ML20135F470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000269/1985024]]
| number = ML20135F470
| issue date = 08/30/1985
| title = Forwards Insp Repts 50-269/85-24,50-270/85-24 & 50-287/85-24 on 850812-16.No Violations or Deviations Noted
| author name = Brownlee V
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Tucker H
| addressee affiliation = DUKE POWER CO.
| docket = 05000269, 05000270, 05000287
| license number =
| contact person =
| document report number = NUDOCS 8509170281
| package number = ML20135F475
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000270/1985024]]
 
=Text=
{{#Wiki_filter:F
  .
        -
                                                                                      Gl&d
            -
      ,
                                              AljG 3 01985
    fukePowerCompany
      ATTN: Mr. H. B. Tucker, Vice President
              Nuclear Production Department
      422 South Church Street
      Charlotte, NC 28242
      Gentlemen:
      SUBJECT:    REPORT NOS. 50-269/85-24, 50-270/85-24, AND 50-287/85-24
      On August 12-16, 1985, NRC inspected activities authorized by NRC Operating
      License Nos. DPR-38, DPR-47, and DPR-55 for your Oconee facility.        At the
      conclusion of the inspection, the findings were discussed with those members of
      your staff identified in the enclosed inspection report.
      Areas examined during the inspection are identified in the report. Within these
      areas, the inspection consisted of selective examinations of procedures and
      representative records, interviews with personnel, and observation of activities
      in progress.
      Within the scope of the inspection, no violations or deviations were identified.
      In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
      Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
      will be placed in the NRC's Public Document Room.
      Should you have any questions concerning this letter, please contact us.
                                                Sincerely,
                                                Virgil L. Brownlee, Chief
                                                Reactor Projects Branch 2
                                                Division of Reactor Projects
      Enclosure:                                                                              ,
      Inspection Report Nos. 50-269/85-24,
          50-270/85-24, and 50-287/85-24
        c w/ encl:
      M. S. Tuckman, Station Manager
      bcc w/ encl:    (See page 2)
              8509170281 850830
              PDR  ADOCK 05000269
              O                PDR
                                                                                  t
                                                                                      ZE O lo
 
F    ,
            -
    ,
    Duke Power Company                      2
        c w/ enc 1:
      . B. Matthews, EPLB, IE HQS
  v3. Heard, FEMA Region IV
    EP Section File
  diRC Resident Inspector
  4. Nicolaras, NRR
    Document Control Desk
    State of South Carolina
,
    R                            RI    .
                                              RII/    7 RII
        reh:jw        Cline-    DMCollins  C urger  HCDance
        4/85        ,8@85        8/3o/85    8/3/85    8/985
<
}}

Latest revision as of 17:32, 25 September 2020