ML21145A040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Crew 1 (U1, R1, R2)
{{#Wiki_filter:}}
Facility: Clinton Power Station                        Date of Exam: 3/29/2021                Operating Test No.: 2021-301 A        E                                                        Scenarios P        V 1 (Spare)                      2                  3                    4              T      M P        E O        I L        N      CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S      A        B        S      A    B    S      A      B      S      A      B                I C                                                                                                              A R      T        O        R      T    O    R      T      O      R      T      O              M A        T                                                                                                    L O      C        P        O      C      P    O      C      P      O      C      P              U N          Y M(*)
T        P E                                  U1      R1    R2    U1      R2      R1                                R      I U RO          RX                                  5                  2                                            2      1    1 0 NOR                                1                  1                                            2      1    1 1 SRO-I I/C                                2,3,4,6            3,4,5,6                                      8      4    4 2 SRO-U      MAJ                                7                  7                                            2      2    2 1 X U1 TS                                  2,4                3,6                                          4      0    2 2 RO          RX                                          5                                                        1      1    1 0 X R1 NOR                                                                    1                            1      1    1 1 SRO-I I/C                                        4,6                        4,6                          4      4    4 2 SRO-U      MAJ                                        7                          7                            2      2    2 1 TS                                                                                                    0      0    2 2 RO          RX                                                              2                                    1      1    1 0 X R2 NOR                                              1                                                  1      1    1 1 SRO-I I/C                                              2,3          3,5                                  4      4    4 2 SRO-U      MAJ                                              7            7                                    2      2    2 1 TS                                                                                                    0      0    2 2 RO          RX                                                                                                          1    1 0 NOR                                                                                                          1    1 1 SRO-I I/C                                                                                                          4    4 2 SRO-U      MAJ                                                                                                          2    2 1 TS                                                                                                          0    2 2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                                        Transient and Event Checklist                                    Form ES-301-5 Crew 2 (I1, I2, R3)
Facility: Clinton Power Station                        Date of Exam: 3/29/2021                Operating Test No.: 2021-301 A        E                                                        Scenarios P        V 1 (Spare)                      2                  3                      4            T      M P        E O        I L        N      CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S      A        B        S        A    B    S      A      B      S      A      B              I C                                                                                                              A R      T        O        R        T    O    R      T      O      R      T      O            M A        T                                                                                                    L O      C        P        O      C    P    O      C      P      O      C      P            U N          Y M(*)
T        P E                                  I1      I2  R3    I2      I1      R3      I1    R3      I2        R      I U RO          RX                                  5                          2              3                      3      1    1 0 NOR                                1                                          1                      2      1    1 1 SRO-I X I1      I/C                                2,3,4,6                    3,5            2,4,5,7                10    4    4 2 SRO-U      MAJ                                7                          7              8                      3      2    2 1 TS                                  2,4                                        4,6                    4      0    2 2 RO          RX                                          5          2                                            2      1    1 0 NOR                                                    1                                      1      2      1    1 1 SRO-I X I2      I/C                                          4,6        3,4,5,6                                2,5    8      4    4 2 SRO-U      MAJ                                          7          7                                      8      3      2    2 1 TS                                                      3,6                                          2      0    2 2 RO          RX                                                                                    3              1      1    1 0 X R3 NOR                                              1                    1                            2      1    1 1 SRO-I I/C                                              2,3                  4,6            4,7            6      4    4 2 SRO-U      MAJ                                              7                    7              8              3      2    2 1 TS                                                                                                    0      0    2 2 RO          RX                                                                                                          1    1 0 NOR                                                                                                          1    1 1 SRO-I I/C                                                                                                          4    4 2 SRO-U      MAJ                                                                                                          2    2 1 TS                                                                                                          0    2 2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                                        Transient and Event Checklist                                    Form ES-301-5 Crew 3 (I3, I4, I5)
Facility: Clinton Power Station                        Date of Exam: 3/29/2021                Operating Test No.: 2021-301 A        E                                                        Scenarios P        V 1 (Spare)                      2                  3                      4            T      M P        E O        I L        N      CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S      A        B        S      A    B    S      A      B      S      A      B              I C                                                                                                              A R      T        O        R      T    O    R      T      O      R      T      O            M A        T                                                                                                    L O      C        P        O      C      P    O      C      P      O      C      P            U N          Y M(*)
T        P E                                  I3      I4    I5    I5      I3      I4      I4    I5      I3        R      I U RO          RX                                  5                          2                                    2      1    1 0 NOR                                1                                                          1      2      1    1 1 SRO-I X I3      I/C                                2,3,4,6                    3,5                            2,5    8      4    4 2 SRO-U      MAJ                                7                          7                              8      3      2    2 1 TS                                  2,4                                                              2      0    2 2 RO          RX                                          5                                  3                      2      1    1 0 NOR                                                                    1      1                      2      1    1 1 SRO-I X I4      I/C                                        4,6                        4,6    2,4,5,7                8      4    4 2 SRO-U      MAJ                                        7                          7      8                      3      2    2 1 TS                                                                            4,6                    2      0    2 2 RO          RX                                                      2                              3              2      1    1 0 NOR                                              1    1                                            2      1    1 1 SRO-I X I5      I/C                                              2,3  3,4,5,6                        4,7            8      4    4 2 SRO-U      MAJ                                              7    7                              8              3      2    2 1 TS                                                      3,6                                          2      0    2 2 RO          RX                                                                                                          1    1 0 NOR                                                                                                          1    1 1 SRO-I I/C                                                                                                          4    4 2 SRO-U      MAJ                                                                                                          2    2 1 TS                                                                                                          0    2 2 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Revision as of 11:39, 17 January 2022