05000321/FIN-2012005-02: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 9: Line 9:
| significance = Severity level IV
| significance = Severity level IV
| cornerstone = Barrier Integrity
| cornerstone = Barrier Integrity
| violation of = None
| violation of =  
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71153
| Inspection procedure = IP 71153

Latest revision as of 19:46, 20 February 2018

02
Site: Hatch Southern Nuclear icon.png
Report IR 05000321/2012005 Section 4OA3
Date counted Dec 31, 2012 (2012Q4)
Type: TEV: Severity level IV
cornerstone Barrier Integrity
Identified by: NRC identified
Inspection Procedure: IP 71153
Inspectors (proximate) D Berkshire
F Ehrhardt
W Loo
J Laughlin
M Miller
M Speck
B Caballero
S Sandal
E Morris
D Hardage
M Schwieg
INPO aspect
'