| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | ||
| page count = 4 | | page count = 4 | ||
| project = | | project = TAC:MA3696 | ||
| stage = Withdrawal | | stage = Withdrawal | ||
}} | }} | ||
| Line 26: | Line 26: | ||
==Dear Mr. Sullivan:== | ==Dear Mr. Sullivan:== | ||
By letter dated September 25,1998, Boston Edison Company (BECo) requested an exemption from the criticality accident monitoring requirements of 10 CFR 70.24 for the Pilgrim Nuclear Power Station. This request was made in accordance with guidance provided in SECY 97-155, dated July 21,1997, and NRC Information Notice 97-77, dated October 10,1997. By letter dated November 24,1998, BECo withdraws this 10 CFR 70.24 exemption request. | By {{letter dated|date=September 25, 1998|text=letter dated September 25,1998}}, Boston Edison Company (BECo) requested an exemption from the criticality accident monitoring requirements of 10 CFR 70.24 for the Pilgrim Nuclear Power Station. This request was made in accordance with guidance provided in SECY 97-155, dated July 21,1997, and NRC Information Notice 97-77, dated October 10,1997. By {{letter dated|date=November 24, 1998|text=letter dated November 24,1998}}, BECo withdraws this 10 CFR 70.24 exemption request. | ||
On November 12,1998,10 CFR 70.24 was revised and a new regulation,10 CFR 50.68, was issued (Federal Register pages 63127-63130). The revision to 70.24(d)(1) allows a Part 50 licensee, such as Pilgrim, to be exempt from criticality accident monitoring requirements if the licensee complies with the requirements of 50.68(b). The requirements are similar to those previously used by the NRC to grant exempions to 70.24 and which Pilgrim's September 25, 1998, exemption request addressed; therefore, Pilgrim's exemption request is no longer l needed because the new rule makes the exemption unnecessary. By this letter, we consider ! | On November 12,1998,10 CFR 70.24 was revised and a new regulation,10 CFR 50.68, was issued (Federal Register pages 63127-63130). The revision to 70.24(d)(1) allows a Part 50 licensee, such as Pilgrim, to be exempt from criticality accident monitoring requirements if the licensee complies with the requirements of 50.68(b). The requirements are similar to those previously used by the NRC to grant exempions to 70.24 and which Pilgrim's September 25, 1998, exemption request addressed; therefore, Pilgrim's exemption request is no longer l needed because the new rule makes the exemption unnecessary. By this letter, we consider ! | ||
the exemption request withdrawn and al! work under TAC No. MA3696 to be complete. ' | the exemption request withdrawn and al! work under TAC No. MA3696 to be complete. ' | ||
| Line 46: | Line 46: | ||
WITHDRAWAL OF 70.24(a) EXEMPTION REQUEST CONCERNING CRITICALITY ACCIDENT MONITORING REQUIREMENTS (TAC NO. MA3696) | WITHDRAWAL OF 70.24(a) EXEMPTION REQUEST CONCERNING CRITICALITY ACCIDENT MONITORING REQUIREMENTS (TAC NO. MA3696) | ||
Dear Mr. Sullivat. | Dear Mr. Sullivat. | ||
By letter dated September 25,1998, Boston Edison Company (BECo) requested an exemptim from the criticality accident monitoring requirements of 10 CFR 70.24 for the Pilgrim Nucle 1 Power Station. This request was made in accordance with guidance provided in SEC" 97-155, dated July 21,1997, and NRC Information Notice 97-77, dated October 10,1907. By letter dated November 24,1998, BECo withdrec, this 10 CFR 70.24 exemption request. | By {{letter dated|date=September 25, 1998|text=letter dated September 25,1998}}, Boston Edison Company (BECo) requested an exemptim from the criticality accident monitoring requirements of 10 CFR 70.24 for the Pilgrim Nucle 1 Power Station. This request was made in accordance with guidance provided in SEC" 97-155, dated July 21,1997, and NRC Information Notice 97-77, dated October 10,1907. By {{letter dated|date=November 24, 1998|text=letter dated November 24,1998}}, BECo withdrec, this 10 CFR 70.24 exemption request. | ||
i On November 12,1998,10 CFR 70.24 was revised and a new regulation,10 CFR 50.68, was issued (Federal Register pages 63127-63130). The revision to 70.24(d)(1) allows a Part 50 ) | i On November 12,1998,10 CFR 70.24 was revised and a new regulation,10 CFR 50.68, was issued (Federal Register pages 63127-63130). The revision to 70.24(d)(1) allows a Part 50 ) | ||
l i | l i | ||
Revision as of 23:22, 7 December 2021
| ML20199H581 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/20/1999 |
| From: | Bill Dean NRC (Affiliation Not Assigned) |
| To: | Ted Sullivan BOSTON EDISON CO. |
| References | |
| TAC-MA3696, NUDOCS 9901250242 | |
| Download: ML20199H581 (4) | |
Text
._
' Mr. Th:odora A. Sullivan January 20, 1999 Vic3 Pr:sid:nt Nucl3:r and Station Director Boston Edison Company Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, MA 02360
SUBJECT:
WITHDRAWAL GF 70.24(a) EXEMPTION REQUEST CONCERNING CRITICALITY ACCIDENT MONITORING REQUIREMENTS (TAC NO. MA3696)
Dear Mr. Sullivan:
By letter dated September 25,1998, Boston Edison Company (BECo) requested an exemption from the criticality accident monitoring requirements of 10 CFR 70.24 for the Pilgrim Nuclear Power Station. This request was made in accordance with guidance provided in SECY 97-155, dated July 21,1997, and NRC Information Notice 97-77, dated October 10,1997. By letter dated November 24,1998, BECo withdraws this 10 CFR 70.24 exemption request.
On November 12,1998,10 CFR 70.24 was revised and a new regulation,10 CFR 50.68, was issued (Federal Register pages 63127-63130). The revision to 70.24(d)(1) allows a Part 50 licensee, such as Pilgrim, to be exempt from criticality accident monitoring requirements if the licensee complies with the requirements of 50.68(b). The requirements are similar to those previously used by the NRC to grant exempions to 70.24 and which Pilgrim's September 25, 1998, exemption request addressed; therefore, Pilgrim's exemption request is no longer l needed because the new rule makes the exemption unnecessary. By this letter, we consider !
the exemption request withdrawn and al! work under TAC No. MA3696 to be complete. '
Sincerely, l l
/s/ h William M. Dean, Director Project Directorate 1-2 q Division Reactor Projects - l/ll Office of Nuclear Reactor Regulation hf Docket No. 50-293
/
cc: See next page DISTRIBUTION: PDI-2 r/f WDean l Docket File AWang CCowgill, RI l
PUBLIC TClark MConner NRC Resident inspector HMiller, RA WAxelson ACRS OGC JZwolinski DOCUMENT NAME: X:\DR P E\PDI-3\PILG RIM \MA3696.WPD To receive a copy s.! this documer.t, inosste in the bar: *C" = Copy without enclosures "E" = Cop" with enclosures *N" = No copy OFFICE Pol-LPM lE LA.PDI-2 ,,jp .E o.PDI-2 N pME Aswang g> Ttclark; FA./ woean (LIAD DATE 014899 01/Nm otifQ99 OFFICIAL RECORD COPY
.30048 990
^ "
8"1250242990120 " 9&T pg g g g aSG7V
90 %q 4f t UNITED STATES l ;! g l # NUCLEAR REGULATORY COMMISSION 2 WASHINGTON, D.C. 20666.c001 January 20, 1999 t
%[.....
l Mr. Theodore A. Sullivan Vice President Nuclear and Station Director l Boston Edison Company Pilgrim Nuclear Power Station
. RFD #1 Rocky Hill Road Plymouth, MA 02360 l
SUBJECT:
WITHDRAWAL OF 70.24(a) EXEMPTION REQUEST CONCERNING CRITICALITY ACCIDENT MONITORING REQUIREMENTS (TAC NO. MA3696)
Dear Mr. Sullivat.
By letter dated September 25,1998, Boston Edison Company (BECo) requested an exemptim from the criticality accident monitoring requirements of 10 CFR 70.24 for the Pilgrim Nucle 1 Power Station. This request was made in accordance with guidance provided in SEC"97-155, dated July 21,1997, and NRC Information Notice 97-77, dated October 10,1907. By letter dated November 24,1998, BECo withdrec, this 10 CFR 70.24 exemption request.
i On November 12,1998,10 CFR 70.24 was revised and a new regulation,10 CFR 50.68, was issued (Federal Register pages 63127-63130). The revision to 70.24(d)(1) allows a Part 50 )
l i
!icensee, such as Pilgrim, to be exempt from criticality accident monitoiing requirements if the l licensee complies with the requirements of 50.6B(b). The requirements are similar to those l
previously used by the NRC to grant exemptions to 70.24 and which Pilgrim's September 25, j 1998, exemption request addressed; therefore, Pilgrim's exemption request is no longer i needed because the new rule makes the exemption unnecessary. By this letter, we consider the exemption request withdrawn and all work under TAC No MA3696 to be complete.
Sincerely, i ( kl '
1 Willian: M C aan, Director Project Diractorate 1-2 l
Division Reactor Projects - t/!!
Office of Nuclear Reactor Regulation i
Docket No. 50-293 cc: See next page
Mr. Th:od:re A. Sulliv:n
. Boston Edison C:mp ny Pilgrim Nucl:cr Pow:r Station cc:
Mr. Ron Ledgett Mr. Jack Alexander Executive Vice President Manager, Reg. Relations and Quality 800 Bcyteston Street Assurance Bostor, MA 02199 Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road ;
Resident inspector Plymouth, MA 02360 U. S. Nuclear Regulatory Commission
~
% Nuclear Power Station Mr. David F. Tarantino Office Box 867 Nuclear leformation M; nager Plymouth, MA 02360 Pilgrim Nusar Power Station RFD #1, Rocky Hill Road Chairman, Board of Selectmen Plymouth, MA 02360 11 Lincoln Street Plymouth, MA 02360 Ms. Kathleen M. O'Toole Secretary of Public Nfety Chaivnan, Duxbury Board of Selectmen Executive Office of Public Safety Towra Hall One Ashburton Flace 878 Tremont Street Boston, MA 02108 Duxbury, MA 02332 Mr. Peter LaPorte, Director Office of the Commissioner Attn: James Muckerheide Massachusetts Department of Massachusetts Emergency Management Environmental Protection Agency One Winter Street 400 Worcester Road Boston, MA 02108 P.O. W 1496 Frarrr. guam, MA 01701-0317 Office of the Attorney General One Achbudon Place Chairman, Citizens Urging 20th Flcor Responsible Energy Boston, MA 02108 P.O. Scx 2621 Duxbury, MA 02331 Mr. Robert M. Hallisey, Director Radiation Control Program Citizens at Risk Massachusetts Department of P.O. Box 3803 Public Health Plymouth, MA 02361 305 South Street Boston, MA 02130 W.S. Stowe, Esquire Boston Edison Company Regional Administrator, Region i 800 Boyleston St.,36th Floor U. S. Nuclear Regulatory Commission Boston, MA 02199 475 Allendale Road King of Prussia, PA 19406 Chairman Nuclear Matters Committee Ms. Jane Fleming Town Hall 8 Oceanwood Drive 11 Lincoln Street Duxbury, MA 0233 Plymouth, MA 02360 Mr. James Keyes Mr. William D. Meinert Acting Licensing Division Manager Nuclear Engineer Boston Edison Company Massachusetts Municipal Wholesale 600 Rocky Hill Road Electric Company Plymouth, MA 02360 5599 P.O. Box 426 Ludlow, MA 01056-0426
l l l l Ms. Mary Lampert, Director Massachusetts Citizens for Safe Energy 148 Washington Street Duxbury, MA 02332 i