IR 05000073/2014201: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML14171A622 | | number = ML14171A622 | ||
| issue date = 07/07/2014 | | issue date = 07/07/2014 | ||
| title = | | title = IR 05000073-14-201 on June 2-4, 2014 at the General Electric Vallecitos Nuclear Center - NRC Routine Announced Inspection Report No. 50-73/2014-201 | ||
| author name = Isaac P | | author name = Isaac P | ||
| author affiliation = NRC/NRR/DPR/PRTA | | author affiliation = NRC/NRR/DPR/PRTA | ||
Revision as of 10:13, 13 February 2018
| ML14171A622 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 07/07/2014 |
| From: | Isaac P Research and Test Reactors Licensing Branch |
| To: | Caine T General Electric Co |
| Font O E, DPR/PROB, 415-2490 | |
| References | |
| IR-14-201 | |
| Download: ML14171A622 (17) | |
Text
July 7, 2014
Mr. Thomas Caine Vallecitos Nuclear Center General Electric Company 6705 Vallecitos Road Sunol, CA 94586
SUBJECT: GENERAL ELECTRIC - NRC ROUTINE, ANNOUNCED INSPECTION REPORT NO. 50-73/2014-201
Dear Mr. Caine:
On June 2-4, 2014, the U.S. Nuclear Regulatory Commission (NRC, the Commission) conducted a routine, announced inspection at the General Electric Vallecitos Nuclear Center (VNC) and held a subsequent phone call on June 12, 2014 and a re-exit meeting on June 13, 2014 (Inspection Report No. 50-73/2014-201). The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection. This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress. Based on the results of this inspection, no safety concern or noncompliance with NRC requirements was identified. No response to this letter is required. In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, requests for withholding," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this inspection, please contact Ossy Font at 301-415-2490 or by electronic mail at Ossy.Font@nrc.gov.
Sincerely,/RA/ Patrick Isaac, Acting Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-73 License No. R-33
Enclosure:
NRC Inspection Report No. 50-73/2014-201 cc: See next page General Electric Docket No. 50-73 cc: Juan Ayala Radiation Safety Officer Vallecitos Nuclear Center General Electric Company 6705 Vallecitos Road Sunol, CA 94586 Mr. Dan Thomas Manager NTR Vallecitos Nuclear Center General Electric Company 6705 Vallecitos Road Sunol, CA 94586 Mr. Harold Neems General Electric Company Nuclear Energy Business Operations 175 Cutner Avenue Mail Code 123 San Jose, CA 95125 Commissioner California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 California Department of Health ATTN: Chief Radiologic Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611-8300