IR 05000341/2002004: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{IR-Nav| site = 05000341 | year = 2002 | report number = 004 | {{Adams | ||
| number = ML021440502 | |||
| issue date = 05/23/2002 | |||
| title = IR 05000341/2002-004, on 05/06-10/2002, Detroit Edison Company, Fermi 2 Nuclear Power Station. Permanent Plant Modification and Changes, Tests, and Experiments | |||
| author name = Jacobson J | |||
| author affiliation = NRC/RGN-III/DRS/MEB | |||
| addressee name = O'Connor W | |||
| addressee affiliation = Detroit Edison | |||
| docket = 05000341 | |||
| license number = NPF-043 | |||
| contact person = | |||
| document report number = IR-02-004 | |||
| document type = Inspection Report | |||
| page count = 18 | |||
}} | |||
{{IR-Nav| site = 05000341 | year = 2002 | report number = 004 }} | |||
=Text= | |||
{{#Wiki_filter:==SUBJECT:== | |||
FERMI 2 NUCLEAR POWER STATION - | |||
NRC INSPECTION REPORT 50-341/02-04(DRS) | |||
==Dear Mr. OConnor:== | |||
On May 10, 2002, the NRC completed an inspection at your Fermi 2 Nuclear Power Station. | |||
The enclosed report documents inspection findings which were discussed on May 10, 2002, with you, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, the inspection focused on permanent plant modifications and changes, tests and experiments done in accordance with 10 CFR 50.59. | |||
Based on the results of this inspection, no findings of significance were identified In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
John M. Jacobson, Chief Mechanical Engineering Branch Division of Reactor Safety | |||
==SUBJECT:== | |||
FERMI 2 NUCLEAR POWER STATION NRC INSPECTION REPORT 50-341/02-04(DRS) | |||
Dear M | |||
}} | |||
Revision as of 16:21, 26 March 2020
| ML021440502 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/23/2002 |
| From: | Jeffrey Jacobson NRC/RGN-III/DRS/MEB |
| To: | O'Connor W Detroit Edison |
| References | |
| IR-02-004 | |
| Download: ML021440502 (18) | |
Text
SUBJECT:
FERMI 2 NUCLEAR POWER STATION -
NRC INSPECTION REPORT 50-341/02-04(DRS)
Dear Mr. OConnor:
On May 10, 2002, the NRC completed an inspection at your Fermi 2 Nuclear Power Station.
The enclosed report documents inspection findings which were discussed on May 10, 2002, with you, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Specifically, the inspection focused on permanent plant modifications and changes, tests and experiments done in accordance with 10 CFR 50.59.
Based on the results of this inspection, no findings of significance were identified In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,
/RA/
John M. Jacobson, Chief Mechanical Engineering Branch Division of Reactor Safety
SUBJECT:
FERMI 2 NUCLEAR POWER STATION NRC INSPECTION REPORT 50-341/02-04(DRS)
Dear M