05000327/FIN-2012003-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Evaluate Fire Drill | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 | ||
| inspection report = IR 05000327/2012003 | | inspection report = IR 05000327/2012003 | ||
Latest revision as of 19:45, 20 February 2018
| Site: | Sequoyah |
|---|---|
| Report | IR 05000327/2012003 Section 1R05 |
| Date counted | Jun 30, 2012 (2012Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.05 |
| Inspectors (proximate) | S Shaeffer C Young R Carrion W Deschaine |
| CCA | P.6, Self-Assessment |
| INPO aspect | CL.2 |
| ' | |