Regulatory Guide 1.129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13350A268
| number = ML003740104
| issue date = 04/30/1977
| issue date = 02/28/1978
| title = Maintenance Testing, and Replacement of Large Lead Storage Batteries for Nuclear Power Plants
| title = Maintenance, Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants
| author name =  
| author name =  
| author affiliation = NRC/OSD
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-1.129
| document report number = RG-1.129, Revision 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 2
| page count = 2
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATORY. COMMISSION                                                                                                     April 1977
{{#Wiki_filter:Revision 1 February 1978 U.S. NUCLEAR REGULATORY COMMISSION
0                                      REGULATORY GUIDE
                                      REGULATORY GUIDE
                                       OFFICE OF STANDARDS DEVELOPMENT
                                       OFFICE OF STANDARDS DEVELOPMENT
                                                                        REGULATORY GUIDE 1.129 MAINTENANCE, TESTING, AND REPLACEMENT OF LARGE LEAD
                                                                      REGULATORY GUIDE 1.129 MAINTENANCE, TESTING, AND REPLACEMENT OF LARGE LEAD
                                            STORAGE BATTERIES FOR NUCLEAR POWER PLANTS
                                        STORAGE BATTERIES FOR NUCLEAR POWER PLANTS


==A. INTRODUCTION==
==A. INTRODUCTION==
27, 1975. It was subsequently approved and designated N41.15-1976 by the American National Criterion 18, "Inspection and Testing of Electric                                      Standards Institute on January 8, 1976.
by the Working Group on Batteries, Station Design Criterion 18, "Inspection and Testing of Electric                                        Subcommittee, of the Power Generation Committee Power Systems." of Appendix A, "General Design                                              and was approved by the Institute -of Electrical and Criteria for Nuclear Power Plants." to 10 CFR Part                                          Electronics Engineers Standards Board on February
    50, 'Licensing of Production and Utilization                                                27, 1975. It was subsequently approved and desig Facilities.' " requires that electric power systems im                                      nated N41.15-1976 by the American National Stand portant to safety be designed with a capability to test                                      ards Institute on January 8, 1976.


Power Systems," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part                                                The. provisions of the standiard include
periodically the operability and functional perform ance of the components of the systems. such as on                                              The provisions of the standard include mainte site power sources. Criterion X1, "Test Control," of                                         nance, test schedules, testing procedures, and re Appendix B, "'Quality Assurance Criteria for Nuclear                                         placement criteria for large lead storage batteries.
    50, "Licensing of Production and Utilization                                                maintenance, test schedules, testin                                      r$.,'.edures, and Facilities," requires that electric power systems im-                                         replacement criteria for large lead storagc batteries.


po~rtant to safety be designed with a capability to test                                    The standard does not inclu i,,.survei0lajnce and periodically the operability and functional perfor-                                          testing of the d.c. system. evaethb gh thehbattery is mance of the components of the systems, such as on-                                          part of that system. This stadaitd.ontums require.
Power Plants and Fuel Reprocessing Plants,"                                                  The standard does not include surveillance and test
                                                                                      10o0
  CFR Part 50 requires that a test program be estab                                            ing of the d.c. system, even though the battery is part lished tc ensure that all testing required to demon                                          of that system. This standard contains requirements strate that structures, systems, and components will                                        indicated by the verb "shall" and recommendations perform satisfactorily in service is identified and per                                      indicated by the verb "should." The recommenda formed in accordance with Aritten test procedures                                            tions as well as the requirements of the standard were that incorporate the requirements and acceptance lim                                        evaluated with respect to importance to safety. All its contained in applicable design documents. Para                                          recommendations are considered to be of sufficient graph 50.34(b)(6) of 10 CFR Part 50 requires that the                                        importance to safety to be endorsed along with the final safety analysis report include, among other                                            requirements given in the standard.


site power sources. Criterion XI, "test Control," of                                         ments indicated by th' verb "hall"'and recommen- Appendix B, "Quality Assurance Criteria for Nuclear                                          dations indicated,,by'tki Verb "'should."
things, plans for conduct of normal operations. in cluding maintenance, surveillance, and periodic tpst                                                       
    Power Plants and Fuel Reprocessing Plants," to 10
    CFR Part 50 requires that a test program be es-                                                                  .. REB,46LATORY POSITION
    tablished to ensure that all testing required to demonstrate that structures, systems, and compo-                                                  Coiforrrancewth the requirements and recoi- nents will perform satisfactorily in service is iden-                                        mende'ibns t'fithc maintenance. testing. and replace- tified and performed in accordance with written test .rnt&YOrge                                                            ead storage batteries for nuclear power procedures that incorporate the requirements and ac-                                        p:.l*anitsý,ýi'hjit are specified by IEEE .Std 450.1975, ceptance limits contained in applicable design doju-'                                          IEEE" Recommended Practice for Maintenance.


ments. Paragraph 50.34(b)(6) of 10 CFR Part 50 re-                                          Te*iing and Replacement of Large Lead Storage Bat- quires that the final safety analysis report 1inct*de                                    :,*¢teries for Generating Stations and Substations,'
==C. REGULATORY POSITION==
    among other things, plans for conductCof norrmiI1. ': provides an adequate basis for complying with the re- operations, including maintenance, sur;illance,,-and                                          quirements of the Commission's regulations with periodic testing of structures, systems, a~no'do*mpo-                                        respect to the maintenance, testing. and replacement nents. This regulatory guide describes a mreti'ld ac-                                        of large lead storage batteries, subject to the follow- ceptable to the NRC staf. for performing the                                                 ing:
ing of structures, systems, and components. This regulatory guide describes a method acceptable to the                                           Conformance with the requirements and recom NRC staff for performing the maintenance, testing,                                           mendations for the maintenance, testing. and re and repiacement of large lead storage batteries for all                                     placement of large lead storage batteries for nuclear types o: nuclear power plants. The Adisory Commit                                           power plants that are specified by IEEE Std 450
    maintenance, testing, auiid replacement of large lead storage batteries for all ty".e6f.iiclet'r power plants.                                          I. The battery service test discussed in Subsection
  tee on Reactor Safeguards has been consulted con                                            1975. "IEEE Recommended Practice for Mainte cerning this guide and has concurred in the regulatory                                      nance, Testing and Replacement of Large Lead Stor position.                                                                                    age Batteries for Generating Stations and Substa tions,'' provides an adequate basis for complying
                                - -4.3,                                                                  "Service," and described in Subsection 5.6, "Ser-
                                ý B. DISCU SION                                                  vice Test Description," should be performed with the
                              .'. '          .intervals                                                            between tests in accordance with Regulatory IEEE**td 450:'-j 7,"IEEE Recommended Prac-                                              Guide 1.32, "Criteria for Safety-Related Electric tice for NWitenance, Testing and Replacement of                                               Power Systems for Nuclear Power Plants." In addi- Large Lead"Siprage Batteries for Generating Stations                                         tion, if the system design is changed so that the and Substati~ns," dated May 29, 1975, was prepared                                            previous service test is no longer a valid test of the by the Working Group on Batteries, Station Design                                            capability oj the battery to meet the changed design Subcommittee, of the Power Generation Committee                                                'Copies ma)y be obtained from the Institute of IElectrical and and was approved by the Institute of Electrical and                                            Electronics Engineers, United Engineering Center. 345 E.'ta 47th Electronics Engineers Standards Board on February                                              Street, New York. New York 10017.


USNRC REGULATORY GUIDES                                               Comment%          osuld be sent to Ih" S'c'*ey o( I tv! C,,,vnini,,,n.U. N,,O*m Flt,         n ,.
==B. DISCUSSION==
    Regulatory Guides ate issued to descrtia anti make avaiable to the public methods          latury Comr.mion,           i$.ishinqiuon. D.C.    ?0555h. Atrll,,,m,    Ot~ckethJ    mntl -V',.'
with the requirements of the Commission's regula IEEE Std 450-1975. "IEEE Recommended Prac                                               tions with respect to the maintenance, testing. and tice for Maintenance. Testing and Replacement of                                              replacement of large lead storage batteries, subject to Large Lead Storage Batteries for Generating Stations                                          the following:
    acceptable to the NRC sltaf of imptlemnenting specific parts of the Conmism-on's            Stanch.
and Substations," dated May 29, 1975, was prepared
                                                                                              'Copies niMy be obtained from the Institute of Electrical and
*Lines indicate substantive changes from previous issue.                                     Electronics Engineers, United Engineering Center, 345 East
                                                                                              47th Street, New York, New York 10017.


tegulations, to delineate techniquei used by the staff in evaluating specific problems      The guides a      imruet in    he followviilg ten Itytt.t dtiviirmt:
USNRC REGULATORY GUIDES                                              Comments should be sent to the Secretary of the Comnission Regu:atory Guides are issued to describe and rake avwlabic to                                                                                                 US Nuclea, Ra,,
    Or tostulateM accidents. of to Provde guidance to applicants. Regulatory Guides ate sot substltutes foe 'egulations. and compnhence with them is not required.              I. Power Reaclnts                                      G. Prrntfuci Metholds and solutions diflerent from those set out in the guides will be accet-t          2. Research and Teft Reacturs                            7. Tra*itsttatmr*o able it they ptovide a basis for the finding rtequisite to the Itsuance at continuance      3. Fuel%aond M.aterials Facifites                      a. OccspatonalI lt,JAl of a permit or license by the Commission.                                                  4. Envitonmenlal anti String                            9. Anltitust neview'y
                                                                      the public method    latory Commission Washington. 0 C         20555. Attention      Dockelng and Ser,*
  *    i  , n                b  ensd.a uoOwle.fineanidt                    cmset              5,es M      slo,    Plane Prtcin                    1.Gna t. Gental aft encouraged at of      5 Materials and Plant Protection Comments and suggestions for improvements In these gudes time, and gu.ides, will be revisedt, as aopDOtwilite. to accommodatle commren-ts and       Reqetslel for sing*le* copies t)l issued ,quid"P Iwh~rh may tie"                  r oelO(t flatI
  acceotable to the NRC staff of implernnting speci.
                                                                                                                                                                                          O plic'-.
    to feallect new Info~rmaclot tie experience.    Havwe.vef. commentt on this guideoif        menn on' an automatic distribution hls for $inqllr tall estt III(ltlftti q~uides in specific:
      eecelved within about tw) tvmonths ,after,it issuance, will be' ereiatcular  useful In    divisionts should be malle in wtifinrl !a the US. Nu(dewfl nPeul~twa*y Connm,*&uu,,.
      Mlal I~ng the need lot aln early revision.                                                Washington, D.C. 2*0555. Attentionl: Director, Divi%*kon of Documnent Contfeti.


requirements of the system, the user should conduct            Except in those cases in which the applicant the service test for the new system design.                 proposes an acceptable alternative method for com- plying with specified portions of the Commission's
regiiations *o delineate lechnilques usd bv the staff    Darts of the Commissio's        Branch in eva:ualing sp&#xfd;eific protleecs  The guidesare issued in the followsirng ten broaJ divisions or postulated accidents, or to provide guidance tc app..can-n Regulatory Guides are nOt subsitutes for regulatons. and compliance w-it them is not rteuired        1. Power Reactors Methods and solutions different from th.Sf se! O< i,                                                                                    6 Products Ihi guides will be accept    2 Research ard Test Reactors ah if they provide a basts to. the findings reourste to tic                                                                            7. Transportaior issiurici or continuance  3 Fuets and Materials Facilities or a peri    or license by the Cornmi-t-,                                                                                                8. Occupationa, Hteatr,
    2. Section 8. 'Standards References." of IEEE Std      regulations, the method described herein will be used
                                                                                          4. Enironmdental andSitrng                    9. Antitrust Revit.*
450-1975 lists additional standards. The specific ap-        in the evaluation of submittals in connection with plicability or acceptability of these referenced stan-    construction permit applications docketed after dards has been or will be covered separately in other        December I. 1977. unless this guide is revised as a regulatory guides, where appropriate.                     result of suggestions from the public or additional staff review.
                                                                                          5 Materials and Plant Protection            10 General Comments and suggestions for improve*ments in these guides are encouraged at at!    Requests for single copies of issued guides twhief may times ano gLi es will be revised. as appropriate, to accommodate                                                                                    be reproducedI or lor la comment,. ano  Reenston an automaltc distiebuon list for single copies to refi
 
====e.  ntc====
              - . niormation or experience    This guide wal -re.wseoss                                                                              Of futureOuidesor Iiaert rea       divisions sould be made in writing To ubsirlhv    comn-er-t  received from the publ                                                                                        US Nucpar Reoqlarou i Coi mss.,
                                                                                                                                        *he an    a 1,'ona staff reuiea.      Washington CC      20555, Attention      Director. Divisison r  Docuriuni Cuirro,
 
I. The battcry ser\ ice test discussed in Subsection standards has been or will be covered separately in
4.3, "Service.I and described in Subsection 5.6,        other regulatory guides, where appropriate.
 
"Service Test Description," should be performed in                                                              J*
addition to the battery performance discharge tes
 
====t.     ====


==D. IMPLEMENTATION==
==D. IMPLEMENTATION==
If an applicant wishes to use this regulator)y guide in developing submittals for applications docketed on The purpose of this section is to provide informa-      or before December I. 1977, the pertinent portions of tion to applicants regarding the NRC staffs plans for       the application will he evaluated on the basis of this using this regulatory guide.                               guide.
The battery service test should be performed during        The purpose of this section is to provide informa refueling operations or at some other outage, with      tion to applicants and licensees regarding the NRC.
 
"intervals between tests not to exceed 18 months. In    staff's plans for using this regulatory guide.
 
addition, if the system design is changed so that the This guide reflects current NRC staff practice.


-o WC  Z
previous service test is no longer a valid test of the Therefore, except in those cases in which the appli capability of the battery to meet the changed design cant or licensee proposes an acceptable alternative requirements of the system, the user should conduct method for complying with specified portions of the the service test for the new system design.
    2          a
    0J
        ILn      o
    00
              4.


w j 0
Commission's regulations, the method described herein is being and will continue to be used in the evaluation of submittals in connection with construc
     LU
  2. Section 8. "Standards References," of IEEE        tion permit applications until this guide is revised as Std 450-1975 lists additional standards. The specific  a result of suggestions from the public or additional applicability or acceptability of these referenced     staff review.}}
            01
                                                      1.129-2}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 10:18, 28 March 2020

Maintenance, Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants
ML003740104
Person / Time
Issue date: 02/28/1978
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.129, Revision 1
Download: ML003740104 (2)


Revision 1 February 1978 U.S. NUCLEAR REGULATORY COMMISSION

REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 1.129 MAINTENANCE, TESTING, AND REPLACEMENT OF LARGE LEAD

STORAGE BATTERIES FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

by the Working Group on Batteries, Station Design Criterion 18, "Inspection and Testing of Electric Subcommittee, of the Power Generation Committee Power Systems." of Appendix A, "General Design and was approved by the Institute -of Electrical and Criteria for Nuclear Power Plants." to 10 CFR Part Electronics Engineers Standards Board on February

50, 'Licensing of Production and Utilization 27, 1975. It was subsequently approved and desig Facilities.' " requires that electric power systems im nated N41.15-1976 by the American National Stand portant to safety be designed with a capability to test ards Institute on January 8, 1976.

periodically the operability and functional perform ance of the components of the systems. such as on The provisions of the standard include mainte site power sources. Criterion X1, "Test Control," of nance, test schedules, testing procedures, and re Appendix B, "'Quality Assurance Criteria for Nuclear placement criteria for large lead storage batteries.

Power Plants and Fuel Reprocessing Plants," The standard does not include surveillance and test

10o0

CFR Part 50 requires that a test program be estab ing of the d.c. system, even though the battery is part lished tc ensure that all testing required to demon of that system. This standard contains requirements strate that structures, systems, and components will indicated by the verb "shall" and recommendations perform satisfactorily in service is identified and per indicated by the verb "should." The recommenda formed in accordance with Aritten test procedures tions as well as the requirements of the standard were that incorporate the requirements and acceptance lim evaluated with respect to importance to safety. All its contained in applicable design documents. Para recommendations are considered to be of sufficient graph 50.34(b)(6) of 10 CFR Part 50 requires that the importance to safety to be endorsed along with the final safety analysis report include, among other requirements given in the standard.

things, plans for conduct of normal operations. in cluding maintenance, surveillance, and periodic tpst

C. REGULATORY POSITION

ing of structures, systems, and components. This regulatory guide describes a method acceptable to the Conformance with the requirements and recom NRC staff for performing the maintenance, testing, mendations for the maintenance, testing. and re and repiacement of large lead storage batteries for all placement of large lead storage batteries for nuclear types o: nuclear power plants. The Adisory Commit power plants that are specified by IEEE Std 450

tee on Reactor Safeguards has been consulted con 1975. "IEEE Recommended Practice for Mainte cerning this guide and has concurred in the regulatory nance, Testing and Replacement of Large Lead Stor position. age Batteries for Generating Stations and Substa tions, provides an adequate basis for complying

B. DISCUSSION

with the requirements of the Commission's regula IEEE Std 450-1975. "IEEE Recommended Prac tions with respect to the maintenance, testing. and tice for Maintenance. Testing and Replacement of replacement of large lead storage batteries, subject to Large Lead Storage Batteries for Generating Stations the following:

and Substations," dated May 29, 1975, was prepared

'Copies niMy be obtained from the Institute of Electrical and

  • Lines indicate substantive changes from previous issue. Electronics Engineers, United Engineering Center, 345 East

47th Street, New York, New York 10017.

USNRC REGULATORY GUIDES Comments should be sent to the Secretary of the Comnission Regu:atory Guides are issued to describe and rake avwlabic to US Nuclea, Ra,,

the public method latory Commission Washington. 0 C 20555. Attention Dockelng and Ser,*

acceotable to the NRC staff of implernnting speci.

regiiations *o delineate lechnilques usd bv the staff Darts of the Commissio's Branch in eva:ualing spýeific protleecs The guidesare issued in the followsirng ten broaJ divisions or postulated accidents, or to provide guidance tc app..can-n Regulatory Guides are nOt subsitutes for regulatons. and compliance w-it them is not rteuired 1. Power Reactors Methods and solutions different from th.Sf se! O< i, 6 Products Ihi guides will be accept 2 Research ard Test Reactors ah if they provide a basts to. the findings reourste to tic 7. Transportaior issiurici or continuance 3 Fuets and Materials Facilities or a peri or license by the Cornmi-t-, 8. Occupationa, Hteatr,

4. Enironmdental andSitrng 9. Antitrust Revit.*

5 Materials and Plant Protection 10 General Comments and suggestions for improve*ments in these guides are encouraged at at! Requests for single copies of issued guides twhief may times ano gLi es will be revised. as appropriate, to accommodate be reproducedI or lor la comment,. ano Reenston an automaltc distiebuon list for single copies to refi

e. ntc

- . niormation or experience This guide wal -re.wseoss Of futureOuidesor Iiaert rea divisions sould be made in writing To ubsirlhv comn-er-t received from the publ US Nucpar Reoqlarou i Coi mss.,

  • he an a 1,'ona staff reuiea. Washington CC 20555, Attention Director. Divisison r Docuriuni Cuirro,

I. The battcry ser\ ice test discussed in Subsection standards has been or will be covered separately in

4.3, "Service.I and described in Subsection 5.6, other regulatory guides, where appropriate.

"Service Test Description," should be performed in J*

addition to the battery performance discharge tes

t.

D. IMPLEMENTATION

The battery service test should be performed during The purpose of this section is to provide informa refueling operations or at some other outage, with tion to applicants and licensees regarding the NRC.

"intervals between tests not to exceed 18 months. In staff's plans for using this regulatory guide.

addition, if the system design is changed so that the This guide reflects current NRC staff practice.

previous service test is no longer a valid test of the Therefore, except in those cases in which the appli capability of the battery to meet the changed design cant or licensee proposes an acceptable alternative requirements of the system, the user should conduct method for complying with specified portions of the the service test for the new system design.

Commission's regulations, the method described herein is being and will continue to be used in the evaluation of submittals in connection with construc

2. Section 8. "Standards References," of IEEE tion permit applications until this guide is revised as Std 450-1975 lists additional standards. The specific a result of suggestions from the public or additional applicability or acceptability of these referenced staff review.