ML20073A260: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20073A260 | | number = ML20073A260 | ||
| issue date = 03/08/1983 | | issue date = 03/08/1983 | ||
| title = Advises That Response to NRC | | title = Advises That Response to NRC Re Violations Noted in IE Insp Repts 50-269/82-43,50-270/82-43 & 50-287/82-43 Will Be Submitted by 830314 | ||
| author name = Tucker H | | author name = Tucker H | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8304110703 | | document report number = NUDOCS 8304110703 | ||
| title reference date = 02-09-1983 | |||
| package number = ML20073A166 | | package number = ML20073A166 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
Revision as of 16:51, 27 September 2022
| ML20073A260 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/08/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20073A166 | List: |
| References | |
| NUDOCS 8304110703 | |
| Download: ML20073A260 (1) | |
Text
. . O 9 DUKE POWER GOMPANY tj p j p C P E O P3 N r.o. nox aatso ,,,.g,.**'~
.a. .
CIIAHLoTTE, N.C. 28242 IIAL II. TUCKER TEIEPIION';
vna emessonst March 8r 1983 33 MAR 11 Pl2
- S(7f&) 373-4 Mr. James P, O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 303c3 Subj ect: Oconee Nuclear Station IE Inspection Report 50-269/82-43 50-270/82-43 50-287/82-43
Dear Sir:
With regard to your letter of February 9, 1983 which transmitted the subject inspection report, Duke Power Company was.to submit a response to the cited item of noncompliance by March 9, 1983. However, the response to the cited item of noncompliance is still under investigation and it is expected that the response will be submitted to you no later than March 14, 1983.
Very truly yours, fE. lrg
! Hal B. Tucker PFG/php I
i l
i I
l l
l i
83041.i.0703 830325 l PDR ADOCK 05000269 G
PDR 9
i
^