Revision as of 19:58, 12 December 2021
| ML20139A145 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/18/2020 |
| From: | Vincent Gaddy Region 4 Engineering Branch 1 |
| To: | Peters K Vistra Operations Company |
| References | |
| IR 2020010 | |
| Download: ML20139A145 (9) | |
See also: IR 05000445/2020010
Text
May 18, 2020
Mr. Ken Peters
Senior Vice President and Chief Nuclear Officer
Attention: Regulatory Affairs
Vistra Operations Company LLC
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC DESIGN BASES ASSURANCE INSPECTION
(PROGRAMS) (05000445/2020010 AND 05000446/2020010) AND INITIAL
REQUEST FOR INFORMATION
Dear Mr. Peters:
On August 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an onsite
inspection at the Comanche Peak Nuclear Power Plant. A three-person team will perform this
inspection using NRC Inspection Procedure 71111.21N.02, Design Bases Inspection
(Programs), Attachment 2, Design-Basis Capability of Power-Operated Valves Under
Title 10 of the Code of Federal Regulations (10 CFR) 50.55a Requirements.
This inspection will evaluate the reliability, functional capability, and design basis of
risk-important power-operated valves as required by 10 CFR 50.55a and applicable
10 CFR Part 50, Appendix A and Appendix B, requirements, and as required by the Comanche
Peak Nuclear Power Plant Operating License. Additionally, the team will perform an inspection
of the documentation files to verify that the plant activities associated with safety-related
motor-operated valves meet your commitments to Generic Letter (GL) 89-10, Safety-Related
Motor-Operated Valve Testing and Surveillance, and GL 96-05, "Periodic Verification of
Design-Basis Capability of Safety-Related Motor-Operated Valves." In conducting this
inspection, the team will select power-operated valves used to prevent and mitigate the
consequences of a design basis accident.
The inspection will include an information gathering site visit by the team leader and 2 weeks of
onsite inspection by the team. The inspection will consist of three NRC inspectors. The current
inspection schedule is as follows:
Onsite Information Gathering Visit: July 28-29, 2020
Preparation Weeks: August 3-7, 2020, and August 17 - 21, 2020
Onsite Weeks: August10-14, 2020, and August 24 - 28, 2020
K. Peters 2
The purpose of the information gathering visit is to meet with members of your staff to become
familiar with the power-operated valve activities at the Comanche Peak Nuclear Power Plant.
The lead inspector will request a meeting with your personnel to discuss the site power-
operated valve procedures. Additionally, the lead inspector will request a discussion with your
staff to become familiar with the regulations and standards applicable to power-operated valves
at the site. Additional information and documentation needed to support the inspection will be
identified during the inspection, including interviews with engineering managers and engineers.
In order to minimize the inspection impact on the site and to ensure a productive inspection, we
have enclosed a request for information needed for the inspection. This information should be
made available to the lead inspector during the July 28-29, 2020, visit. Since the inspection will
be concentrated on safety-related and risk-significant power-operated valves, a list of such
power-operated valves should be available to review during and following the information
gathering visit to assist in our selection of appropriate power-operated valves to review.
It is requested that this information be provided to the lead inspector as the information is
generated during the inspection. Additional requests by inspectors will be made during the
onsite weeks for specific documents needed to complete the review of specific power-operated
valves and associated activities. It is important that all of these documents are up-to-date and
complete in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we
request that a contact individual be assigned to each inspector to ensure information requests,
questions, and concerns are addressed in a timely manner.
The lead inspector for this inspection is Wayne C. Sifre. We understand that our licensing
engineer contact for this inspection is Gary Murka. If there are any questions about
the inspection or the requested materials, please contact the lead inspector by telephone
at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.
Paperwork Reduction Act Statement
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
The burden to the public for these voluntary information collections is estimated to average
2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing and reviewing the
information collection. You may submit comments on any aspect of the information collection,
including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to INFOCOLLECTS.RESOURCE@NRC.GOV; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
K. Peters 3
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 05000445 and 05000446
License Nos. NPF-87 and NPF-89
Enclosure:
Design Bases Assurance Inspection
(Programs) Power-Operated Valve
Initial Request for Information
w/Attachment: Comanche Peak
Valves of Interest
cc w/ encl: Distribution via LISTSERV
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: WCS Yes No Publicly Available Sensitive NRC-002
OFFICE SRI:EB1 C:EB1
NAME WSifre VGaddy
SIGNATURE /RA/ /RA/
DATE 05/18/2020 05/18/2020
Initial Request for Information
Design Bases Assurance Inspection (Programs), Power-Operated Valves
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2
Inspection Report: 05000445/2020010 AND 05000446/2020010
Information Gathering Dates: July 28-29, 2020
Inspection Dates: August 10-14, 2020 and August 24-28, 2020
Inspection Procedure: IP 71111, Attachment 21N.02, Design Bases Assurance
Inspection (Programs) Attachment 2, Design-Basis
Capability of Power-Operated Valves Under
10 CFR 50.55a Requirements
Lead Inspector: Wayne C. Sifre, Senior Reactor Inspector
Inspectors: Gerond George, Senior Reactor Inspector
Wes Cullum, Reactor Inspector
I. Information Requested for Information Gathering Visit (July 28, 2020)
The following information should be provided to the lead inspector in hard copy or
electronic format to the attention of Wayne Sifre by July 20, 2020, to facilitate the
reduction in the items to be selected for a final list of components. The inspection team
will finalize the selected list during the prep week using the documents requested in this
enclosure. The specific items selected from the lists shall be available and ready for
review on the day indicated in this request. *Please provide requested documentation
electronically in pdf files, Excel, or other searchable formats, if possible. The
information should contain descriptive names and be indexed and hyperlinked to
facilitate ease of use. Information in "lists" should contain enough information to be
easily understood by someone who has knowledge of pressurized water reactor
technology. If requested documents are large and only hard copy formats are available,
please inform the inspectors and provide subject documentation during the first day of
the onsite inspection.
1. Provide the valve characteristics for the valves listed in the attached list as described
in Appendix C of NRC Inspection Procedure 71111.21N.02, Design Bases
Inspection (Programs), Attachment 2, Design-Basis Capability of Power-Operated
Valves Under 10 CFR 50.55a Requirements.
2. List of power-operated valves (POVs) important to safety for the Comanche Peak
Nuclear Power Plant. The list should include (a) component identification number;
(b) applicable plant system; (c) American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code (BPVC) Class; (d) safety-related or non-safety
related classification; (e) valve type, size and manufacturer; and (f) actuator type,
size, and manufacturer. If the NRC has granted a license amendment to categorize
structures, systems, and component in accordance with 10 CFR 50.69, please
provide the risk-informed safety category of the component.
Enclosure
3. Listing of the POVs sorted by risk importance, including external risk considerations.
4. Comanche Peak Nuclear Power Plant word-searchable updated final safety analysis
report (UFSAR), License Conditions, Technical Specifications, and most recent
Inservice Testing (IST) program plan. Specifically identify which UFSAR sections
address environmental, seismic, and functional qualification of POVs.
5. NRC Safety Evaluation Report(s) associated with the Comanche Peak Nuclear
Power Plant IST program and relief and alternative requests submitted in
accordance with 10 CFR 50.55a for POVs.
6. Identify the edition of the ASME Operation and Maintenance of Nuclear Power Plants
(OM Code) that is the Code of Record for the current 10-year IST Program interval,
as well as any standards to which the Comanche Peak Nuclear Power Plant has
committed with respect to POV capability and testing.
7. Comanche Peak Nuclear Power Plant Power Operated Valve Program Documents.
8. List of systems, system numbers/designators and corresponding names.
9. List of site contacts that will be associated with the inspection.
II. Discussions Requested
1. Interview with a Comanche Peak Nuclear Power Plant representative to discuss site
POV capability analyses, including plant drawings and assumptions. This includes
analysis for accident conditions.
2. Interview with a Comanche Peak Nuclear Power Plant representative to discuss
POV maintenance elements as integrated into plant programs and procedures.
3. Interview with a Comanche Peak Nuclear Power Plant representative to discuss
maintaining the design-basis capability of POVs if they have entered a period of
extended operation, if applicable.
III. Information Requested for Inspection Preparation (August 3, 2020)
1. Documentation files, including test reports, for the electrical and mechanical
components associated with the POVs selected by the lead inspector (10 specific
valves will be identified and communicated to you prior to August 3, 2020).
2. References associated with the electrical and mechanical components document
files.
3. Vendor manuals and technical sheets associated with the selected POVs.
4. Tours of the rooms in which the selected POVs are installed.
2
Inspector Contact Information:
Wayne C. Sifre Gerond George Wes Cullum
Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector
817-200-1193 817-200- 1562 817-200- 1563
Wayne.Sifre@nrc.gov Gerond.George@nrc.gov Wes.Cullum@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Wayne Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4
3
Comanche Peak Valves of Interest
No. ACT Size Valve System Utility ID Selection
(in) Type Basis
1. MOV 8 Gate Unit 1 - AFW - AFW Pump 1-HV-2482 Risk
Emergency Supply Flowpath
2. MOV 8 Gate Unit 1 - CVCS - ECCS 1-LCV-0112E Risk
Injection Flowpath &
Boration
3. AOV 10 Butterfly Unit 1 - CCW - Flowpath 1-FV-4537 Risk
Boundary
4. AOV 3 Ball Unit 1 - CCW - Safety 1-PV-4553
Chilled Water Condenser
Cooling
5. AOV 3 Diaphragm Containment Isolation 1-LCV-1003 LERF
6. AOV 18 Globe Unit 1 - Feedwater Isolation 1-FCV-0540
7. HOV 18 Gate Unit 1 - Feedwater Isolation 1-HV-2134 LERF
& Containment Isolation
8. AOV 3 Globe Unit 1 - RCS - Post Accident 1-PCV-0455A Risk
Vent Path/Vent Path
Isolation
9. MOV 12 Gate Unit 1 - RHR - 1-8701B Risk
Flowpath/Containment
Isolation
10. MOV 8 Gate Unit 1 - SI - ECCS 1-8804B Risk
Recirculation
Flowpath/Passive Pipe
Break Isolation
11. MOV 4 Gate Unit 1 - SI - ECCS to Cold 1-8835 Risk
Legs Flowpath/ECCS to Hot
Legs Flowpath
12. MOV 10 Gate Unit 1 - SI - ECCS to Cold 1-8809B Risk
Legs Flowpath/ECCS to Hot
Legs Flowpath
13. MOV 10 Gate Unit 1 - SI - ECCS to Hot 1-8840 Risk
Legs Flowpath/ECCS to
Cold Legs
14. MOV 24 Butterfly Unit 1 - Service Water 1-HV-4287 Risk
Flowpath/Throttling
15. MOV 4 Gate Unit 2 - Containment 2-HV-2492B Risk
Isolation & AFW to Faulted
SG Flow
16. MOV 2 Globe Unit 2 - CVCS - ECCS 2-8110 Risk
Flowpath Boundary
17. AOV 10 Butterfly Unit 2 - CCW Flowpath 2-FV-4536 Risk
Boundary
18. MOV 18 Butterfly Unit 2 - CCW - RHR Heat 2-HV-4572 Risk
Exchanger Cooling Flowpath
Attachment
No. ACT Size Valve System Utility ID Selection
(in) Type Basis
19. AOV 3 Ball CCW - - Safety Chilled 2-PV-4552 Risk
Water Condenser Cooling
20. AOV 18 Globe Feedwater Isolation 2-FCV-0520 Risk
21. HOV 18 Gate Feedwater Isolation & 2-HV-2137 Risk
Containment Isolation
22. HOV 2 Globe Unit 2 - FW - Feedwater 2-HV-2137 Risk
Isolation & Containment
Isolation
23. HOV 2 Globe Unit 2 - MS - Steam Line 2-HV-2333A Risk
Isolation & Containment
Isolation
24. MOV 3 Gate Unit 2 - RCS - Post Accident 2-8000A Risk
Vent Path/Vent Path
Isolation
25. MOV 6 Gate Unit 2 - SI - ECCS Flowpath 2-8806 Risk
Boundary (during
Recirculation)
26. MOV 14 Gate Unit 2 - SI - ECCS 2-8811A Risk
Recirculation
Flowpath/Containment
Isolation
27, MOV 10 Gate Unit 2 - SI - ECCS to Cold 2-8809A Risk
Legs Flowpath/ECCS to Hot
Legs Flowpath
28. MOV 4 Gate Unit 2 - SI - - ECCS to Hot 2-8802B Risk
Legs Flowpath/ECCS to
Cold Legs
29. MOV 6 Gate Unit 2 - SI - Passive Pipe 2-8923B Risk
Break Isolation
A-2