ML20070H602: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20070H602 | | number = ML20070H602 | ||
| issue date = 02/28/1991 | | issue date = 02/28/1991 | ||
| title = Monthly Operating Repts for Feb 1991 for Beaver Valley Units 1 & 2 | | title = Monthly Operating Repts for Feb 1991 for Beaver Valley Units 1 & 2 | ||
| author name = Sieber J, Winger M | | author name = Sieber J, Winger M | ||
| author affiliation = DUQUESNE LIGHT CO. | | author affiliation = DUQUESNE LIGHT CO. | ||
Revision as of 23:15, 23 May 2020
| ML20070H602 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/28/1991 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9103140259 | |
| Download: ML20070H602 (9) | |
Text
R
. . , .,=, -l l
"%s M teennone sm 393 5000
=~
snimnowi PA tson om March 8, 1991 Beaver Valley _ Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthlv Operatina Report U. S. Nuclear Regulatory Commission Document Control Desk Washirgton, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operatirs Report is submitted for Unit 1- and Unit _2 _for_- the month'of February, 1991.
Very truly yours,
. D.--Sieber ice President Nuclear Group MAW /Img Enclosures cc: NRC Regional Office King of Prussia, PA i
9103140259 910228 PDR R ADOCK 05000334 f Ih\
f
, NARRATIVE SLM%RY OF KND{LY OPEATING EXPERIENCE j UNI'I I FEBRUARY 1991 February 1 The unit remained shutdown to repair the main turbine's D.C.
Bearing Oil Pump. At 2009 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.644245e-4 months <br /> the unit was synchronized and the unit's output was escalated to a ncaninal value of 100%.
February 2 The unit operated at a ncaninal value of 100% output.
Fabruary 3 At 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> the unit's output was reduced-to approximately 80% to load follow. At 0847 hours0.0098 days <br />0.235 hours <br />0.0014 weeks <br />3.222835e-4 months <br /> the unit's output was escalated to 100%. At 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br /> the Unit's output was reduced to 80% to load follow.
FeW' 4 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the unit's output was escalated to 100%.
February 5 The unit operated at a ncxninal value of 100% output.
through February 28
- i AVmAGE IRILY LNIT METR LEVEL Docket 14o. 50-334 Unit BVPS LMit 1 Date March 7. 1991 Capleted by M. A. Wirner Telephone (1121393-7621 P.Dtml FEBRUARY 1991 IAY AVERAGE !*ILY TWIR ILVfL DAY AVmAGE (WILY K MER LEVIL
(!He-Net) (!We-Het) 4 1 _ _ _ _
0 17 821 2 690 18 ,,,- 813 _
l 3 775 19 808 -
-i 4 771 20 81" 5 825 21 f21 6 __- 821 22 r14 .,
7 813 23 814 8 817 24 821-( 9 821 2,r , 813 ,
i 10 825 26 817 11 817 27 817 ,_,_
12 821 28 813 13 813 ,
14 817 15 023
-16 810 __,
INS'IRUCI' IONS -
On this format, list the average daily unit power level-in IWe-Net for each day in the reporting month, cmpute to the nearest whole megawatt.:
l u
, . '1
Unti SmuTDoves AmD PovER REDUCTIONS Docket he. 50-334 -
Unit mere RVPS Unit #1 Date perch T. 1991 Completed 3y R.A. Winner REPORT N0sTE FE9#UARY 199* Telephone (6123 393-7621 Methed of ticeauce Cause & Cone t ive Duration Shutting Ew nt System Component Action to Co.
Date Typel (Nours) Reason 2 Dawn Reactor 3 Report 8 Code 4 Code 5 Prevent Recurrence 910201 20.1 A 4 m/A NA PUMPXE Unit remained shutdou* to repair 3 F main Turbine's 9. 5. Lube ett Pump.
4 '910203 S 0 N 5 m/m ZZ ZZZZZZ Out pt:t reduced free 100% to 801 to toed foltou.
T 910203 5 0 5 m/A ZZ ZZZZZZ output reduced from 1001 to 801
- 5 N to lead foltou.
t 1
2 3 4 7 .
'F-Forced Reason: .
Method: Enhibit G-instructions for S-Scheduled. A-Equipment Felture (Exptein) 1-menuel Preparatier of Date Entry Sheets 8-Meintenance or' Test 2-Manost Scree for Licensee Event Report (LER) File C-Refueling .
3-Automatic seres (suREG0161).
B-Regulatory Restriction 4-Cont *d. free Prewfous Month E-Operator Training & License Exam 5-Reduction 5 F-Administrattwe 9-Other Exhibit 3-Seme source.
s-operationet Error (Emptain)
N-Other (Emplain).-
}
l i
OPERATING DATA REPORT DOCKET NO. 50-334 REPORT DATE: 03/07/91 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393 7621 OPERATING STAIMS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTINC PERIOD: FEBRUARY 1991
- 3. LICENSED THEP. MAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Cross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX DEPENDABLE CAPACITY (Gross MWe): 860 g
- 7. MAX. DEPENDABLE CAPACITY (Not MWe): 81n B. IP CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
w
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None i 10. REASONS FOR RESTRICTIONS, IF ANY: _ _ _ N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 672.0 1416.0 130008.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 672.0 1075.5 81369.9
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4462.8
- 14. HOURS GENERATOR WAS ON LINE: 651.9 1041.8 79586.8
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1698024.0 2660994.0 188949441.5
- 17. GROSS ELECT. ENERGY GEN. (MWH): 553420.0 861390.0 60694119.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 524150.0 813910.0 56678110.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 97.0 73.6 63.4
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.0 73 6 63.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 93,4 68.8 55.0
- 23. UNIT FORCED OUTAGE RATE: ' PERCENT) 3,0 26.4 16.5
- 24. SHUTDOWNS SCHEDULED CVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN F0]LIllE UNIT' S 8TH REFUELING OMI6GE ON APRIL 12.1991. THE UNIT IS SCHEDULED TO BE SHUTDOWN FOR 10 WEEKS.
- 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
!#RPATIVE SLIMJtY OT lotfIHLY OPIRi&I!)3 D3'IRIDJCE UGT II ITERUARY 1991 ,
I rebruary 1 The Unit operated at a rmtnni value of 100% eutput.
threnxjh February 28 ,
1 i
l
OPERATING DATA REPORT DOCKET NO.. 50 412 REPORT DATE: 03/07/91 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POW *R STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUAhY +i91
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Crost MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX DEPENDABLE CAPACITY (Cross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY ' Net MWe): 820
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (het MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: ,
N/A THIS MONTH Yi.AR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 672.0 1416.0 28791.0
- 12. No OF HRS. REACTOR WAS CRITICAL: 672.0 1416.0 23763.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 :
- 14. HOURS CENER/iTOR WAS ON LINE: 672.0 1416.0 23577.8
- 15. UNIT RESERVL 3HUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH): 1772383.0 3738488.0 56866104.4
- 17. GROSS ELECT. ENERGY GEN. (MVH): 573700.0 1209000.0 182458u0.0
- 18. NET ELECTRICAL ENERCY GEN. (MWH): 544633.0 1148384.0 17191708.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 81.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 81.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 96.9 97.0 71.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 00 STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY __ N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
l l
l 1
-_ _._ __ _ _ - . . . . . __-. .. . _ . _ _ ,_ _ . . . _ < _ _ . ...___m
_ _ _.m.. _ . . . . - .
4 l i
- 1 UNIT SMUYDOWNS AND POWER REDUCTIces Docket me. 50-412 Unit Name SWP5 Unit #2 i Date March T. 1991
- I Completed By M.A. Winger f REPORT MouTM FEsaumat 1991 Telephone .(412) 393-7621 .
- i
- h. Method of Licensee Cause & Corrective [
Duration Shutting Event System Component Action to f
.co. Date- Typet (nours) Reeson2 Down acactor3 seport # code' code 5 Prevent accurrence 1
l Cone f I !
f 5
4 ,
i t i~ [
t' 4 I
+
3 l
4 i
i r
I 4
. i 1 2 3 4 ?
F-Forced Reesoe: Method: Exhibit G-instructions for !
S-Scheduled A-Equipment Failure (Emplain) 1-menvat ' Preparation of Bate Entry Sheets 'i S-Meintenance or Test 2-menvat scree- for Licensee Event Report (LER) File' i
!' C-Refueling 0-megulatory' Restriction
_3-Automatic scram 4-Cont'd. from Previous Month (uueEG0161). [
t E-Operator Training & License Ex==
5-Redvetion 5 i
_ 'F-Administrative.: 9-Other Exhibit 1-Same Source. l
! G-operational Error (Emptain) [
N-Other (Emplain) {
i i
i ,
3
}
4 1 2
t i ~ - -
I
._.__ ~ , _ .. _ _ . _ _ . _ ._ _ . _ _ .. . .,..
e i
AVERAGE CAILY TWIT POWFR LEVEL l
l 1
DrAet No. 50-412 1 Unit BVPS Unit 2 .
j Date j$ar d 7. 1991 l j Ccmpleted W M. A. Winaer ,
! Telephone (412) 393-7621 1
1 '
!Dml FI21RUARY_199.1 ;
DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL
(!We-Net) (l@e-Net) 1 807 , , , , 17 811 i 2 807 18 811 i :
i
< 3 811 19 807 1
4 811 20 811 t
5 811 21 811 l 6 811' 22 807 ,
7 815 23 811 !
t, 1 8 811 24 802 '
9 815 25 811 ,
10 815 26 811 11 811 27 811 I
12 811 28 807 ?
i 13- 807 1 14 811 ,
i 15 815 t 16 815 INSIRUCTICNS l t On this format, list the average daily unit power level in PWe-Net for each day :
in the reporting month. - Ctmpute to the nearest whole megawatt. -;
i i
l l
I y.+mm,,-.-.r.z- --,,v e ,-- . , , . . , .,,-y__..,y,,..,_..m..,,_,m.,_,.,.. r...r.yr.,_m.g ., __-c, ..,-..#-..,.m.4,....c.,.-r-ww----* *w.---- - -.---E+-=-w?-+.--/