Satsop: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
* [[WNP-1]], [[WNP-4]] - [[Washington Nuclear Project]] (canceled) | |||
* [[WNP-3]] - [[Columbia]] | |||
* [[WNP-2]], [[WNP-5]] - [[Satsop]] (canceled) | |||
{{Site | {{Site | ||
|name=Satsop | |name=Satsop | ||
Latest revision as of 08:20, 28 January 2021
- WNP-1, WNP-4 - Washington Nuclear Project (canceled)
- WNP-3 - Columbia
- WNP-2, WNP-5 - Satsop (canceled)
| Plant | |
|---|---|
| Company | |
| Where | Elma, Washington |
| Regulatory | |
| Region | NRC Region 4 |
| ISFSI docket | |
| wikipedia link | |
| Docket | 05000508-Canceled |
|---|---|
| Status | |
| Docket | 05000509-Canceled |
|---|---|
| Status | |