [[10 CFR 50.55a]]. Applicants or licensees must submit a plant-specific request that addresses the Code Case at issue.
Applicants or licensees may submit a request to implement one or more of the Code Cases through [[10 CFR 50.55a(z)]], which permits the use of alternatives to the Code requirements referenced in [[10 CFR 50.55a]]. Applicants or licensees must submit a plant-specific request that addresses the Code Case at issue.
Line 7: Line 7:


See also:
See also:
* [[ASME Code Case]]
* [[ASME Section XI]]
* [[Template:ASME Code Case-Nav]]
* [[Template:ASME Code Case-Nav]]
* [[:Category:ASME Code Case]]
* [[:Category:ASME Code Case]]

Latest revision as of 08:57, 28 August 2024

ASME Code Case are model changes to the the ASME OM Code, per 10 CFR 50.55a. American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) code, ASME Section XI.

Applicants or licensees may submit a request to implement one or more of the Code Cases through 10 CFR 50.55a(z), which permits the use of alternatives to the Code requirements referenced in 10 CFR 50.55a. Applicants or licensees must submit a plant-specific request that addresses the Code Case at issue.

See also: