| issue date = 07/28/2015 | | issue date = 07/28/2015 | ||
| title = | | title = Ir 05000272/2015002; 05000311/2015002: April 1, 2015 Through June 30, 2015, Salem Nuclear Generating Station, Units 1 & 2 - Integrated Inspection Report | ||
| author name = Dentel G T | | author name = Dentel G T | ||
| author affiliation = NRC/RGN-I/DRP/PB3 | | author affiliation = NRC/RGN-I/DRP/PB3 | ||
Revision as of 01:41, 13 February 2018
| ML15209A694 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/28/2015 |
| From: | Dentel G T Reactor Projects Branch 3 |
| To: | Braun R C Public Service Enterprise Group |
| DENTEL, GT | |
| References | |
| IR 2015002 | |
| Download: ML15209A694 (54) | |
Text
T. Joyce July 28, 2015 Mr. Robert President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 INTEGRATED INSPECTION REPORT 05000272/2015002 AND 05000311/2015002
Dear Mr. Braun:
On June 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Salem Nuclear Generating Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 9, 2015, with Mr. John Perry, Salem Site Vice President, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. This report documents three NRC-identified findings and three self-revealing findings of very low safety significance (Green). All of these findings were determined to involve violations of NRC requirements. However, because of the very low safety significance, and because they are entered into your corrective action program, the NRC is treating these findings as non-cited violations, consistent with Section 2.3.2.a of the NRC Enforcement Policy. If you contest the non-cited violations in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Salem Nuclear Generating Station. In addition, if you disagree with the cross-cutting aspect assigned to any finding, or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC Resident Inspector at Salem Nuclear Generating Station. In accordance with Title 10 of the Code of Federal Regulations the Publicly Available Records component of Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Glenn T. Dentel, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-75
Enclosure:
Inspection Report 05000272/2015002 and 05000311/2015002
w/Attachment:
Supplementary Information cc w/encl: Distribution via ListServ