IR 05000285/1985025: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML20212P974 | ||
| issue date = | | issue date = 08/28/1986 | ||
| title = Ack Receipt of Informing NRC of Steps Taken to Correct | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/85-25 | ||
| author name = Gagliardo J | | author name = Gagliardo J | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | ||
| Line 10: | Line 10: | ||
| license number = | | license number = | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS | | document report number = NUDOCS 8609030353 | ||
| title reference date = | | title reference date = 07-31-1986 | ||
| package number = | | package number = ML20212P977 | ||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. , , | ||
AUG 2 81986 In Reply Refer To: | |||
Docket: 50-285/85-25 Omaha Public Power District ATTN: R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen: | Docket: 50-285/85-25 Omaha Public Power District ATTN: R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen: | ||
Thank you for your letter of | Thank you for your letter of July 31, 1986, providing an update on the status of commitments made in your letter dated July 13, 1986, that responded to NRC Inspection Report 50-285/85-25 and the Notice of Violation. We will review the implementation of your corrective actions during future inspections and after October 1, 1986, when detector RM-063H will have been calibrate | ||
Sincerely, | Sincerely, J. E. Gagliardo, Chief Reactor Projects Branch cc: | ||
W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Es LeBoeuf, Lamb, Leiby & MacRae ' | |||
1333 New Hampshire Avenue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bcc: (see next page) | |||
Reactor Projects Branch cc: | ' | ||
W. G. Gates, Manager | f RIV:FRPS C:FRPS f C:R&P C:R C:RPB 4 RBaer:cd BMurray WLFis h DRHun er JEG lia7do | ||
/86 ( / /86 q///86 j/4/86 7 )/ /8 u | |||
Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Es LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 | 86090303S3 860320 6h PDR ADOCK 05000285 V G PDR 0( | ||
- _ - - - - - - - - - - - - - - - - - - - - - a | |||
Kansas Radiation Control Program Director | |||
RIV: | |||
. | |||
.#- ak Omaha Public Power District -2-bcc w/1tr dtd 7/31/86 from licensee: | |||
DMB (IE06) | |||
. | RPB Resident Inspector R. D. Martin, RA R&SPB Section Chief (RPB/B) MIS System RIV File DRSP RSTS Operator RSB DWeiss, LFMB (AR-2015) | ||
Omaha Public Power District -2- | |||
RPB Resident Inspector | |||
R. D. Martin, RA | |||
}} | }} | ||
Revision as of 19:01, 18 December 2021
| ML20212P974 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/28/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20212P977 | List: |
| References | |
| NUDOCS 8609030353 | |
| Download: ML20212P974 (2) | |
Text
. , ,
AUG 2 81986 In Reply Refer To:
Docket: 50-285/85-25 Omaha Public Power District ATTN: R. L. Andrews, Division Manager-Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
Thank you for your letter of July 31, 1986, providing an update on the status of commitments made in your letter dated July 13, 1986, that responded to NRC Inspection Report 50-285/85-25 and the Notice of Violation. We will review the implementation of your corrective actions during future inspections and after October 1, 1986, when detector RM-063H will have been calibrate
Sincerely, J. E. Gagliardo, Chief Reactor Projects Branch cc:
W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Es LeBoeuf, Lamb, Leiby & MacRae '
1333 New Hampshire Avenue, NW Washington, DC 20036 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bcc: (see next page)
'
f RIV:FRPS C:FRPS f C:R&P C:R C:RPB 4 RBaer:cd BMurray WLFis h DRHun er JEG lia7do
/86 ( / /86 q///86 j/4/86 7 )/ /8 u
86090303S3 860320 6h PDR ADOCK 05000285 V G PDR 0(
- _ - - - - - - - - - - - - - - - - - - - - - a
.
.#- ak Omaha Public Power District -2-bcc w/1tr dtd 7/31/86 from licensee:
DMB (IE06)
RPB Resident Inspector R. D. Martin, RA R&SPB Section Chief (RPB/B) MIS System RIV File DRSP RSTS Operator RSB DWeiss, LFMB (AR-2015)