ML20066C081: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:*
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 (2151841 4000 October 29, 1982 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:    Document Control Desk
 
==SUBJECT:==
Peach Bottom Atomic Power Station, September, 1982, Monthly Operating Report Data Correction Gentlemen:
Attached are twelve corrected copies of the page " Unit Shutdowns and Power Reductions" of the monthly operating report-for Peach Bottom Unit 2 for the month of September, 1982 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
The reason (2) column for No. 9 shutdown has been connected from D        " Regulatory Restriction" to G          " Operational Error". We regret any inconvenience this error may have caused.
yery trul  yours, M.      ooney S,  rintendent G  eration Division - Nuclear Attachment l
cc:    Mr. R. C. Haynes                              A. R. Blough Administrator                                  Site Inspector Region I                                      P.O. Box 399 US Nuclear Regulatory Commission              Delta, PA 17314-0399 631 Park Avenue King of Prussia, PA 19406
                                                                    }b'
                              ~
( 8211090338 8121029'            ,
l  PDR ADOCK 05 9 __.._ ._ ,.-_ 000277 PDR    _. ,,'
l                                                                                            .}}

Revision as of 05:09, 17 January 2021

Forwards Corrected Monthly Operating Repts for Sept 1982
ML20066C081
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/29/1982
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20066C083 List:
References
NUDOCS 8211090338
Download: ML20066C081 (1)


Text

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 (2151841 4000 October 29, 1982 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station, September, 1982, Monthly Operating Report Data Correction Gentlemen:

Attached are twelve corrected copies of the page " Unit Shutdowns and Power Reductions" of the monthly operating report-for Peach Bottom Unit 2 for the month of September, 1982 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.

The reason (2) column for No. 9 shutdown has been connected from D " Regulatory Restriction" to G " Operational Error". We regret any inconvenience this error may have caused.

yery trul yours, M. ooney S, rintendent G eration Division - Nuclear Attachment l

cc: Mr. R. C. Haynes A. R. Blough Administrator Site Inspector Region I P.O. Box 399 US Nuclear Regulatory Commission Delta, PA 17314-0399 631 Park Avenue King of Prussia, PA 19406

}b'

~

( 8211090338 8121029' ,

l PDR ADOCK 05 9 __.._ ._ ,.-_ 000277 PDR _. ,,'

l .