ML20154P067: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML20154P067
| number = ML20154P067
| issue date = 04/28/1988
| issue date = 04/28/1988
| title = Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants Dtd 880412 Complete
| title = Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants Complete
| author name = Zech L
| author name = Zech L
| author affiliation = NRC COMMISSION (OCM)
| author affiliation = NRC COMMISSION (OCM)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8806030194
| document report number = NUDOCS 8806030194
| title reference date = 04-12-1988
| package number = ML20154N970
| package number = ML20154N970
| document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS
| document type = CORRESPONDENCE-LETTERS, INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE, NRC TO ACRS

Revision as of 02:56, 10 December 2021

Requests Close Coordination W/Edo to Ensure That Review of Shutdown Nuclear Power Plants Complete
ML20154P067
Person / Time
Site: Peach Bottom, Pilgrim, 05000000
Issue date: 04/28/1988
From: Zech L
NRC COMMISSION (OCM)
To: Kerr W
Advisory Committee on Reactor Safeguards
Shared Package
ML20154N970 List:
References
NUDOCS 8806030194
Download: ML20154P067 (1)


Text

{{#Wiki_filter:_ _ _ _ ~ l

      .    ,-                                                                                                                 1 UNITED STATES

[ " o NUCLE AR REGULATORY COMMISSION l j W ASHINGT ON, D. C. 20555

 ! ' kb I .. oi' a

Ny**..+[/ 3- -{ygg

                                                           *          / 7'";~ 3          'Aldibb b '      y.n CHAIRMAN                                                      p ;l , f EWCS.U.SKR.C-                   -g
                                                                                                             *O
                                                                                        ,- 1963
  • a N.c.mg,4[d kI 1 MEMORANDUM FOR:

William Kerr, Chairman Advisory Comittee on Reactorpafeguards FR0K: Lando W. Zech, Jr. W. (F 8

SUBJECT:

ACRS LETTER REGARDING REVIEW 0F SHUTDOWN NUCLEAR POWER PLANTS DATED APRIL 12, 1988 , In the above subject letter, I was infomed that ACRS plans to review several nuclear power plants that have either been shutdown for an extended period and are now being considered for restart or have been delayed in initial startup for a longer period than usual. In scheduling these reviews, please coordinate closely with the Executive Director for Operation?s office to ensure that your review of these plants, such as Pilgrim and Peach Bottom, can be complete, and any concerns on these plants raised to Comission attention, sufficiently ahead of the date for a Commission vote on restart of these plants. cc: Comissioner Roberts Comissioner Bernthal Comissioner Carr l Comissioner Roberts  ! EDO l OGC l SECY I l l P l C* 8806030194 880525 PDR ADOCK 05000171 P PDR f f bb i l}}