05000528/FIN-2012003-07: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 12: | Line 12: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71152 | | Inspection procedure = IP 71152 | ||
| Inspector = N Greene, D You, T Skaggs | | Inspector = N Greene, D You, T Skaggs-Ryan, L Ricketson, R Lantz, M Brown, M Davis, B Parks, M Baquera, I Anchondo, D Reinert | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = | ||
| description = The inspectors identified a Severity Level IV violation of 10 CFR 50.9, Completeness and Accuracy of Information, for the failure of the licensee to provide complete and accurate information in all material respects in response to Generic Letter 88-20, Supplement 4. Specifically, the licensee asserted that roofs are equipped with roof drains and scuppers as backup. As a result, the licensee concluded roof ponding considerations were not applicable to the Palo Verde Nuclear Generating Station site. Inspectors determined that there are no roof drains installed. The licensee initiated corrective actions to provide an accurate depiction of the roof drainage capabilities to the NRC. This finding has been entered into the licensees corrective action program as PVAR 3952605. The failure of the licensee to provide complete and accurate information for safety related building roof drainage was a performance deficiency. The Significance Determination Process is not suited to assess the significance of the performance deficiency because it affected the ability of the NRC to perform its regulatory oversight function and as such, it was assessed using traditional enforcement. This issue was determined to be a Severity Level IV violation in accordance with NRC Enforcement Policy examples provided in Section 6.9. No crosscutting aspect was assigned because the performance deficiency was assessed using traditional enforcement | | description = The inspectors identified a Severity Level IV violation of 10 CFR 50.9, Completeness and Accuracy of Information, for the failure of the licensee to provide complete and accurate information in all material respects in response to Generic Letter 88-20, Supplement 4. Specifically, the licensee asserted that roofs are equipped with roof drains and scuppers as backup. As a result, the licensee concluded roof ponding considerations were not applicable to the Palo Verde Nuclear Generating Station site. Inspectors determined that there are no roof drains installed. The licensee initiated corrective actions to provide an accurate depiction of the roof drainage capabilities to the NRC. This finding has been entered into the licensees corrective action program as PVAR 3952605. The failure of the licensee to provide complete and accurate information for safety related building roof drainage was a performance deficiency. The Significance Determination Process is not suited to assess the significance of the performance deficiency because it affected the ability of the NRC to perform its regulatory oversight function and as such, it was assessed using traditional enforcement. This issue was determined to be a Severity Level IV violation in accordance with NRC Enforcement Policy examples provided in Section 6.9. No crosscutting aspect was assigned because the performance deficiency was assessed using traditional enforcement | ||
}} | }} | ||
Latest revision as of 19:45, 20 February 2018
| Site: | Palo Verde |
|---|---|
| Report | IR 05000528/2012003 Section 4OA2 |
| Date counted | Jun 30, 2012 (2012Q2) |
| Type: | TEV: Severity level IV |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | N Greene D You T Skaggs-Ryan L Ricketson R Lantz M Brown M Davis B Parks M Baquera I Anchondo D Reinert |
| INPO aspect | |
| ' | |