ML20132A804: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20132A804 | | number = ML20132A804 | ||
| issue date = 01/18/1985 | | issue date = 01/18/1985 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in Insp Repts 50-269/84-16,50-270/84-15 & 50-287/84-26.Response Will Be Completed,Reviewed & Submitted No Later than 850201 | ||
| author name = Tucker H | | author name = Tucker H | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8507230258 | | document report number = NUDOCS 8507230258 | ||
| title reference date = 12-21-1984 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| Line 25: | Line 26: | ||
==Dear Sir:== | ==Dear Sir:== | ||
-The subject Inspection Reports were transmitted by J. A. Olshinski through a December 21, 1984 letter, which required a response to the cited items of non-compliance to be submitted by January 18, 1985. However, a response is incomplete at this time. It is expected that a response will be completed, reviewed, and submitted to you no later than February 1, 1985. | -The subject Inspection Reports were transmitted by J. A. Olshinski through a {{letter dated|date=December 21, 1984|text=December 21, 1984 letter}}, which required a response to the cited items of non-compliance to be submitted by January 18, 1985. However, a response is incomplete at this time. It is expected that a response will be completed, reviewed, and submitted to you no later than February 1, 1985. | ||
Very truly yours, | Very truly yours, | ||
&cd k 4 & | &cd k 4 & | ||
Revision as of 06:43, 10 August 2022
| ML20132A804 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/18/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Oreilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8507230258 | |
| Download: ML20132A804 (1) | |
Text
__ - -
DUKE POWER GOMPANY P.O. BOX 33180 CIKARLOTTE, N.C. 28242 HALH. TUCKER TELEPHONE vna enesmany (704) 373-4531
- . - - 85 LWNy A89.39lH Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Subject:
Oconee Nuclear Station IE Inspection Report Nos. 50-269/84-16 50-270/84-15 50-287/84-26
Dear Sir:
-The subject Inspection Reports were transmitted by J. A. Olshinski through a December 21, 1984 letter, which required a response to the cited items of non-compliance to be submitted by January 18, 1985. However, a response is incomplete at this time. It is expected that a response will be completed, reviewed, and submitted to you no later than February 1, 1985.
Very truly yours,
&cd k 4 &
Hal B. Tucker SGG: sib Attachment cc: Mr. J. C. Bryant NRC. Resident Inspector Oconee Nuclear Station 85072go gj@go!69 5" F "'