ML120260306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 96: Line 96:
I I
I I
2010 N/R
2010 N/R
                                             ~~/~~-***r-****2~/~*-.- r-~~~;        1**      014
                                             ~~/~~-***r-****2~/~*-.- r-~~~;        1**      014 2
                                                                                        ----_.
N/R
2 N/R
. Byron                    9/27      I      N/R                    01/16    01114*
. Byron                    9/27      I      N/R                    01/16    01114*
                                                                                        ..
0 1/27 Clinton                  11/1~            8/22                    N/R    8/19        N/R Dresden                  03/08            03/07                            3/04        N/R 3105 LaSalle                  09113              N/R                    09/24    N/R          N/R I Quad Cities                N/R              5/30 L - - - -. .
0 1/27 Clinton                  11/1~            8/22                    N/R    8/19        N/R Dresden                  03/08            03/07                            3/04        N/R
                                                                          ,-
3105 LaSalle                  09113              N/R                    09/24    N/R          N/R I Quad Cities                N/R              5/30 L - - - -. .
3/26    TBD          N/R N/R - None Requested    TBD - To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
3/26    TBD          N/R N/R - None Requested    TBD - To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.


Line 148: Line 144:
Exelon Generation Company, LLC Clinton Power Station U-603924 Page 2 of 2 EET/blf cc:        Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station
Exelon Generation Company, LLC Clinton Power Station U-603924 Page 2 of 2 EET/blf cc:        Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station


--.
Exelon(~
Exelon(~
E,elan Nudear 4300 Wmfield Road Nuclear WarrenviHe, ll60 5S5 RS~09~109 August 13,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50454 and STN 50-455 Clinton Power Station, Unit 1  P. V ;l.. () Ji Facility Operating License No. NPF-62 NRC Docket No. 50461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC pocket No. 50-219 Peach Bottom Atomic Power Station. Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NBC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 172009
E,elan Nudear 4300 Wmfield Road Nuclear WarrenviHe, ll60 5S5 RS~09~109 August 13,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50454 and STN 50-455 Clinton Power Station, Unit 1  P. V ;l.. () Ji Facility Operating License No. NPF-62 NRC Docket No. 50461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC pocket No. 50-219 Peach Bottom Atomic Power Station. Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NBC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 172009
Line 168: Line 163:
OPERATOR LICENSING                        Nuclaar R~ulatory Commission. Washington. DC 20555-000
OPERATOR LICENSING                        Nuclaar R~ulatory Commission. Washington. DC 20555-000
* or b7.: internat e-mail 10 in ocoliects@nrC'gov, and to the Desk Offlcer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs, NE 8-10202, (3150-0131), Office of Management and Budget. WaShington, DC 20503. II a means used to impose an information collection does not display a currently valid OMS conlToi number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectIOn.
* or b7.: internat e-mail 10 in ocoliects@nrC'gov, and to the Desk Offlcer, Office of In ormation EXAMINATION DATA                          and Regulatory Affairs, NE 8-10202, (3150-0131), Office of Management and Budget. WaShington, DC 20503. II a means used to impose an information collection does not display a currently valid OMS conlToi number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectIOn.
FACILITY                                                                                                        NRC  REGION Braidwood Station, Units 1 and Z Facility Operating License Nos. NPF-72 and NPF-77                                                                III NRC Oocket Nos. STN S()..456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010            Cy 2011                        Cy 2012                        Cy 2013 PROPOSED NUMBER
FACILITY                                                                                                        NRC  REGION Braidwood Station, Units 1 and Z Facility Operating License Nos. NPF-72 and NPF-77                                                                III NRC Oocket Nos. STN S()..456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010            Cy 2011                        Cy 2012                        Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE*PREPARED                0                          1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010            CY 2011                        CyZOl2                          Cy20JJ PROPOSED NUMBER NUMBER OF REACTOR                      0                    7                                0                              5 OPERATORS NUMBER OF SENtOR REACTOR                    0                    12                                0                              12 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR                                            2                                0                              2 OPERATORS* UPGRADE                      0 NUMBER OF SENIOR REACTOR                                            0                              0                                0 OPERATORS - LlMtTED                    0 PROPOSED DATES PRIMARY DATE                      N/A        0612012011                                N/A                  03/24/2013 ALTERNATE DATE                      N/A        07/11/2011                                N/A                04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                  CY 2011 PROPOSED                                -
                                            --                  --                              --                            -
ESTIMATED NUMBER OF LlCENSEE*PREPARED                0                          1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010            CY 2011                        CyZOl2                          Cy20JJ PROPOSED NUMBER
                                            -                  -                              -                              -
NUMBER OF REACTOR                      0                    7                                0                              5 OPERATORS NUMBER OF SENtOR REACTOR                    0                    12                                0                              12 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR                                            2                                0                              2 OPERATORS* UPGRADE                      0 NUMBER OF SENIOR REACTOR                                            0                              0                                0 OPERATORS - LlMtTED                    0 PROPOSED DATES PRIMARY DATE                      N/A        0612012011                                N/A                  03/24/2013 ALTERNATE DATE                      N/A        07/11/2011                                N/A                04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                  CY 2011 PROPOSED                                -
NUMBER MARCH        JUNE    SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            :u          0          0          0                0                0                  0                19 CANDtDATES NRC FORM 536 (10-2008)                                                                                            PRINTED ON RECYCLED PAPER
NUMBER MARCH        JUNE    SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            :u          0          0          0                0                0                  0                19 CANDtDATES NRC FORM 536 (10-2008)                                                                                            PRINTED ON RECYCLED PAPER


Attachment 2 Response to RIS 2009-11                                                                                Page 1 of 1 NRC FORM 536              U.S. NUCLEAR REGULATORY COMMISSION  APPROVED SY OMS: NO, 315()..0131                        EXPIRES: 1013112011 110-2008)                                                      Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments n1r.rding burden estimate to the Records and FOIAIPrivaoy Services Branch *5 F 3). U.S.
Attachment 2 Response to RIS 2009-11                                                                                Page 1 of 1 NRC FORM 536              U.S. NUCLEAR REGULATORY COMMISSION  APPROVED SY OMS: NO, 315()..0131                        EXPIRES: 1013112011 110-2008)                                                      Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments n1r.rding burden estimate to the Records and FOIAIPrivaoy Services Branch *5 F 3). U.S.
OPERATOR LICENSING                        Nuclear R::\lulatory Commission. Washington. DC 20555-000 ,or br, inlemet e*mail to in OCOllec!s@nrc,gov. and to the Desk Officer. Office of In ormation EXAMINATION DATA                        and Regulatory Affairs, NE S*10202. (3150-0131), Office of Management and Budget, Washlng!on, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection, FACILITY                                                                                                        NRC REGION Byron Station, Units t and 2 Facility Operating License Nos. NPF-37 and NPF-66                                                              III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010                                            Cy 2012 PROPOSED NUMBER
OPERATOR LICENSING                        Nuclear R::\lulatory Commission. Washington. DC 20555-000 ,or br, inlemet e*mail to in OCOllec!s@nrc,gov. and to the Desk Officer. Office of In ormation EXAMINATION DATA                        and Regulatory Affairs, NE S*10202. (3150-0131), Office of Management and Budget, Washlng!on, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection, FACILITY                                                                                                        NRC REGION Byron Station, Units t and 2 Facility Operating License Nos. NPF-37 and NPF-66                                                              III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010                                            Cy 2012 PROPOSED NUMBER
                                             -                Cy 2011
                                             -                Cy 2011 CY 2013 ESTIMATED NUMBER OF L1CENSEE*PREPARED                1                          1                                I                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010 CY2011                          CY 2012 Cy2013 NUMBER OF REACTOR                      8                    0                                0                              6 OPERATORS NUMBER OF SENIOR REACTOR                      8                    6                                6                              6 OPERATORS
                                                                -                                -                              -
CY 2013 ESTIMATED NUMBER OF L1CENSEE*PREPARED                1                          1                                I                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010
                                            -                  -
CY2011                          CY 2012
                                                                                                -
Cy2013
                                                                                                                                -
NUMBER OF REACTOR                      8                    0                                0                              6 OPERATORS NUMBER OF SENIOR REACTOR                      8                    6                                6                              6 OPERATORS
* INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        1                    1                              0                              0 NUMBER OF SENIOR REACTOR                                          0                              0                              0 OPERATORS* LIMITED                      0 PROPOSED DATES PRIMARY DATE              09/27/2010        09/2612011                    09/24/2012                      09/23/2013 ALTERNATE DATE                N/A            10/0312011                    10/0112012                      10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY  2010                                                CY 2011 PROPOSED                              --                                                          -
* INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        1                    1                              0                              0 NUMBER OF SENIOR REACTOR                                          0                              0                              0 OPERATORS* LIMITED                      0 PROPOSED DATES PRIMARY DATE              09/27/2010        09/2612011                    09/24/2012                      09/23/2013 ALTERNATE DATE                N/A            10/0312011                    10/0112012                      10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY  2010                                                CY 2011 PROPOSED                              --                                                          -
NUMBER MARCH      JUNE    SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0          6          0          0                0                6                  0                0 CANDIDATES NRC fORM 536 (10-2008)                                                                                            PRIN1ED ON RECYCLED PAPER
NUMBER MARCH      JUNE    SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0          6          0          0                0                6                  0                0 CANDIDATES NRC fORM 536 (10-2008)                                                                                            PRIN1ED ON RECYCLED PAPER
Line 195: Line 178:
* or a.ma. to In OCOM~sr' and to the Oalk Olllo:er. 0ftIce 011 ann.1ion
* or a.ma. to In OCOM~sr' and to the Oalk Olllo:er. 0ftIce 011 ann.1ion
:llntemet EXAMINATION DATA                          and Regul:      All'an. Nt: .10202. (315().{J131). 0IIIce of ManaQ8lTl8tlt an d Budget. Wuh gton. OC 20503. If a maa". ulMld to IrI'Ij)OIIe an information collection doe. nol dllplay a <lIImlnlly valid OMS COIlIlol number. the NRC ma y not conduct o~n.or. and a peraon I. nol requited to r**pond 10. the Information col    n.
:llntemet EXAMINATION DATA                          and Regul:      All'an. Nt: .10202. (315().{J131). 0IIIce of ManaQ8lTl8tlt an d Budget. Wuh gton. OC 20503. If a maa". ulMld to IrI'Ij)OIIe an information collection doe. nol dllplay a <lIImlnlly valid OMS COIlIlol number. the NRC ma y not conduct o~n.or. and a peraon I. nol requited to r**pond 10. the Information col    n.
FACIUTY                                                                                                        NRCREQION Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62                                                                            III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER
FACIUTY                                                                                                        NRCREQION Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62                                                                            III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010            CY2011 CY2012 CY2013 ESTIMATED NUMBER OF LICENsee-PREPARED                1                    1                                0                                  1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                  0                                0                                  0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                  CY2010
                                          -
CY2010            CY2011
                                                              -                                -
CY2012
                                                                                                                                  -
CY2013 ESTIMATED NUMBER OF LICENsee-PREPARED                1                    1                                0                                  1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                  0                                0                                  0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                  CY2010
                                           -              CY2011
                                           -              CY2011
                                                               -                            CY2012
                                                               -                            CY2012 CY2013 NUMBER OF REACTOR                6 .                8                                0                                  6 OPERATORS NUMBER OF SENIOR REACTOR                                  4                                0                                4 OPERATORS -INSTANT 0
                                                                                                -                                -
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                0                  2                                0                                2 NUMBER OF SENIOR REACTOR OPERATORS* UMfTED                0                  0                                0                                  0 PROPOSED DATES PRIMARY DATE            1012512010        12/0512011                            N/A                          08119/2013 ALTERNATE DATE            1110112010        12/11/2011                            N/A                          08126/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED NUMBER MARCH        JUNE    SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBEfl DECEMBER ESTIMATED NUMBER OF          0          0          9          0                0                  0                    0                0 CANDIDATES I'I'tINTED ON RECYCl.EO PAPER
CY2013 NUMBER OF REACTOR                6 .                8                                0                                  6 OPERATORS NUMBER OF SENIOR REACTOR                                  4                                0                                4 OPERATORS -INSTANT 0
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                0                  2                                0                                2 NUMBER OF SENIOR REACTOR OPERATORS* UMfTED                0                  0                                0                                  0 PROPOSED DATES PRIMARY DATE            1012512010        12/0512011                            N/A                          08119/2013 ALTERNATE DATE            1110112010        12/11/2011                            N/A                          08126/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED NUMBER
                                      -                                                            -
MARCH        JUNE    SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBEfl DECEMBER ESTIMATED NUMBER OF          0          0          9          0                0                  0                    0                0 CANDIDATES I'I'tINTED ON RECYCl.EO PAPER


Attachment 4 Response to RIS 2009*11                                                                                  Page 1 of 1 NRC FORM 536                  U.S. NUCLEAR REGULATORY COMMISSION    APPROVED SY OMS: NO. 3150'()131                          EXPIRES: 1013112011 (1 (j..2008)                                                        Estimated burden per res~onse to comply with tllis voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments re~ardl~ burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.
Attachment 4 Response to RIS 2009*11                                                                                  Page 1 of 1 NRC FORM 536                  U.S. NUCLEAR REGULATORY COMMISSION    APPROVED SY OMS: NO. 3150'()131                          EXPIRES: 1013112011 (1 (j..2008)                                                        Estimated burden per res~onse to comply with tllis voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments re~ardl~ burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S.
OPERATOR LICENSING                          Nuclear R~ulalory Commission, WaShington. DC 20555-000 ,or b" Internet e-mail to in OCOllects@nrc'gov. and 10 the Desk Officer. Office of in ormation EXAMINATION DATA                          and Regulatory Affairs, NE B*10202. (3150'()131). Ollice of Management and Budget. Washmgton, DC 20503. if a means used to impose an information collection does not display a currentry valid OMB contro! number. the NRC mey not conduct or sponsor. and a person Is not required to respond to. the information collection.
OPERATOR LICENSING                          Nuclear R~ulalory Commission, WaShington. DC 20555-000 ,or b" Internet e-mail to in OCOllects@nrc'gov. and 10 the Desk Officer. Office of in ormation EXAMINATION DATA                          and Regulatory Affairs, NE B*10202. (3150'()131). Ollice of Management and Budget. Washmgton, DC 20503. if a means used to impose an information collection does not display a currentry valid OMB contro! number. the NRC mey not conduct or sponsor. and a person Is not required to respond to. the information collection.
FACILITY                                                                                                            NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25                                                          III NRC Docket Nos. 50*237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      Cy 2010            Cy 21)11                        Cy 2012                        Cy 2013
FACILITY                                                                                                            NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25                                                          III NRC Docket Nos. 50*237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      Cy 2010            Cy 21)11                        Cy 2012                        Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                  I                          I                                1                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                          0                                0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2011                        CY 2012                        CY2013 PROPOSED NUMBER                    CY 2010 NUMBER OF REACTOR                        2                    3                                3                              3 OPERATORS NUMBER OF SENIOR REACTOR                        6                    9                                9                              9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        I                    1                                1                              I NUMBER OF SENIOR REACTOR                                              0                                0                              0 OPERATORS - LIMITED                      0 PROPOSED DATES PRIMARY DATE                03108/2010        03/07/2011                    03/0512012                      03f04/2013 ALTERNATE DATE              04/05/2010        04104/2011                    0410212012                      04101/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED                                  -                                                          -
                                                --                --                              --                            -
ESTIMATED NUMBER OF LICENSEE-PREPARED                  I                          I                                1                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                          0                                0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2011                        CY 2012                        CY2013 PROPOSED NUMBER                    CY 2010
                                                -                  -                              -                              -
NUMBER OF REACTOR                        2                    3                                3                              3 OPERATORS NUMBER OF SENIOR REACTOR                        6                    9                                9                              9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        I                    1                                1                              I NUMBER OF SENIOR REACTOR                                              0                                0                              0 OPERATORS - LIMITED                      0 PROPOSED DATES PRIMARY DATE                03108/2010        03/07/2011                    03/0512012                      03f04/2013 ALTERNATE DATE              04/05/2010        04104/2011                    0410212012                      04101/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED                                  -                                                          -
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0          0            0        12                0                0                  0                12 CANDIDATES NRC FORM 536 (10-2008)                                                                                                PRINTED ON RECYCLED PAPER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0          0            0        12                0                0                  0                12 CANDIDATES NRC FORM 536 (10-2008)                                                                                                PRINTED ON RECYCLED PAPER


Attachment 5 Response to RIS 2009-11                                                                                  Page 1 of 1 NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                            EXPIRES: 10/31/2011 (10*2008)                                                        Estimated burden per res~onse to comply with this voluntary inlormation collection request 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments (~arding burden estimate 10 the Records and FOIAlPrlvacy Services Branch -5 F 3), U.S.
Attachment 5 Response to RIS 2009-11                                                                                  Page 1 of 1 NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                            EXPIRES: 10/31/2011 (10*2008)                                                        Estimated burden per res~onse to comply with this voluntary inlormation collection request 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments (~arding burden estimate 10 the Records and FOIAlPrlvacy Services Branch -5 F 3), U.S.
OPERATOR LICENSING                        Nuclear              Com . . .                            5*000 ,or by' inlernet e-mail to                                          OfflC9r. Office of In ormation EXAMINATION DATA                          and Reg                            02, (3150-(131), Office of Management and Budget, Wash ogton. DC 20503. If a means uS9d to impose an information collection does not display a currently valid OMS control number, the NRC mey not conduct or sponsor. and a person is not required to respond to, Ihe Information collecllon.
OPERATOR LICENSING                        Nuclear              Com . . .                            5*000 ,or by' inlernet e-mail to                                          OfflC9r. Office of In ormation EXAMINATION DATA                          and Reg                            02, (3150-(131), Office of Management and Budget, Wash ogton. DC 20503. If a means uS9d to impose an information collection does not display a currently valid OMS control number, the NRC mey not conduct or sponsor. and a person is not required to respond to, Ihe Information collecllon.
fACILITY                                                                                                          NRC FlEGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF-18                                                                III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010
fACILITY                                                                                                          NRC FlEGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF-18                                                                III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011 CY 20t2 CY 2013 LICENSEE-PREPARED                    1                        0                                1                                0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                      0                        0                                0                                  0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                        Cy 2010
                                                -                -
                                                 -              CY2011 CY2012 CY2013 NUMBER OF REACTOR                          3                  0                                6                                  0 OPERATORS NUMBER OF SENIOR REACTOR                        11                  0                                8                                  0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                                                              2 OPERATORS-UPGRADE                            0                  0                                                                  0 NUMBER OF SENIOR REACTOR                                            0                                0                                0 OPERATORS* LIMITED                          0 PROPOSED DATES PRIMARY DATE                  09/14/2010                N/A                  09/24/2012                                  N/A ALTERNATE DATE                09/2112010                N/A                  10/0t/2011                                  N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                  CY 2011 PROPOSED                                  ._                                                        -
CY 2011
                                                                                                  -
CY 20t2
                                                                                                                                    -
CY 2013 LICENSEE-PREPARED                    1                        0                                1                                0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                      0                        0                                0                                  0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                        Cy 2010
                                                 -              CY2011
                                                                  -                                -
CY2012
                                                                                                                                    -
CY2013 NUMBER OF REACTOR                          3                  0                                6                                  0 OPERATORS NUMBER OF SENIOR REACTOR                        11                  0                                8                                  0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                                                              2 OPERATORS-UPGRADE                            0                  0                                                                  0 NUMBER OF SENIOR REACTOR                                            0                                0                                0 OPERATORS* LIMITED                          0 PROPOSED DATES PRIMARY DATE                  09/14/2010                N/A                  09/24/2012                                  N/A ALTERNATE DATE                09/2112010                N/A                  10/0t/2011                                  N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                  CY 2011 PROPOSED                                  ._                                                        -
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER        MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF              I)          0            0        0              0                  14                0                  0 CANDIDATES NRC FORM 536 (1()'2008)                                                                                            PRINTED ON RECYCLED PAPER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER        MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF              I)          0            0        0              0                  14                0                  0 CANDIDATES NRC FORM 536 (1()'2008)                                                                                            PRINTED ON RECYCLED PAPER


Line 250: Line 209:
* cumIIIIIy YIIId a.e ~ 1U1IbIr..... HAC III8Y not condu~..,r. 8nd
* cumIIIIIy YIIId a.e ~ 1U1IbIr..... HAC III8Y not condu~..,r. 8nd
* IHIrtOn Ie not requlNd to raapond to. 11M InbmMlon
* IHIrtOn Ie not requlNd to raapond to. 11M InbmMlon
* f/IIDUrY                                                                                                              HRCMGIOH Umerlck Geaeradill Statio.. U.lta 1 ad 1 Facility Oper_dIIl LkerlseN-. NPF-39'" NPF-85                                                                        I NRC Docket Net. 50-35% ad 5O-35l A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF
* f/IIDUrY                                                                                                              HRCMGIOH Umerlck Geaeradill Statio.. U.lta 1 ad 1 Facility Oper_dIIl LkerlseN-. NPF-39'" NPF-85                                                                        I NRC Docket Net. 50-35% ad 5O-35l A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CylOI.
                                              -
CylOI.
                                                                -
Cy2.11                            CylOll
Cy2.11                            CylOll
                                                                                                     -                                  Cy2.13
                                                                                                     -                                  Cy2.13 UCENSEE-PREPARED                  1                          0                                    I                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPAAED EXAMINATIONS 0                        *                                    *
                                                                                                                                            -
* B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER ev 201.
UCENSEE-PREPARED                  1                          0                                    I                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPAAED EXAMINATIONS 0                        *                                    *
Cy20U ev 1012 Cy2013 NUMBER OF REACTOR OPERATORS
* B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER
                                              -,
ev 201.
                                                                -
Cy20U
                                                                                                    -
ev 1012
                                                                                                                                            -
Cy2013 NUMBER OF REACTOR OPERATORS
* 11                                        0 NUMBER OF SENIOR REACTOR                      7                  0                                    5                                      0 OPERATORS
* 11                                        0 NUMBER OF SENIOR REACTOR                      7                  0                                    5                                      0 OPERATORS
* INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        5                  0                                    %
* INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        5                  0                                    %
* NUMBER OF SENIOR REACTOR OPERATORS* LlMrTED
NUMBER OF SENIOR REACTOR OPERATORS* LlMrTED
* 0                                    ,                                        0 PROPOSED DATES PRIMARY DATE                10l04ll01.              N/A                      1000lllOIl                                        N/A AI.TERNATE DATE              1811112.1.                N/A                    89Jl41lOIl                                        N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011                                                      CY 20U PROPOSED NUMBER
* 0                                    ,                                        0 PROPOSED DATES PRIMARY DATE                10l04ll01.              N/A                      1000lllOIl                                        N/A AI.TERNATE DATE              1811112.1.                N/A                    89Jl41lOIl                                        N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011                                                      CY 20U PROPOSED NUMBER MARCH      JUNE    ISEPTEMBER DECEMBER          MARCH                JUNE            !SEPTEMBER DeCEMBER ESTIMATED NUMBER OF CANDIDATES
                                            -                                                            -
                             ,          ,          0        0              0                    16                      It NRC FOI!M _    (1o.:1m1)
MARCH      JUNE    ISEPTEMBER DECEMBER          MARCH                JUNE            !SEPTEMBER DeCEMBER ESTIMATED NUMBER OF CANDIDATES
                             ,          ,          0        0              0                    16                      It
* NRC FOI!M _    (1o.:1m1)


Attachment 6 Response to RIS    2009~11                                                                              Page 2 of 2 NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPRoveo BY OMB: NO. 315O.Q131                          EXPIRES: 1013112011 (10*2005)                                                        Estimated burden per res~onse to comply with this voluntary informatio n collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations. Sand comments ref.rdln~ burden estimale to the Records and FOIAfPrivacy Services Branch -5 F 3). U.S.
Attachment 6 Response to RIS    2009~11                                                                              Page 2 of 2 NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION  APPRoveo BY OMB: NO. 315O.Q131                          EXPIRES: 1013112011 (10*2005)                                                        Estimated burden per res~onse to comply with this voluntary informatio n collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations. Sand comments ref.rdln~ burden estimale to the Records and FOIAfPrivacy Services Branch -5 F 3). U.S.
OPERATOR LICENSING                        Nuclear Re~ulatory Commission, Washington, DC 20555*000 , or b, Internet e-mail to in OCOlieCtl!@nrc-g0v, and to the Oesk Officer. Office of tn ormatlon EXAMINATION DATA                          and Regulatory Affairs, NE B*10202, (3150*0131), Office of Management and Budget, WB$htngton. DC 20503.        If a means used to Impose an Informaflon collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor. and a person is not requited to respond to, the informatlon coliecUon.
OPERATOR LICENSING                        Nuclear Re~ulatory Commission, Washington, DC 20555*000 , or b, Internet e-mail to in OCOlieCtl!@nrc-g0v, and to the Oesk Officer. Office of tn ormatlon EXAMINATION DATA                          and Regulatory Affairs, NE B*10202, (3150*0131), Office of Management and Budget, WB$htngton. DC 20503.        If a means used to Impose an Informaflon collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor. and a person is not requited to respond to, the informatlon coliecUon.
FACll-trY                                                                                                        NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S                                                                I NRC Docket Nos. 50~352 and 50-353 A. PROPOSED EXAMINA,.ION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER
FACll-trY                                                                                                        NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S                                                                I NRC Docket Nos. 50~352 and 50-353 A. PROPOSED EXAMINA,.ION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER CY 2011                        CY 2012
                                                -                -
                                                                                                   -                          CY 2013 ESTIMATED NUMBER OF LICENSEE*PREPARED                    1                        0                                0                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                      0                        0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010            CY2011                          CY 2012                        Cy2013 PROPOSED NUMBER NUMBER OF REACTOR                          0                  0                                0                              0 OPERATORS NUMBER OF SENIOR REACTOR                        0                  0                                0                              0 OPERATORS
CY 2011                        CY 2012
                                                                                                   -                          CY 2013
                                                                                                                                  -
ESTIMATED NUMBER OF LICENSEE*PREPARED                    1                        0                                0                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                      0                        0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010            CY2011                          CY 2012                        Cy2013 PROPOSED NUMBER
                                                -                -                              -                              -
NUMBER OF REACTOR                          0                  0                                0                              0 OPERATORS NUMBER OF SENIOR REACTOR                        0                  0                                0                              0 OPERATORS
* INSTANT NUMBER OF SENIOR REACTOR                                            0                                0                              0 OPERATORS* UPGRADE                          0 NUMBER OF SENIOR REACTOR                                            0                              0                              0 OPERATORS* LIMITED                        8 PROPOSED DATES PRIMARY DATE                  06/1412010                N/A                            N/A                          N/A ALTERNATE DATE                0610712010                N/A                              N/A                          N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy    2010                                                CY 2011 PROPOSED                                  -                                                        -
* INSTANT NUMBER OF SENIOR REACTOR                                            0                                0                              0 OPERATORS* UPGRADE                          0 NUMBER OF SENIOR REACTOR                                            0                              0                              0 OPERATORS* LIMITED                        8 PROPOSED DATES PRIMARY DATE                  06/1412010                N/A                            N/A                          N/A ALTERNATE DATE                0610712010                N/A                              N/A                          N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy    2010                                                CY 2011 PROPOSED                                  -                                                        -
NUMBER MARCH      JUNE      SEPTEMBER DECEMBER        MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF              0          0            0        0                0                  0                0                0 CANDIDATES NRC FORM 536 (1Cl-2006)                                                                                            PRImED ON RECYCLED PAPER
NUMBER MARCH      JUNE      SEPTEMBER DECEMBER        MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF              0          0            0        0                0                  0                0                0 CANDIDATES NRC FORM 536 (1Cl-2006)                                                                                            PRImED ON RECYCLED PAPER
Line 292: Line 230:
OPERATOR LICENSING                          Nuclear Re~ulatOry Commission, Washington, DC 20555-000 ,or ~ Internet e-mail to in ocoliecls@nrc,gov, and to the Oesk Officer, Offie" olIn ormation EXAMINATION DATA                          and RegUlat~ Affairs. NE IM0202, (3150'()131), Office of Management and Budget, Wash ngton, DC 20503. if a means used to impose an information collection does nol display a currently valid OMS conlrol number, the NRC may not conduct or s~onsor, and a person Is not required to respond to, the information collect n.
OPERATOR LICENSING                          Nuclear Re~ulatOry Commission, Washington, DC 20555-000 ,or ~ Internet e-mail to in ocoliecls@nrc,gov, and to the Oesk Officer, Offie" olIn ormation EXAMINATION DATA                          and RegUlat~ Affairs. NE IM0202, (3150'()131), Office of Management and Budget, Wash ngton, DC 20503. if a means used to impose an information collection does nol display a currently valid OMS conlrol number, the NRC may not conduct or s~onsor, and a person Is not required to respond to, the information collect n.
FACILITY                                                                                                          NRCREQION Oyster Creek Nuclear Generating Station Renewed Facility OperatiDg License No. DPR-16                                                                      I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER
FACILITY                                                                                                          NRCREQION Oyster Creek Nuclear Generating Station Renewed Facility OperatiDg License No. DPR-16                                                                      I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER
                                               -              Cy 2011
                                               -              Cy 2011 CY 20ll                        CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                          1                                1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR                        6                    6                                6                              0 OPERATORS NUMBER OF SENIOR REACTOR                      7                    7                                8                              0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                            1 OPERATORS*UPGRADE                          2                                                    2                              0 NUMBER OF SENIOR REACTOR                                            0                                0                              0 OPERATORS - LIMITED                      0 PROPOSED DATES PRIMARY DATE                05/17/2010        07lUl2011                    05/2812012                                N/A ALTERNATE DATE                05/24/2010        0711812011                    06/0412012                                N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE Cy 2010                                                    CY 2011 PROPOSED                                -                                                          -
                                                                  -                                -
CY 20ll                        CY 2013
                                                                                                                                  -
ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                          1                                1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER
                                              -
CY 2010
                                                                -
CY2011
                                                                                                  -
CY2012
                                                                                                                                  -
CY2013 NUMBER OF REACTOR                        6                    6                                6                              0 OPERATORS NUMBER OF SENIOR REACTOR                      7                    7                                8                              0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                            1 OPERATORS*UPGRADE                          2                                                    2                              0 NUMBER OF SENIOR REACTOR                                            0                                0                              0 OPERATORS - LIMITED                      0 PROPOSED DATES PRIMARY DATE                05/17/2010        07lUl2011                    05/2812012                                N/A ALTERNATE DATE                05/24/2010        0711812011                    06/0412012                                N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE Cy 2010                                                    CY 2011 PROPOSED                                -                                                          -
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            13          0            0          0                14                0                  0                0 CANOlDATES NRC FORM 536 (10-2008)                                                                                              PRINTED ON RECYCLED PAPER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            13          0            0          0                14                0                  0                0 CANOlDATES NRC FORM 536 (10-2008)                                                                                              PRINTED ON RECYCLED PAPER


Line 312: Line 238:
(
(
Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY 2010
Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY 2010
                                             -                CY 2011
                                             -                CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                0                          1                                0                                I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                          0                                0                                0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010 Cy2011                          CY2012 Cy2013 NUMBER OF REACTOR                        0                    6                                0                                8 OPERATORS NUMBER OF SENIOR REACTOR                      0                    8                                0                              10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                          3                                0                                2 OPERATORS-UPGRADE                        0 NUMBER OF SENIOR REACTOR                                          0                                0                                0 OPERATORS* LIMITED
                                                                -
CY 2012
                                                                                                  -                              -
CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                0                          1                                0                                I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                          0                                0                                0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010
                                            -                  -
Cy2011                          CY2012
                                                                                                  -                              -
Cy2013 NUMBER OF REACTOR                        0                    6                                0                                8 OPERATORS NUMBER OF SENIOR REACTOR                      0                    8                                0                              10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                          3                                0                                2 OPERATORS-UPGRADE                        0 NUMBER OF SENIOR REACTOR                                          0                                0                                0 OPERATORS* LIMITED
* PROPOSED DATES PRIMARY DATE
* PROPOSED DATES PRIMARY DATE
* 01/31/2011                                N/A                0211112013 ALTERNATE DATE
* 01/31/2011                                N/A                0211112013 ALTERNATE DATE
Line 330: Line 248:
Estimated burden per res~onse to comply wIth this voluntary information collection request: 1 hour. his information collection is llSed to plan budgets and resourCes lor operator examinations. Send comments rer.rdln~ burden estimate to the Records and FOINPrivacy Services Branch *5 F 3). U.S.
Estimated burden per res~onse to comply wIth this voluntary information collection request: 1 hour. his information collection is llSed to plan budgets and resourCes lor operator examinations. Send comments rer.rdln~ burden estimate to the Records and FOINPrivacy Services Branch *5 F 3). U.S.
OPERATOR LICENSING                        Nuclear Ro?,ulalOry Commission. Washington, DC 20555-000 ,or          bt: internet e-mail to in ocollects@nrc'gov, and to Ihe Desk Officer, Office 01 In ormation EXAMINATION DATA                        and Regulatory Allairs, NE B*l0202, (3150-{)131), Office of Management and Budget. Washington, DC 20503. If a means used to Impop an Information collection does 1'101 display a currently valid OMS conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecllOn.
OPERATOR LICENSING                        Nuclear Ro?,ulalOry Commission. Washington, DC 20555-000 ,or          bt: internet e-mail to in ocollects@nrc'gov, and to Ihe Desk Officer, Office 01 In ormation EXAMINATION DATA                        and Regulatory Allairs, NE B*l0202, (3150-{)131), Office of Management and Budget. Washington, DC 20503. If a means used to Impop an Information collection does 1'101 display a currently valid OMS conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecllOn.
FACILITY                                                                                                          NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR*29 and DPR-30                                                          1II NRC Docket Nos. 50~254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2010            Cy 2011                          Cy 2012                        Cy 2013 PROPOSED NUMBER
FACILITY                                                                                                          NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR*29 and DPR-30                                                          1II NRC Docket Nos. 50~254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2010            Cy 2011                          Cy 2012                        Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED                0                          1                                  1                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                          0                                  0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010
                                            -                  -                                -                              -
ESTIMATED NUMBER OF LICENSEE-PREPARED                0                          1                                  1                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                          0                                  0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010
                                             -                Cy201t
                                             -                Cy201t
                                                                 -                              CY2012
                                                                 -                              CY2012 CY2013 NUMBER OF REACTOR                      0                    6                                  4                              3 OPERATORS NUMBER OF SENIOR REACTOR                    0                  11                                10                              10 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                        0                    0                                  1                              1 NUMBER OF SENIOR REACTOR                                          0                                  0                              0 OPERATORS* LIMITED                    0 PROPOSED DATES PRIMARY DATE                      N/A        05/30/2011                      03/12/2012                      0411512013 ALTERNATE DATE                      N/A        06113/2011                      03/26/2012                      04/2912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED                              -                                                              -
                                                                                                  -                              -
CY2013 NUMBER OF REACTOR                      0                    6                                  4                              3 OPERATORS NUMBER OF SENIOR REACTOR                    0                  11                                10                              10 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                        0                    0                                  1                              1 NUMBER OF SENIOR REACTOR                                          0                                  0                              0 OPERATORS* LIMITED                    0 PROPOSED DATES PRIMARY DATE                      N/A        05/30/2011                      03/12/2012                      0411512013 ALTERNATE DATE                      N/A        06113/2011                      03/26/2012                      04/2912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED                              -                                                              -
NUMBER MARCH      JUNE    SEPTEMBER DECEMBER          MARCH                JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0          0          0        14                0                    0                  0                0 CANDIDATES NRC FORM.536 (10-2008)                                                                                              PRINTEO ON RECYCLED PAPER
NUMBER MARCH      JUNE    SEPTEMBER DECEMBER          MARCH                JUNE          SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0          0          0        14                0                    0                  0                0 CANDIDATES NRC FORM.536 (10-2008)                                                                                              PRINTEO ON RECYCLED PAPER


Line 345: Line 259:
not conduct    o~naor, and a paNlcn ia not raqulrad ta r..pond ta. thl Informallon col      .
not conduct    o~naor, and a paNlcn ia not raqulrad ta r..pond ta. thl Informallon col      .
FACIUlY                                                                                                            NRC REGION Three Mne Island Nuclear Statloll, Unit 1 FacUlty Operadlll License 110. DPR-50                                                                                I NRC Docket No. 50..189 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cy 2010
FACIUlY                                                                                                            NRC REGION Three Mne Island Nuclear Statloll, Unit 1 FacUlty Operadlll License 110. DPR-50                                                                                I NRC Docket No. 50..189 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cy 2010
                                               -                Cy lOll
                                               -                Cy lOll Cy2011 cy 2013 I.ICENSEE-PREPARED                  J                          1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOll CyZOll                            CylO13 NUMBER OF REACTOR                        1                  10                                0 OPERATORS                                                                                                                  9 NUMBER OF SENIOR REACTOR                        1                  10                                0                                8 OPERATORS
                                                                  -                              -
Cy2011
                                                                                                                                    -
cy 2013 I.ICENSEE-PREPARED                  J                          1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER
                                              -
CY 2010
                                                                  -
CylOll
                                                                                                  -
CyZOll                            CylO13
                                                                                                                                    -
NUMBER OF REACTOR                        1                  10                                0 OPERATORS                                                                                                                  9
                                                    .'
NUMBER OF SENIOR REACTOR                        1                  10                                0                                8 OPERATORS
* INSTANT NUMBER OF SENfOR REACTOR                                            I                                0 OPERATORS - UPGRADE                        0                                                                                      1 NUMBER OF SENIOR REACTOR                                            0                                0                                0 OPERATORS* LIMITED                        0 PROPOSED DATES PRIMARY DATE                OllllllOtO        0911112011                              N/A                    09/0911013 AtTERNATE DATE                0112812010        09/1911011                              N/A                    09/1612013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 1011 PROPOSED                                -~",--                                                      -
* INSTANT NUMBER OF SENfOR REACTOR                                            I                                0 OPERATORS - UPGRADE                        0                                                                                      1 NUMBER OF SENIOR REACTOR                                            0                                0                                0 OPERATORS* LIMITED                        0 PROPOSED DATES PRIMARY DATE                OllllllOtO        0911112011                              N/A                    09/0911013 AtTERNATE DATE                0112812010        09/1911011                              N/A                    09/1612013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 1011 PROPOSED                                -~",--                                                      -
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE            ISEPTEMBER DECEMBER ESTIMATED NUMBER OF            21          0              0        0                18              0                    0                0 CANDIDATES NRC FORM 538 (lMOOt1)                                                                                                PRINTED QK RECYCLED P""ER
NUMBER MARCH        JUNE      SEPTEMBER DECEMBER          MARCH              JUNE            ISEPTEMBER DECEMBER ESTIMATED NUMBER OF            21          0              0        0                18              0                    0                0 CANDIDATES NRC FORM 538 (lMOOt1)                                                                                                PRINTED QK RECYCLED P""ER
Line 378: Line 278:
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rerf'rdlng burden OPERATOR LICENSING                        estimate to the Records and FOIAIPrivacy Services Branch \ *5 F53). U.S.
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rerf'rdlng burden OPERATOR LICENSING                        estimate to the Records and FOIAIPrivacy Services Branch \ *5 F53). U.S.
Nuclear Re~ulalOry Commission, Washington, DC 20555'()()O , Of bllntemet e-mail to in OColiects@nrc-g0v, and to the Desk Officer. Office of In ormation EXAMINATION DATA                          and Regulatory Affairs. NE 8-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503. If a means used to impose an information colledlon does no! display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection.
Nuclear Re~ulalOry Commission, Washington, DC 20555'()()O , Of bllntemet e-mail to in OColiects@nrc-g0v, and to the Desk Officer. Office of In ormation EXAMINATION DATA                          and Regulatory Affairs. NE 8-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503. If a means used to impose an information colledlon does no! display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection.
FACIUTV                                                                                                          NRC REGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62                                                                          III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2009            CY 2010                        CY2011                          CY2012
FACIUTV                                                                                                          NRC REGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62                                                                          III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2009            CY 2010                        CY2011                          CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                  1                              1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                    0                  0                              0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY2009              CY 2010                        CY 2011                        CY2012 NUMBER OF REACTOR                                                                      6 6                  6                                                              0 OPERATORS NUMBER OF SENIOR REACTOR                                    0                              4                              0 OPERATORS INSTANT 6
                                            -                  -                              -                              -
ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                  1                              1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                    0                  0                              0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY2009              CY 2010                        CY 2011                        CY2012
                                            -                  -                              -                              -
NUMBER OF REACTOR                                                                      6 6                  6                                                              0 OPERATORS NUMBER OF SENIOR REACTOR                                    0                              4                              0 OPERATORS INSTANT 6
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                  0                                2                              0 NUMBER OF SENIOR REACTOR 0                  0                              0                              0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE              08/24/2009          10/25/2010                    11/28/2011                          N/A ALTERNATE DATE              08/17/2009          11/01/2010                    12/05/2011                          N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY  2009                                                  CY 2010 PROPOSED                                                                                              -~~.--
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2                  0                                2                              0 NUMBER OF SENIOR REACTOR 0                  0                              0                              0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE              08/24/2009          10/25/2010                    11/28/2011                          N/A ALTERNATE DATE              08/17/2009          11/01/2010                    12/05/2011                          N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY  2009                                                  CY 2010 PROPOSED                                                                                              -~~.--
NUMBER                                  SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER MARCH        JUNE ESTIMATED NUMBER OF            0            0        6          0                0                0                  10                0 CANDIDATES "IRe FORM 536 (8-2005)                                                                                              PRINTED ON RECVCLED PAPER
NUMBER                                  SEPTEMBER DECEMBER            MARCH              JUNE          SEPTEMBER DECEMBER MARCH        JUNE ESTIMATED NUMBER OF            0            0        6          0                0                0                  10                0 CANDIDATES "IRe FORM 536 (8-2005)                                                                                              PRINTED ON RECVCLED PAPER
Line 486: Line 382:
::~~~~~'fhefll{~~~;:J~8i~:~~~;~~::~'Wr~~t;r;'~i~r~~~.
::~~~~~'fhefll{~~~;:J~8i~:~~~;~~::~'Wr~~t;r;'~i~r~~~.
OPERATOR LICENSING                                      NUi._*~:lr Regulatory Ct}mmis!>.inn. WJ~hlOglOn. DC ~055S-00f)j. Of            bl  inlemet e-m;ut III jlltu~.:tlllet1~@nrc_f.)V**in<! tlJ the Oe~k. Offi\:er. Otflt:e oi In nflTUlt.iun EXAMINATION DATA                                      and    Re~ula",'l' Aff...... NE 8-)0101. /.lI50-IlIJll. Olr",e      "r  M.n.gemel1l.oo B\<<Ig:e~. Wa.'hJ~tHn. DC :!()SOJ, If a met1~:. usro: UJ Impo~ an mformahnn I.:(lllet:uun ~s ROC display.a currently VJl1d OMS I.'onirol number. lhe NRC'            m.;ay nm l'tHK'1UCt or ~'nsur. and a perN.Hl is nOI requIred to J"el'ptJoo fll, the inrormiltl(lIt t.'1.)lleclion.
OPERATOR LICENSING                                      NUi._*~:lr Regulatory Ct}mmis!>.inn. WJ~hlOglOn. DC ~055S-00f)j. Of            bl  inlemet e-m;ut III jlltu~.:tlllet1~@nrc_f.)V**in<! tlJ the Oe~k. Offi\:er. Otflt:e oi In nflTUlt.iun EXAMINATION DATA                                      and    Re~ula",'l' Aff...... NE 8-)0101. /.lI50-IlIJll. Olr",e      "r  M.n.gemel1l.oo B\<<Ig:e~. Wa.'hJ~tHn. DC :!()SOJ, If a met1~:. usro: UJ Impo~ an mformahnn I.:(lllet:uun ~s ROC display.a currently VJl1d OMS I.'onirol number. lhe NRC'            m.;ay nm l'tHK'1UCt or ~'nsur. and a perN.Hl is nOI requIred to J"el'ptJoo fll, the inrormiltl(lIt t.'1.)lleclion.
FACILITY Limerick Generating Station, Units 1 and 2 NRC REGION
FACILITY Limerick Generating Station, Units 1 and 2 NRC REGION Facility Operating License Nos. NPF*39 and NPF*85 NRC Docket Nos. 50-352 and 5()"353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2009                    CYgQ1Q                                  CY2011                                  CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                        ..                          1                                      0                                        1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                          0                            0                                        0                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CYgQQ2                  CY2010                                  CY2011                                    CY 2012 NUMBER OF REACTOR OPERATORS                            0                            6                                      0                                        4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                        0                          10                                        0                                        6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                          0                          2                                        0                                        3 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED
                                                                                                                                                                        ,
Facility Operating License Nos. NPF*39 and NPF*85 NRC Docket Nos. 50-352 and 5()"353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2009                    CYgQ1Q                                  CY2011                                  CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                        ..                          1                                      0                                        1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                          0                            0                                        0                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CYgQQ2                  CY2010                                  CY2011                                    CY 2012 NUMBER OF REACTOR OPERATORS                            0                            6                                      0                                        4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                        0                          10                                        0                                        6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                          0                          2                                        0                                        3 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED
                                                         .                          0                                        0                                        0 PROPOSED DATES PRIMARY DATE                          ..              10/04/2010                                      N/A                            10/0812012 ALTERNATE DATE                        1<
                                                         .                          0                                        0                                        0 PROPOSED DATES PRIMARY DATE                          ..              10/04/2010                                      N/A                            10/0812012 ALTERNATE DATE                        1<
10/18/2010                                      NlA                            10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009                                                                            CV2010 PROPOSED NUMBER          MARCH        JUNE      SEPTEMBER      DECEMBER                MARCH                      JUNE                  SEPTEMBER                    DECEMBER ESTIMATED NUM8EROF            0          16              0                0                    0                        0                            0                          0 CA\lDIDATES
10/18/2010                                      NlA                            10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009                                                                            CV2010 PROPOSED NUMBER          MARCH        JUNE      SEPTEMBER      DECEMBER                MARCH                      JUNE                  SEPTEMBER                    DECEMBER ESTIMATED NUM8EROF            0          16              0                0                    0                        0                            0                          0 CA\lDIDATES
Line 497: Line 391:
and reS4IUJ\'-el> for operator ~x;lmmalj()ns.. Send ,,'\'mment!'> rffatd)~ ~unko esflmatt tv the Re~:nt&#xa5;~ and F9tAIPri\'ocy Ser.... ke' Branch T*.s J)*.u,s, OPERATOR LICENSING IOn EXAMINATION DATA                                                                                            I. Off"," of M'''''fI''mcnt and Budget. WIL\hmgh'm. IX: 10503. If a. meanl'l u~ to imp()~ an inliltmation
and reS4IUJ\'-el> for operator ~x;lmmalj()ns.. Send ,,'\'mment!'> rffatd)~ ~unko esflmatt tv the Re~:nt&#xa5;~ and F9tAIPri\'ocy Ser.... ke' Branch T*.s J)*.u,s, OPERATOR LICENSING IOn EXAMINATION DATA                                                                                            I. Off"," of M'''''fI''mcnt and Budget. WIL\hmgh'm. IX: 10503. If a. meanl'l u~ to imp()~ an inliltmation
                                                                             ",JIec"," d\>.... 1t di'l'lay a (utremly valid OMB contr(ll number. tho NRC may
                                                                             ",JIec"," d\>.... 1t di'l'lay a (utremly valid OMB contr(ll number. tho NRC may
:;~,:~~~~ ~It~~~~. and 3 ~r~)(\ I~ nul requlrW 10 fe.';)nnd h). the FACILITY Oyster Creek Nuclear Generating Station NRC REGION
:;~,:~~~~ ~It~~~~. and 3 ~r~)(\ I~ nul requlrW 10 fe.';)nnd h). the FACILITY Oyster Creek Nuclear Generating Station NRC REGION Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2009                CY2010                                CY 2011                                  CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                      1                      1                                        1                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                      0                                      0                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY~                  CYgQ1Q                                CY2011                                  CY2012 NUMBER OF REACTOR OPERATORS                          6                      6                                      6                                        0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                      10                      8                                      10                                        0 NUMBER OF SENIOR REACTOR OPERATOR~UPGRADE 0                      2                                      2                                        0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED                      0                      0                                      0                                        0 PROPOSED DATES PRIMARY DATE                    5/04/2009            5/17/2010                            5/16/2011                                      NlA ALTERNATE DATE                    5/11/2009            5/24/2010                            5/23/2011                                      N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009                                                                      cr2010 PROPOSED NUMBER            MARCH      JUNE        SEPTEMBER      DECEMBER          MARCH                        JUNE                  SEPTEMBER                  DECEMBER ESTIMATED NUMBER OF            14          0              0            16                0                          0                          0                        0 CANDIDATES
                                                                                                                                                                    ,
Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2009                CY2010                                CY 2011                                  CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                      1                      1                                        1                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                      0                                      0                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY~                  CYgQ1Q                                CY2011                                  CY2012 NUMBER OF REACTOR OPERATORS                          6                      6                                      6                                        0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                      10                      8                                      10                                        0 NUMBER OF SENIOR REACTOR OPERATOR~UPGRADE 0                      2                                      2                                        0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED                      0                      0                                      0                                        0 PROPOSED DATES PRIMARY DATE                    5/04/2009            5/17/2010                            5/16/2011                                      NlA ALTERNATE DATE                    5/11/2009            5/24/2010                            5/23/2011                                      N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009                                                                      cr2010 PROPOSED NUMBER            MARCH      JUNE        SEPTEMBER      DECEMBER          MARCH                        JUNE                  SEPTEMBER                  DECEMBER ESTIMATED NUMBER OF            14          0              0            16                0                          0                          0                        0 CANDIDATES


Response to RIS 2008-16                                                                                                                                            Attachment 8 Page 1 of 1 NRC FORM SJ6                        l:.S NUCLEAR REGULATOR\, CO~MISSION  APPROVED BY OMB: NO. 3151)*01JI                                                EXPIRES; Oil/31111lO1!
Response to RIS 2008-16                                                                                                                                            Attachment 8 Page 1 of 1 NRC FORM SJ6                        l:.S NUCLEAR REGULATOR\, CO~MISSION  APPROVED BY OMB: NO. 3151)*01JI                                                EXPIRES; Oil/31111lO1!
Line 544: Line 436:
Esr.imuted burden ~ re.'pon~ tH L,(Jmply with this \'oJunt~IlY information (t)IIe(.'tiull request: I hc)ur. ThIs mfhrYWllfOfl('111lccllun t/\ u~ to plan budgets
Esr.imuted burden ~ re.'pon~ tH L,(Jmply with this \'oJunt~IlY information (t)IIe(.'tiull request: I hc)ur. ThIs mfhrYWllfOfl('111lccllun t/\ u~ to plan budgets
                                                                           ~~:a~~~~~hef~~~~I~roi~~:~~ Se::~~:,"Itr~:cm~i~~r.r~~,
                                                                           ~~:a~~~~~hef~~~~I~roi~~:~~ Se::~~:,"Itr~:cm~i~~r.r~~,
OPERATOR LICENSING                                                                                        *DC1OSS5.-(XlOl. (l' bf In,ernet EXAMINATION DATA                                    Budget. W..htngton. DC 10503. If a mean< used.n impuse .n inrnrmatioo
OPERATOR LICENSING                                                                                        *DC1OSS5.-(XlOl. (l' bf In,ernet EXAMINATION DATA                                    Budget. W..htngton. DC 10503. If a mean< used.n impuse .n inrnrmatioo ntand
                                                                                                                                                              '"
ntand
                                                                           ,,>I1<i<1.'. d"., I'Krt di""lay
                                                                           ,,>I1<i<1.'. d"., I'Krt di""lay
* cu~!ltlr valid OMB ""ollul numbe,. tlte NRC ""'Y iri~ll=~~~ ~~t~;n~~~. and a perr_on i." nne requred w re~ukj In, lhe FACILITY                                                                                                                                      NRCllEGION Braidwood Station, Units 1 and 2                                                                                                        III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2008                  CY2009                                  CY201Q                                CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED                      0                          1                                      0                                    1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                        0                                        0                                    0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2008                  CYgQQa                                  CY2010                                CY2011 NUMBER OF REACTOR OPERATORS                          0                        1                                        0                                    6 NUMBER OF SENIOR REACfOR OPERATORS-INSTANT                      0                        13                                      0                                    12 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE                        0                        1                                      0                                    2 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED                      0                        0                                      0                                    0 PROPOSED DATES PRIMARY DATE                                            10/5/09                                                                      4/4/2011 ALTERNATE DATE                                          10/19109                                                                    5116/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cvgQ.QB.                                                                        CV~
* cu~!ltlr valid OMB ""ollul numbe,. tlte NRC ""'Y iri~ll=~~~ ~~t~;n~~~. and a perr_on i." nne requred w re~ukj In, lhe FACILITY                                                                                                                                      NRCllEGION Braidwood Station, Units 1 and 2                                                                                                        III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2008                  CY2009                                  CY201Q                                CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED                      0                          1                                      0                                    1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                        0                                        0                                    0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2008                  CYgQQa                                  CY2010                                CY2011 NUMBER OF REACTOR OPERATORS                          0                        1                                        0                                    6 NUMBER OF SENIOR REACfOR OPERATORS-INSTANT                      0                        13                                      0                                    12 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE                        0                        1                                      0                                    2 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED                      0                        0                                      0                                    0 PROPOSED DATES PRIMARY DATE                                            10/5/09                                                                      4/4/2011 ALTERNATE DATE                                          10/19109                                                                    5116/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cvgQ.QB.                                                                        CV~
Line 577: Line 467:
Response to RIS 2007-17                                                                                                                                            Attachment 5 Page 1 of 1 NIlC FORM S36                    u.s NUCLEAR REGIILATORV COMMISSION  APPROVED !IV OMB: NO. .115lJ.OIll                                                    EXPIRES: UKIlII:!(X)S llI-lOO5)                                                            EstimiUcd bu~n ~r rcsptJnse h. t'OmpJy w~h thif. VtllUnl3ry inform~ti(ln
Response to RIS 2007-17                                                                                                                                            Attachment 5 Page 1 of 1 NIlC FORM S36                    u.s NUCLEAR REGIILATORV COMMISSION  APPROVED !IV OMB: NO. .115lJ.OIll                                                    EXPIRES: UKIlII:!(X)S llI-lOO5)                                                            EstimiUcd bu~n ~r rcsptJnse h. t'OmpJy w~h thif. VtllUnl3ry inform~ti(ln
                                                                         ,:ulkt:t;"Jn rtque~: I huur, This tllfnrmaul.1ft ~;ttne(.1i()n b w.ed to ,;>I;m hudgets and reSoUI\"eS fhr l                        '
                                                                         ,:ulkt:t;"Jn rtque~: I huur, This tllfnrmaul.1ft ~;ttne(.1i()n b w.ed to ,;>I;m hudgets and reSoUI\"eS fhr l                        '
tMimllle.o.1Io R OPERATOR LICENSING EXAMINATION DATA
tMimllle.o.1Io R OPERATOR LICENSING EXAMINATION DATA and udget~    WashlUlhlll. DC 20.503. Ira mean;~ woed to impose an m(llrInatiofl
                                                                                                                                                                ..
and udget~    WashlUlhlll. DC 20.503. Ira mean;~ woed to impose an m(llrInatiofl
                                                                         ,*.,Ueetion IR,., ..,I display. <urrentl~ v.lid OMS ,"ntml number. the NRC may not l,.'olldt..K.'t llf ."pOMOf. JOO .. perSHfI is not required to re....pond tn. the itUhrmatktn ":tJIItc.'fioD.
                                                                         ,*.,Ueetion IR,., ..,I display. <urrentl~ v.lid OMS ,"ntml number. the NRC may not l,.'olldt..K.'t llf ."pOMOf. JOO .. perSHfI is not required to re....pond tn. the itUhrmatktn ":tJIItc.'fioD.
FACILITY                                                                                                                                          NRCR.:OION LaSalle County Station, Units 1 and 2                                                                                                    III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2oo8                CY~                                        CY2Q1Q                                  CY2Q.11 ESTIMATED NUMBER OF LICENSEE-PREPARED                      1                        0                                            1                                    0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                      0                                            0                                    0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2oo8                  CY~                                        cy2010                                  CY 2011 NUMBER OF REACTOR OPBRATORS                          4                      0                                            4                                    0 NUMBER OF SENlOR REACTOR OPERATORS-INSTANT                      6                      0                                            8                                    0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                        0                      0                                            2                                    0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED                      0                      0                                            0                                    0 PROPOSED DATES PRIMARY DATE                  811812008                                                        9/14/2010 ALTERNATE DATE                  8125/2008                                                        912112010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~                                                                                Cy    2009 PROPOSED NUMBER        MARCH      JUNE      SEPTEMBER      DECEMBER            MARCH                            JUNE                SEPTEMBER                DECEMBER ESTIMATED NUMBER OF          0          0            0              0                      0                          12                          0                    0 CANDIDATES
FACILITY                                                                                                                                          NRCR.:OION LaSalle County Station, Units 1 and 2                                                                                                    III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2oo8                CY~                                        CY2Q1Q                                  CY2Q.11 ESTIMATED NUMBER OF LICENSEE-PREPARED                      1                        0                                            1                                    0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                      0                                            0                                    0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2oo8                  CY~                                        cy2010                                  CY 2011 NUMBER OF REACTOR OPBRATORS                          4                      0                                            4                                    0 NUMBER OF SENlOR REACTOR OPERATORS-INSTANT                      6                      0                                            8                                    0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                        0                      0                                            2                                    0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED                      0                      0                                            0                                    0 PROPOSED DATES PRIMARY DATE                  811812008                                                        9/14/2010 ALTERNATE DATE                  8125/2008                                                        912112010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~                                                                                Cy    2009 PROPOSED NUMBER        MARCH      JUNE      SEPTEMBER      DECEMBER            MARCH                            JUNE                SEPTEMBER                DECEMBER ESTIMATED NUMBER OF          0          0            0              0                      0                          12                          0                    0 CANDIDATES

Revision as of 18:42, 6 February 2020

2011 Clinton Power Station Initial Examination Miscellaneous Correspondence
ML120260306
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/29/2011
From:
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co, Exelon Nuclear
Shared Package
ML11354A100 List:
References
50-461/11-301
Download: ML120260306 (66)


Text

{{#Wiki_filter:2011 CLINTON POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVillE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 August 17, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacifio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Clinton Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Steven Gackstetter, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of August 29, 2011. The NRC staff will administer the operating tests during the week of August 22,2011. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707. Please contact your Chief Examiner, Mr. Michael E. Bielby at 630-829-9762, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the

M. Pacilio -2 Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ S. Gackstetter, Training Department

M. Pacilio -2 Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httg:Jlwww.nrc.gov/reading-rm/adams.html. Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ S. Gackstetter, Training Department DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource John McHale, NRR Jan R. Kweiser, DRS DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 8_11 Clinton Exam Approval.docx To receive a cop of this document, Indicate In the box "C" :: Copy w/o attach/end "E" :: Copy with attach/enel "N" :: No copy OFFICE Rill: DRS NAME DATE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 4,2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CLINTON POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Pacilio:

In a telephone conversation on January 20, 2011, between Mr. W. Kiser, Exam Lead and Mr. M. Bileby, Chief Examiner, arrangements were made for the administration of licensing examinations at the Clinton Power Station during the weeks of August 22 and August 29, 2011. In addition, the NRC will make an examination validation visit to your facility the week of August 1, 2011. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 16, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by July 11, 2011. Pursuant to Title 10, Section 55.40(b)(3}, of the Code of Federal Regulations (10 CFR 55 ..40(b)(3)}, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

M. Pacilio -2 To permit timely !\IRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 {44 U.S.C. 3501 et seq.}. These information collections were approved by the Office of Management and Budget. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to I!\IFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Kiser has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707. Sincerely, IRA by Bruce Palagi Acting forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ

, M. Pacifio -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Kiser has been advised of the pOlicies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707. Sincerely, IRA by Bruce Palagi Acting forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: CLI 05 11 DRS OL INITIAL EXAM CONFIRMATION.DOCX o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = Copy with attach/encI "N" == N0 copy OFFICE RIII:DRS I RIII:DRS I I I NAME MBielby:co BPalagi for HPeterson DATE 05/4/11 05/4/11 OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Hironori Peterson, dated May 4,2011. SUB..IECT: CLINTON POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak John McHale

Kweiser, Janet From: Burza, Justine Sent: Friday, May 06, 2011 2:30 PM To: Merzke, Daniel; RidsNrrDorlLpl3-2 Resource; RidsNrrPMClinton Resource; RidsNrrDirslrib Resource; Pederson, Cynthia; Orth, Steven; Heck, Jared; Barker, Allan; Ariano, Carole; Linn, Linda; DRSIII; DRPIII; Buckley, Patricia; Tomczak, Tammy; McHale, John

Subject:

Ltr 5/4/11 OL Initial Exam Confirmation Attachments: CLI 050411 DRS OL Initial Exam Confirmation.docx The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word version of the document has been attached and the document has been assigned Accession

  1. ML111260610 Justine. t,BtJ1'ZQ.

Division Administrative Assistant(TL} DRS, Region III 630- 829-9702 1

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-109), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882), Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924), Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6,2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as

 'To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows:

I Station feraidwood I I I 2010 N/R

                                            ~~/~~-***r-****2~/~*-.- r-~~~;        1**       014 2

N/R . Byron 9/27 I N/R 01/16 01114* 0 1/27 Clinton 11/1~ 8/22 N/R 8/19 N/R Dresden 03/08 03/07 3/04 N/R 3105 LaSalle 09113 N/R 09/24 N/R N/R I Quad Cities N/R 5/30 L - - - -. . 3/26 TBD N/R N/R - None Requested TBD - To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

C. Pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ

1...,;. pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OL.doc T ' a Cl!Pl 0f thIs o receIVe . document, indicate in the box "e" = Copy wlo attach/end "En = Copy with attach/end "N" = No C()j))' OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 01125/10 02117/10 02/19/10 OFFICIAL RECORD COpy

letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano linda linn Patricia Buckley Tammy Tomczak

Exelon. Nuclear Clinton Power Station 8401 Power Road Clinton,IL 61727-9351 U-603924 November 18, 2009 Regional Administrator U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Attention: Ms. Janet Kweiser Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Clinton Power Station CY 2011 Operator License Exam Schedule

References:

1) Letter RS-08-092, "Response to NRC Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations," dated July 22, 2008
2) Letter U-603882, "Request for Additional Initial Operator License Training Date,"

dated March 19, 2009

3) Letter RS-09-109, "Response to NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations," dated August 13, 2009 Clinton Power Station previously requested a primary operator license CY 2011 exam schedule date of December 5, 2011, in References 2 and 3. The station has reconsidered operator resource needs, and is now requesting that the 2011 exam date remain at August 22, 2011, as originally requested in Reference 1.

The number of candidates remains the same as reported in the response to Regulatory Issue Summary (RIS) 2009-011. Should you have any questions related to this information, please contact Mr. Steve RuL_ Gackstetter at (217) 937-4000. Mark E. Kanavos Plant Manager Clinton Power Station NOV 2 4 2009

Exelon Generation Company, LLC Clinton Power Station U-603924 Page 2 of 2 EET/blf cc: Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station

Exelon(~ E,elan Nudear 4300 Wmfield Road Nuclear WarrenviHe, ll60 5S5 RS~09~109 August 13,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50454 and STN 50-455 Clinton Power Station, Unit 1 P. V ;l.. () Ji Facility Operating License No. NPF-62 NRC Docket No. 50461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC pocket No. 50-219 Peach Bottom Atomic Power Station. Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NBC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 172009

August 13, 2009 U. S. Nuclear Regulatory Commission Page 2

Subject:

Response to NRC Regulatory Issue Summary 2009*11, "Preparation and Scheduling of Operator licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2009*11, "Preparation and Scheduling of Operator licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009*11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Je Man ger* Licensing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station

  • Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station
  • Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station* Unit 1

Attachment 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..(J131 EXPIRES: 10131/2011 (10*2008) Estimated burden par ras~onsa to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rfardln~ burden estimate to the Records and FOIAlPrlllacy Sefllices Branch -5 F 3), U.S. OPERATOR LICENSING Nuclaar R~ulatory Commission. Washington. DC 20555-000

  • or b7.: internat e-mail 10 in ocoliects@nrC'gov, and to the Desk Offlcer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE 8-10202, (3150-0131), Office of Management and Budget. WaShington, DC 20503. II a means used to impose an information collection does not display a currently valid OMS conlToi number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectIOn.

FACILITY NRC REGION Braidwood Station, Units 1 and Z Facility Operating License Nos. NPF-72 and NPF-77 III NRC Oocket Nos. STN S()..456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2011 Cy 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010 CY 2011 CyZOl2 Cy20JJ PROPOSED NUMBER NUMBER OF REACTOR 0 7 0 5 OPERATORS NUMBER OF SENtOR REACTOR 0 12 0 12 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2 0 2 OPERATORS* UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LlMtTED 0 PROPOSED DATES PRIMARY DATE N/A 0612012011 N/A 03/24/2013 ALTERNATE DATE N/A 07/11/2011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF :u 0 0 0 0 0 0 19 CANDtDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO, 315()..0131 EXPIRES: 1013112011 110-2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments n1r.rding burden estimate to the Records and FOIAIPrivaoy Services Branch *5 F 3). U.S. OPERATOR LICENSING Nuclear R::\lulatory Commission. Washington. DC 20555-000 ,or br, inlemet e*mail to in OCOllec!s@nrc,gov. and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE S*10202. (3150-0131), Office of Management and Budget, Washlng!on, DC 20503. If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection, FACILITY NRC REGION Byron Station, Units t and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2012 PROPOSED NUMBER

                                           -                 Cy 2011 CY 2013 ESTIMATED NUMBER OF L1CENSEE*PREPARED                1                           1                                 I                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                           0                                0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY 2010 CY2011                          CY 2012 Cy2013 NUMBER OF REACTOR                       8                    0                                0                               6 OPERATORS NUMBER OF SENIOR REACTOR                      8                    6                                6                               6 OPERATORS
  • INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 1 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 09/27/2010 09/2612011 09/24/2012 09/23/2013 ALTERNATE DATE N/A 10/0312011 10/0112012 10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED -- -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 6 0 0 0 6 0 0 CANDIDATES NRC fORM 536 (10-2008) PRIN1ED ON RECYCLED PAPER

Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS; NO. 3150-0131 EXPtRES: 08131/2008 ("2005) e.lImaled burden n' re~1IH 10 comply with ifill voluntary Informal ion colle*" request; hour. Ia IIlfOtImtIIon col!edlon ill ulMld to plM ~t. and r8$OUrOH for operator elC8minalion.. Send _ 1 8 ~m~ burGerI OPERATOR LICENSING .aIlm** to 1M Rec:ordtJ and FOINPrivllCY Ser\IIceI Branch *5 F 3). U.S. NuclMt R~UlalOry Comml..ion. W.uhlngton. OC 20555-000

  • or a.ma. to In OCOM~sr' and to the Oalk Olllo:er. 0ftIce 011 ann.1ion
llntemet EXAMINATION DATA and Regul: All'an. Nt: .10202. (315().{J131). 0IIIce of ManaQ8lTl8tlt an d Budget. Wuh gton. OC 20503. If a maa". ulMld to IrI'Ij)OIIe an information collection doe. nol dllplay a <lIImlnlly valid OMS COIlIlol number. the NRC ma y not conduct o~n.or. and a peraon I. nol requited to r**pond 10. the Information col n.

FACIUTY NRCREQION Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 ESTIMATED NUMBER OF LICENsee-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010

                                         -               CY2011
                                                             -                            CY2012 CY2013 NUMBER OF REACTOR                 6 .                 8                                0                                  6 OPERATORS NUMBER OF SENIOR REACTOR                                  4                                 0                                 4 OPERATORS -INSTANT 0

NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* UMfTED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1012512010 12/0512011 N/A 08119/2013 ALTERNATE DATE 1110112010 12/11/2011 N/A 08126/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEfl DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES I'I'tINTED ON RECYCl.EO PAPER

Attachment 4 Response to RIS 2009*11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO. 3150'()131 EXPIRES: 1013112011 (1 (j..2008) Estimated burden per res~onse to comply with tllis voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments re~ardl~ burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear R~ulalory Commission, WaShington. DC 20555-000 ,or b" Internet e-mail to in OCOllects@nrc'gov. and 10 the Desk Officer. Office of in ormation EXAMINATION DATA and Regulatory Affairs, NE B*10202. (3150'()131). Ollice of Management and Budget. Washmgton, DC 20503. if a means used to impose an information collection does not display a currentry valid OMB contro! number. the NRC mey not conduct or sponsor. and a person Is not required to respond to. the information collection. FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50*237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 21)11 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED I I 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2011 CY 2012 CY2013 PROPOSED NUMBER CY 2010 NUMBER OF REACTOR 2 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 9 9 9 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE I 1 1 I NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 03108/2010 03/07/2011 03/0512012 03f04/2013 ALTERNATE DATE 04/05/2010 04104/2011 0410212012 04101/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - - NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) Estimated burden per res~onse to comply with this voluntary inlormation collection request 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments (~arding burden estimate 10 the Records and FOIAlPrlvacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear Com . . . 5*000 ,or by' inlernet e-mail to OfflC9r. Office of In ormation EXAMINATION DATA and Reg 02, (3150-(131), Office of Management and Budget, Wash ogton. DC 20503. If a means uS9d to impose an information collection does not display a currently valid OMS control number, the NRC mey not conduct or sponsor. and a person is not required to respond to, Ihe Information collecllon. fACILITY NRC FlEGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011 CY 20t2 CY 2013 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010

                                               -              CY2011 CY2012 CY2013 NUMBER OF REACTOR                           3                  0                                6                                  0 OPERATORS NUMBER OF SENIOR REACTOR                        11                  0                                8                                  0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                                                              2 OPERATORS-UPGRADE                            0                  0                                                                  0 NUMBER OF SENIOR REACTOR                                             0                                0                                 0 OPERATORS* LIMITED                          0 PROPOSED DATES PRIMARY DATE                  09/14/2010                 N/A                   09/24/2012                                   N/A ALTERNATE DATE                 09/2112010                 N/A                   10/0t/2011                                   N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                   CY 2011 PROPOSED                                  ._                                                        -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF I) 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (1()'2008) PRINTED ON RECYCLED PAPER

Attachment 6 Response to RIS 2009-11 Page 1 of 2 jNR(:FOfUI 531 u.s. NUCU!AR REGULATORY CO* *IION APPROIIEO BY cae NO. 31~131 exPIRES: 1013112011 10.2001)

                                                               &UrnaIIId blwden       t:

ccIIedIDn rIIqLIIIIII: houI.

                                                                                            ~ to ~ 'MIll !ilia wlUIIIMW Infonnadon Infi:IrmIIIIIIn CIGIIec:Ion It IIIIMf to ~ ~
                                                               ....             fat IIf*IIIDr .....Il0l.. Send ~*lLburiMn OPERATOR LICENSING EXAMINATION DATA
                                                               ......... 10 .... AtcionII .... F~ s.mc. a..nc:n .a F ), u.s.
                                                               ~~.. w~oc
                                                               -.II to
                                                               ....  ~~
                                                                                                   ..... III .... DellI 0IIIcIIr. 0III0e all 1Fi(31~31). OIIotalMIII=:.... .
                                                                                                                                            .<<=.=
                                                               ~                              201503.
  • _ uMd III rn..- till Ibol ooIIii::IIOn do-. nat iiIijji8,
  • cumIIIIIy YIIId a.e ~ 1U1IbIr..... HAC III8Y not condu~..,r. 8nd
  • IHIrtOn Ie not requlNd to raapond to. 11M InbmMlon
  • f/IIDUrY HRCMGIOH Umerlck Geaeradill Statio.. U.lta 1 ad 1 Facility Oper_dIIl LkerlseN-. NPF-39'" NPF-85 I NRC Docket Net. 50-35% ad 5O-35l A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CylOI.

Cy2.11 CylOll

                                                                                                   -                                   Cy2.13 UCENSEE-PREPARED                   1                          0                                    I                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPAAED EXAMINATIONS 0                         *                                     *
  • B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER ev 201.

Cy20U ev 1012 Cy2013 NUMBER OF REACTOR OPERATORS

  • 11 0 NUMBER OF SENIOR REACTOR 7 0 5 0 OPERATORS
  • INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 5 0  %

NUMBER OF SENIOR REACTOR OPERATORS* LlMrTED

  • 0 , 0 PROPOSED DATES PRIMARY DATE 10l04ll01. N/A 1000lllOIl N/A AI.TERNATE DATE 1811112.1. N/A 89Jl41lOIl N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY 20U PROPOSED NUMBER MARCH JUNE ISEPTEMBER DECEMBER MARCH JUNE !SEPTEMBER DeCEMBER ESTIMATED NUMBER OF CANDIDATES
                           ,           ,           0         0               0                    16                      It NRC FOI!M _    (1o.:1m1)

Attachment 6 Response to RIS 2009~11 Page 2 of 2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPRoveo BY OMB: NO. 315O.Q131 EXPIRES: 1013112011 (10*2005) Estimated burden per res~onse to comply with this voluntary informatio n collection request 1 hour. his information collection is used to plan budgets and resources for operator examinations. Sand comments ref.rdln~ burden estimale to the Records and FOIAfPrivacy Services Branch -5 F 3). U.S. OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555*000 , or b, Internet e-mail to in OCOlieCtl!@nrc-g0v, and to the Oesk Officer. Office of tn ormatlon EXAMINATION DATA and Regulatory Affairs, NE B*10202, (3150*0131), Office of Management and Budget, WB$htngton. DC 20503. If a means used to Impose an Informaflon collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor. and a person is not requited to respond to, the informatlon coliecUon. FACll-trY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S I NRC Docket Nos. 50~352 and 50-353 A. PROPOSED EXAMINA,.ION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER CY 2011 CY 2012

                                                                                                  -                          CY 2013 ESTIMATED NUMBER OF LICENSEE*PREPARED                    1                         0                                0                               0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                      0                         0                                0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2010            CY2011                          CY 2012                        Cy2013 PROPOSED NUMBER NUMBER OF REACTOR                          0                   0                                0                               0 OPERATORS NUMBER OF SENIOR REACTOR                         0                  0                                0                               0 OPERATORS
  • INSTANT NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 8 PROPOSED DATES PRIMARY DATE 06/1412010 N/A N/A N/A ALTERNATE DATE 0610712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 CY 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (1Cl-2006) PRImED ON RECYCLED PAPER

Attachment 7 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 1013112011 (10*20081 Estimated burden per r... s~onse to comply with this voluntary information collection request 1 hour. his information collection is used to plan budgets and resources lor operator examinations. Send comments re~ardin~ burden estimate to the Records and FOIAIPrivacy Services Branch *5 F 3), U.S. OPERATOR LICENSING Nuclear Re~ulatOry Commission, Washington, DC 20555-000 ,or ~ Internet e-mail to in ocoliecls@nrc,gov, and to the Oesk Officer, Offie" olIn ormation EXAMINATION DATA and RegUlat~ Affairs. NE IM0202, (3150'()131), Office of Management and Budget, Wash ngton, DC 20503. if a means used to impose an information collection does nol display a currently valid OMS conlrol number, the NRC may not conduct or s~onsor, and a person Is not required to respond to, the information collect n. FACILITY NRCREQION Oyster Creek Nuclear Generating Station Renewed Facility OperatiDg License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 PROPOSED NUMBER

                                              -              Cy 2011 CY 20ll                         CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                   1                          1                                 1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                           0                                 0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR                         6                    6                                6                               0 OPERATORS NUMBER OF SENIOR REACTOR                       7                     7                                8                              0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                             1 OPERATORS*UPGRADE                          2                                                     2                               0 NUMBER OF SENIOR REACTOR                                             0                                0                               0 OPERATORS - LIMITED                       0 PROPOSED DATES PRIMARY DATE                 05/17/2010         07lUl2011                     05/2812012                                N/A ALTERNATE DATE                05/24/2010         0711812011                    06/0412012                                N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE Cy 2010                                                     CY 2011 PROPOSED                                 -                                                           -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANOlDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150'()131 EXPIRES: 1013112011 (10-2008) Estimaled burdan per res~onse to comply with this voluntary information collection request: 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments r~ardlng burden estimate to the Records and F01A1PrlllilCY Services Branch -S F 3). U.S. OPERATOR LICENSING Nuclear Re ulatory Commission. Washington. DC 20555*000 . or bl: internet e-mail 10 . re.goll. and to the Desk OffICer, Office of In ormation EXAMINATION DATA and Regulato NE 8*10202. (3150.()131). Omce 01 Mana~ement and Budget. Wa C 20503. II a means used to impose an nformation collection does not display a currently valid OMB controt number. the NRC may not conduct or ~onsor. and a person is not required to respond to. the Information colle on. FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 ( Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010

                                            -                CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                 0                           1                                 0                                 I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                   0                           0                                 0                                0 EXAMINATIONS B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY 2010 Cy2011                          CY2012 Cy2013 NUMBER OF REACTOR                        0                    6                                 0                                8 OPERATORS NUMBER OF SENIOR REACTOR                      0                    8                                 0                              10 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                           3                                 0                                2 OPERATORS-UPGRADE                         0 NUMBER OF SENIOR REACTOR                                           0                                0                                0 OPERATORS* LIMITED
  • PROPOSED DATES PRIMARY DATE
  • 01/31/2011 N/A 0211112013 ALTERNATE DATE
  • 03/2112011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 CY 2011 PROPOSED - <-

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED 0+1 RECYCLED PAPER

       *See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates

Attachment 9 Response to RIS 2009~11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO. 315Q-{)131 EXPIRES: 1013112011 (10-2008) Estimated burden per res~onse to comply wIth this voluntary information collection request: 1 hour. his information collection is llSed to plan budgets and resourCes lor operator examinations. Send comments rer.rdln~ burden estimate to the Records and FOINPrivacy Services Branch *5 F 3). U.S. OPERATOR LICENSING Nuclear Ro?,ulalOry Commission. Washington, DC 20555-000 ,or bt: internet e-mail to in ocollects@nrc'gov, and to Ihe Desk Officer, Office 01 In ormation EXAMINATION DATA and Regulatory Allairs, NE B*l0202, (3150-{)131), Office of Management and Budget. Washington, DC 20503. If a means used to Impop an Information collection does 1'101 display a currently valid OMS conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecllOn. FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR*29 and DPR-30 1II NRC Docket Nos. 50~254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2010 Cy 2011 Cy 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010

                                           -                Cy201t
                                                               -                              CY2012 CY2013 NUMBER OF REACTOR                      0                     6                                  4                               3 OPERATORS NUMBER OF SENIOR REACTOR                     0                   11                                 10                              10 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                        0                     0                                  1                               1 NUMBER OF SENIOR REACTOR                                           0                                  0                               0 OPERATORS* LIMITED                     0 PROPOSED DATES PRIMARY DATE                       N/A        05/30/2011                      03/12/2012                       0411512013 ALTERNATE DATE                      N/A        06113/2011                      03/26/2012                       04/2912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                     CY 2011 PROPOSED                              -                                                              -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM.536 (10-2008) PRINTEO ON RECYCLED PAPER

Attachment 10 Response to RIS 2009-11 Page 1 of 1 NRC FORM S3I u.s. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMB: NO. 31150.0131 EXPIRES: 1013112011 ('(1.2008) E.llmal.ct burnan per /'8'~. 10 comply with thle volunt.ry inform.tlon co/IaCIion Alquest 1 hour. information colectlon it ulMld to pl.ln budgeta and _I0Il1 for op....tor examination.. Send commentll r~~ bll'den OPERATOR LICENSING .IIImalllo the Recorda and FOlAlPrivacy SII~ Branch *5 F 3). U.S. Nuclur R:tory CammllUion, WultlngIDn, DC 20fi65.000 ,Of ~ Internet EXAMINATION DATA IH1'IIlt 10 I "~nrca:' and 10 the 0.. and ReQuta:y, Affalrl NE 0_" omce of 1 10202, (31150.0131), Olb of M&n~1 and allen Sudgtt, Wa ngton, 6C 20503. If a ....ne uNd to Irnpote an ttion coIleCtlon doee not dllpfay a CutnlflU,. VIIIid 0M8 confnll number, the NRC me,. not conduct o~naor, and a paNlcn ia not raqulrad ta r..pond ta. thl Informallon col . FACIUlY NRC REGION Three Mne Island Nuclear Statloll, Unit 1 FacUlty Operadlll License 110. DPR-50 I NRC Docket No. 50..189 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cy 2010

                                              -                Cy lOll Cy2011 cy 2013 I.ICENSEE-PREPARED                  J                           1                                0                                 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                           0                                0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOll CyZOll                             CylO13 NUMBER OF REACTOR                         1                  10                                 0 OPERATORS                                                                                                                  9 NUMBER OF SENIOR REACTOR                         1                  10                                 0                                8 OPERATORS
  • INSTANT NUMBER OF SENfOR REACTOR I 0 OPERATORS - UPGRADE 0 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE OllllllOtO 0911112011 N/A 09/0911013 AtTERNATE DATE 0112812010 09/1911011 N/A 09/1612013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 1011 PROPOSED -~",-- -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ISEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 18 0 0 0 CANDIDATES NRC FORM 538 (lMOOt1) PRINTED QK RECYCLED P""ER

Nuclear Clinton Power Station 8401 Power Road Clinton,lL 61727-9351 U-603882 March 19, 2009 Regional Administrator U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Request for Additional Initial Operator License Training Date

Reference:

Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" The referenced letter provided a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012. Clinton Power Station is requesting an additional class for 6 Reactor Operators be added with an exam date late in 2010. An updated NRC form 536 is included. Should you have any questions related to this information, please contact Mr. Mike McCormic at (217) 937-2526 .

 . A. :iarney Site Vice President Clinton Power Station EET/bif cc:           Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Clinton Power Station MAR 262009

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB; NO. 3150-0131 EXPIRES; 08/3112008 (8-2005) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments rerf'rdlng burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch \ *5 F53). U.S. Nuclear Re~ulalOry Commission, Washington, DC 20555'()()O , Of bllntemet e-mail to in OColiects@nrc-g0v, and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE 8-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503. If a means used to impose an information colledlon does no! display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection. FACIUTV NRC REGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY2012 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 OPERATORS INSTANT 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 08/24/2009 10/25/2010 11/28/2011 N/A ALTERNATE DATE 08/17/2009 11/01/2010 12/05/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED -~~.-- NUMBER SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 0 0 6 0 0 0 10 0 CANDIDATES "IRe FORM 536 (8-2005) PRINTED ON RECVCLED PAPER

October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows: Station 2009 2010 2011 2012 Braidwood 10105 NIR 6/20 NIR Byron NIR I 9/27 9/12 9/10 Clinton 8/24 I N/R 8/22 NIR I Dresden 03/09 i 03/08 3107 3/05 LaSalle N/R 09/13 N/R 9/17 Quad Cities 11/30 N/R 5/30 3/26 N/R - None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronica"y for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 license Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - licensing and Regulatory Affairs Director - licenSing and Regulatory Affairs Manager licensing - Braidwood, Byron and LaSa"e Associate General Counsel Document Control Desk - licensing Assistant Attorney General J. Klinger, State liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station

C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.90v/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T ' a eOPl 0r tb'IS dDeument, ID DreceIVe . d"lcate ID tbe box "C". = COPY wlo attachiencI nE" = Copy WIt. h attac hiencI "N" = No copy OFFICE RIII:DRS I RIII:DRS 1 RIII:DRS J I NAME JKweiser:co DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD COPY

C. Pardee -3 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station B. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Station Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director - Quad Cities Nuclear Power Station

Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: Russell Gibbs Tamara Bloomer Meghan Thorpe~Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRSIII Patricia Buckley Tammy Tomczak

Janet Kweiser From: Carmen Olteanu Sent: Tuesday. October 21. 2008 11 :22 AM To: Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirsirib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak

Subject:

Exelon Letter Re Confirmation of Initial Exam Attachments: Exelon 100708 DRS OLdoc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880559.

1

AmerGen~ An Exelon Company www.exeloncorp.com AmerGcn Energy Company, lLC Nuclear 4300 W'nfield Road Exelon Ceneratlon Warrenville. Il 60555 4300 Wmfleld Road Warrenville. IL 60555 RS-08-092 July 22,2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50*45~ Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NBC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR*19 and DPR-25 _ NRC Docket Nos. 50-237 and 50-249 . , LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF*39 and NPF*85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50=219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR*44 and DPR-S6 NRC Docket Nos. SO-2n and s0-278

July 22, 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010. Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating . examination will be given at Limerick Generating Station (LGS): the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments. the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate. There are no regulatory commitments contatned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Respectfully, .~Yvl~L-Darin M. Benyak Director - Licensing and Regulatory Affairs

July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for laSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2008-16 Attachment 1 Page 1 of 1 II.S NUCLEAR RE(WLATORY COMMISSION APPROVED BY OMB: NO. .1 1S()*tllJ I EXPIRF~~: os/J II~OOIl NRCFORMSJ6 11I-200s) Estimated burden pt'r re~pnn:-;e 1il l."\,lmply with rhi." \'(llulltary mthmuUM:m

                                                                          ;.:uUel.1iun req~: 1 hour. This infmmatl(lQ 'i)I~lion IS u~ to.pl.l0 trudgC'rt~
                                                                          ~~~~~~~h/R~~~d~d~~~~i~~;e:r~i~~B~~rT~I~f):~R."

OPERATOR LICENSING Nudear Ne@ublm)' CttmmIS~I()n. WawtngwIl., DC :!OSS:S~4XX)1, (If b~ Internet

                                                                          ~"mal!     tn IRttl\:ullel.'b@nn""f))v.and to [Itt De-.k OfllCt'"(, O(rk'~ of In ,tmatlln EXAMINATION DATA                                    Jl1d Reg"')' Arr3if~. NE B*IO~O". <3150-0131 i. OtT",. "rM.na¥<ment.OO Budget.. Wa~hlfl~ton. DC 2050J, If 3 me"I1." u~d In Impnr.e an inthrmatKtn
                                                                          \xllfei.:tKJA dn~ not dl~pla)' a I.'urrtnlly valid OMB c<mtrllt number. the NRC may nut I.'nnduet or "pum,ur**md a ptrM.HI is nut reqUlf't"d ttl 1't!'!'{Xlnd to. tht intil(l":II.lflI,X1Uet.:t~m, FACILITY                                                                                                                                        NRC REGION Braidwood Station, Units 1 and 2                                                                                                           III Facility Operating license Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CYgQQ.a                CY 2010                                  CY2011                                  CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                         1                        0                                        1                                      0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                           0                        0                                        0                                      0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY2009                CY2010                                   CY 2011                                  CYgQ1g NUMBER OF REACTOR OPERATORS                             1                       0                                         7                                      0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                        12                       0                                       12                                       0 NUMBER OF SENIOR REAc..1'OR OPERATORS-UPGRADE                         1                        0                                        2                                      0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED                        0                        0                                        0                                      0 PROPOSED DATES PRIMARY DATE                     10/05/2009                  NlA                               612012011                                      NlA ALTERNATE DATE                   10/19/2009                  NlA                                711112011                                      NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2oo9                                                                         CY 2010 PROPOSED NUMBER          MARCH        JUNE        SEPTEMBER      DECEMBER             MARCH                        JUNE                 SEPTEMBER                  DECEMBER ESTIMATED NUMBER OF            0           0               0             0                    21                         0                            0                      0 CANDIDATES

Response to RIS 2008*16 Attachment 2 Page 1 of 1 NRC FORM SJ4 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3151Hl1;l1 EXPIRES: !l!VJlllfXlIi iM*ZOOS) Ehtimated burden ~r re~pon.~ l\) ,,'urnp',)" wIth thi~.vl)luntary In('IOnalitm cilJlet.'tion rr<juef.l: 1 hour. Thl!' mlmmatton (OUtt1101'1 is used to plan budgf't~

                                                                       ;~:ar~~~~rt;e~:!::~);J}OI~{~;~;e~~~~"B:~fi:~iF1~~r~I~S.

OPERATOR LICENSING NlJdear R . . km I EXAMINATION DATA Budget. W;l."hln~wn. DC' ~0503, _. iJISiJ.iJ13I). Oftk. of Managemenl and If a mean!' u-.ed to iml")~ an InformafJon collectiun dt\eS not dl~lilY a cum:ntly \talk! OM.B cnntml number, the NRC may

                                                                       ~~~~(l~~~~.aJJd a person is no! requIred to respond to. the FACILITY                                                                                                                                    NRC REGION Byron Station, Units 1 and 2                                                                                                          III Facility Operating License Nos. NPF*37 and NPF-66 NRC Docket Nos. STN 50*454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDllLE PROPOSED NUMBER                     CY2009                 CY2010                                   CY2011                               CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED                       0                        1                                           1                                 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                         0                        0                                          0                                  0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY2009                 CY 2010                                 CY2011                                CY2012 NUMBER OF REACTOR OPERATORS                          0                        9                                          0                                  7 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                       0                        8                                        12                                   6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                        0                        1                                          1                                 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED                       0                       0                                          0                                  0 PROPOSED DATES PRIMARY DATE                        NlA               9/27/2010                               9/1212011                            9/10/2012 ALTERNATE DATE                       NlA               10/0412010                              9/2612011                             9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXMfiNATION (GFE) SCHEDULE PROPOSED CY2009                                                                          CY2010 NUMBER MARCH       JUNE       SEPTEMBER      DECEMBER            MARCH                         JUNE                 SEPTEMBER               DECEMBER ESTIMATED NUMBER OF          0          17              0             0                    0                          12                        0                       0 CANDIDATES

Response to RIS 2008-16 Attachment 3 Page 1 of 1 NRC fOR.1I1 ~36 U.S NUCLf-AR RE()ULIITORV COMMISSION APPROVED 8Y OMB: NO. JISfl.0131 EXP!RES: O1!l3112(1011

   ,8*20051                                                                    E-.tim31(d t1urden per re<ipHtse '0 (ompl)' with this vt1kJntary information
                                                                               \'"ollt'ctlOn feqtrest: I llJur. Thil'! mfli~ntal)(m ('lIl1et'liUfll:; u~ hlJwan budgets
                                                                               ;~~~~~~~~ft;~!:~~t~1~~81~:~~;~;~~"iir~~~er*r.11~~~rrrg.

OPERATOR LICENSING Nodeolf Re~UlAf4"lry CHmml;'i.sinn. Wa..'dltn~tun. OC ':!055S*000J. or

                                                                               ~,maH ttl bl tnte~r in lcolic.cts@nn:'l)lV. JJld ttl the [k~k ~ftker, Offk."e of tn OrmalKlt'l EXAMINATION DATA                                      and Regulatllry Alf;tir<. NE 8*10202. (3150*1H31). Ollieo,,1 Management and Budget, Washmgtnn. OC ~)503. If a (l'ttans. u~d to Impose .an infotI'Nt *.lft I,.'OllrctKIn dt.le~ not dihplay d t.:urrentJ~ VJhd OMS Cmll!H; number.!he NRC may
                                                                               !It,Il'tmduct or ~p'm~}r.;lI1d 3 person ~ not requIred It) re~p)tJd In. the mfurmaljon ~oI1e\.1ion.

FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating license No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CYgQll CY2012 ESTIMAlED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC* PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8/24/2009 NlA 8/2212011 NlA ALTERNATE DATE 8/17/2009 NlA 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEf'T'EMBER DECEMBER ESTIMAlED NUMBER OF 0 0 0 0 0 9 0 0 CANDIDATES

Response to RIS 2006-16 Attachment 4 Page 1 of 1 NR(: FORM 5.16 u.s NUCLEAR REGtJLATORY COMMISSION IIPPROVED BY 01.18: NO. JISO-fi131 EXPIRES: Olil3I I::WII t8*100!H E1>Clmated burden per re"piJ1l'\e t\) ,,:'ump'y with this v!ll~nlary intbrmiltifln

                                                                         ,nlle\.'tKm reque'-t: 1 htlur. This i.nk)nnatlnn ~l;necli{ln I~ u..t'd h>J,lao bud~el.~
                                                                         ~~~~~~:;:~hetWe~];1~~:;JFbr~~i~~~;S~~~:~Bt~~~ft:~f~t:t.s, OPERATOR LICENSING                                 :-.Judear                            -                       . ~OS55-trol. ,.1' by mtt'f1,tet tHllal) ttl                                                   TIt:'er. Otlke tit Intormaunn EXAMINATION DATA                                 "n" Rtgl                                      .(3150-1)131;, Olliee or MalU~"menl and 8ud~et. Wavllng.wn~ DC ::0503. If J rne;u.'b. used to impu~ an mtbrtnatlun t:ollection doe:r. nf)! dl~play a ,urrently valid OMS I.:Hntrol number. the NRC may nut COOOtKIOf ~(J()~!'t.lr.   ,aoo a person 1-" Ilt)t required 10 respond 10. the infnrmatlOn 1,.'\,n(I,.'lIOO.

FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50*237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER Of LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 6 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 4 10 8 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/09/2009 310812010 3/07/2011 310512012 ALTERNATE DATE 4/06/2009 4/05/2010 4/04/2011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDATES

Response to RIS 2008-16 A"achment 5 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATOR\, COMMISSION APPROVED BY OMB: NO. lJ51)*()131 EXPIRES: OIV311::tKl8

   ,lI-lfHlSI                                                                r:..'lim,l[ed burden per re:-ponse 1,0 \,'umply with Ihi.. voluntary infurmation I.:OUa11Vn reque\l: 1 hour, This l.nh1fTt1a!ton ~IlUtcu()n          I~ usfi1 to plan bud}!tt!i
                                                                            ~::~r~~~l*~t~/::~~~:J~~:~~~~~~~n;:r~~:hefi:1i~f)~~~.

OPERATOR LICENSING ~udelr ~L! Hi-1W')' OlmmisSlon. W.l!o~i!!g:>:.j.~;;'~it:~~~~~;;rl~~)~~~:n EXAADNATION DATA 2, ()15().OIll), OIl",. of M0""G<menl aOO me..ns u~ io Ilnpo~ ,U} infomlatKJn CllU('\.'t K," dl.le\ nnl di:\play a t:urrently. \..~lIid OM8 c'."umml numbt"r, the NRC may not l'Onduct ur spom.nr. Jnd a person is nt)t required fO respond (0, lhe lnformatftm (0I1cI.1ion.

   ~'ACILITY                                                                                                                                             NRC REGION LaSalle County Station, Units 1 and 2                                                                                                           III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED l'I'UMBER                   CY2009                  CY2010                                     CY 2011                                   CY 2012 ESTIMATED NUMBER OF LICENSEE*PREPARED                       0                           1                                            0                                       1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                         0                           0                                            0                                      0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY2009                 CY 2010                                     CY2011                                    cy2012 NUMBER OF REACTOR OPERATORS                           0                           4                                            0                                      4 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT                        0                           8                                           0                                       8 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE                         0                           2                                           0                                      2 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED                        0                          0                                            0                                      0 PROPOSED DATES PRIMARY DATE                        NlA                9/14/2010                                         NlA                                9/1812012 ALTERNATE DATE                       NlA                9/21/2010                                         NlA                                9/25/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009                                                                             Cy        2010 PROPOSED NUMBER           MARCH        JUNE       SEPTEMBER      DECEMBER               MARCH                          JUNE                 SEPTEMBER                   DECEMBER ESTIMATED NUMBER OF             0          12             0               0                     0                            0                            0                         0 CANDIDATES

Response to RIS 2008-16 Attachment 6 Page 1 of 1 NRC FORM 536 U,S NUCLEAR REGl:LATOR't' COMMISSION APPROVED BY OMS: NO. 315il-1lI3 I EXPIRES: ()1V311:!c~

   .M-ZOOSl Eiltimated bordtn ptr re!iXl!tsc t.il Cl}mply with fhi', \I(tluntalj' inftlfmal)On
                                                                            ..1)11t\.1I:OR request: I huur, This mltlfmatKln ,:OH~fltun rs- used in pla1t budgets
~~~~~'fhefll{~~~;:J~8i~:~~~;~~::~'Wr~~t;r;'~i~r~~~.

OPERATOR LICENSING NUi._*~:lr Regulatory Ct}mmis!>.inn. WJ~hlOglOn. DC ~055S-00f)j. Of bl inlemet e-m;ut III jlltu~.:tlllet1~@nrc_f.)V**in<! tlJ the Oe~k. Offi\:er. Otflt:e oi In nflTUlt.iun EXAMINATION DATA and Re~ula",'l' Aff...... NE 8-)0101. /.lI50-IlIJll. Olr",e "r M.n.gemel1l.oo B\<<Ig:e~. Wa.'hJ~tHn. DC :!()SOJ, If a met1~:. usro: UJ Impo~ an mformahnn I.:(lllet:uun ~s ROC display.a currently VJl1d OMS I.'onirol number. lhe NRC' m.;ay nm l'tHK'1UCt or ~'nsur. and a perN.Hl is nOI requIred to J"el'ptJoo fll, the inrormiltl(lIt t.'1.)lleclion. FACILITY Limerick Generating Station, Units 1 and 2 NRC REGION Facility Operating License Nos. NPF*39 and NPF*85 NRC Docket Nos. 50-352 and 5()"353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CYgQ1Q CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED .. 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CYgQQ2 CY2010 CY2011 CY 2012 NUMBER OF REACTOR OPERATORS 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED

                                                       .                           0                                        0                                        0 PROPOSED DATES PRIMARY DATE                           ..               10/04/2010                                       N/A                            10/0812012 ALTERNATE DATE                         1<

10/18/2010 NlA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 CV2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUM8EROF 0 16 0 0 0 0 0 0 CA\lDIDATES

  • See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates

Response to RIS 2008-16 Attachment 7 Page 1 of 1 NRC FORMSJ6 V.s NllClEAR REGULATORY COMMISSION APPROVED BY OMS; NO. J l'O-l11J1 EXPIRES; OHIo II~OOII

   .!I-.lOI151                                                              E.Jima~l"d   burdtn per re~pon~ 101'umply with Ih-h Vtll':lntary jnformnt~)n rol)ecllon request; I tklUf. Thi:i inhlOoatttm cnUection I~ ut~d to.plan budgeTS:

and reS4IUJ\'-el> for operator ~x;lmmalj()ns.. Send ,,'\'mment!'> rffatd)~ ~unko esflmatt tv the Re~:nt¥~ and F9tAIPri\'ocy Ser.... ke' Branch T*.s J)*.u,s, OPERATOR LICENSING IOn EXAMINATION DATA I. Off"," of MfImcnt and Budget. WIL\hmgh'm. IX: 10503. If a. meanl'l u~ to imp()~ an inliltmation

                                                                            ",JIec"," d\>.... 1t di'l'lay a (utremly valid OMB contr(ll number. tho NRC may
~,
~~~~ ~It~~~~. and 3 ~r~)(\ I~ nul requlrW 10 fe.';)nnd h). the FACILITY Oyster Creek Nuclear Generating Station NRC REGION Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CYgQ1Q CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 8 10 0 NUMBER OF SENIOR REACTOR OPERATOR~UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/16/2011 NlA ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 cr2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0 0 16 0 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 8 Page 1 of 1 NRC FORM SJ6 l:.S NUCLEAR REGULATOR\, CO~MISSION APPROVED BY OMB: NO. 3151)*01JI EXPIRES; Oil/31111lO1! IK*Z1J1I51 E"ima~ed ,,"rden per rt:;pnn~ t~ l'(lmply with Ihi;\. .'o'"Jumary lntixmJttun cnliet:tlon requt!\!;; I hour, 11m. j.nfo~matlon cl,)ile\.1kIH t;\ u~d ruplan budgeu

                                                                            ;~~~~~[~~f~r:!:~~~~~:e;c:es~;k~~Br~~h~t~'~f~~:r~,

OPERATOR LICENSING Nudear ReiliJattlryCt)mmis..itm. Wa.. . hinglun. OC' ~nS55~0t10L IIf hLltlttmer e*mail tl) in OCOlltct~@'nn:.:bw. and 1\) the ~k Offk:'er. Otlke of)n rmatlOn EXAMINATION DATA and R<gul..,,'Y Mr.rrs, NE B*101O: IJISO*11I311,Olfoce "f M.nagemelU and Budget. Wil..\-hm~lon. DC ~(}S03. If a lJleill\.'\ uo;ed 10 Imp.Hc ~n infurmatiun C(lUet..-1tOndoes not dj~lay a currently valtd OMS t:UI'IUnlllUmmr. the- NRC may lll~ l.*ond~t or . . po~r. 3nd a per",)!) l' f'kH rt!qulrtd to re~pnnd to. the IAtonnatJOn cnllel11()n. FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-S6 NRC Docket Nos. SO-277 and S0-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2OO9 CY2Q1Q CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER I CY2oo9 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 2 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 9 10 0 10 NUMBER OF SENIOR REACfOR OPERATORS-UPGRADE 1 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS*LlMITED 6 0 0 0 PROPOSED DATES 12107/2009 PRIMARY DATE 1210612010 N/A 12103/2012 8/0312009 - lSRO 12114/2009 ALTERNATE DATE 1211312010 NIA 12110/2012 8110/2009 - LSRO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 Cy2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 16 0 0 0 0 0 CANDIDATES

'Response to RIS 2008-16 Attachment 9 Page 1 of 1 NR(, FOR."" S.16 u.s !'IUCLEAR REGlJLATORY COMMISSION APPROVED BY OMB: NO. JJ5c~OlJl EXPIRES: O!V3 WOOl! C~*2tMlS; EMtm~ed t'lurdc'n per re...pm'~ J.lJ comply with !hi:\ yt\!untary lnf,)rmatlJn n)I~'(IIJn req~st: I huur, nu~ mtlt~Jtllm \.1111<<1ittn 1:\ u!'!td 10 plan bud~ef"

                                                                               ~~r:~~:~~hel\{~~:~~(Tr~~:~~< ~nd CUmmenlG rt"ga.~~i~~~~~.

OPERATOR LICENSING ,. ~~!(rl~h~:U~~ EXAMINATION DATA 10202. (J I5t).OI31), Oflic< Rud~e(~ Wll,.hmgtHJl,. DC ::0503. If it me.tn.-.; used tu Impuse.1O Itllhnnanon 0' Managemen! and

                                                                               \.'nllt'..:rion does not dl~l¥y a (':urTcnl1y vahd OMB \."omm! number. (he NRC may flI,li l.."lIOOUt.:1  or "'POfl:o.tlf* .md a person i.... I1l.it required to re~pond 10. lhe informa(itm ~nnt<.'tk>n.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating license Nos. DPR-29 and DPR-30 NRC Docket Nos. 5()'254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 6 0 6 4 NUMBER OF SENIOR REACfOR OPERATORS*INSTANT 10 0 10 10 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 11/30/2009 NlA 512912011 3/1212012 ALTERNATE DATE 12107/2009 NlA 6/1212011 3126/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 16 0 0 0 14 CANDIDATES

Response to RIS 2008*16 Attachment 10 Page 1 of 1 NRC FORM SJt. li.s NUCLEAR REGULATORY COMMISSION APPROVED BY OM8: NO, 3150,0131 EXPIRES, OIV31/2(~ III-ZooSI E.. .nmated hunko per respon~ t,) rompl)" w;'b thi~ voluntary lof\"rmation COife(:110ll reque~:

  • b,Uf. Tht'" Informal.on \."uUecuun i~ usedW plan budgets and fe!I4)Ul\":t~ thr I)peralor t!xJmmaliof)s. Send I.:\lmmtnts .re!;~t~f~r~.

OPERATOR LICENSING ;tl:h)~~~;~ EXAMINATION DATA ). Office HI' M.1nag.emern and 1 impose 1.11'1 inttlfmarK,n t:()lltctM,)n does oot dj~iay a I.:Uffenf 'I. VJIH,! OMB ,,'nolfUl number, the NRC IM~ IlUt . . onduC( or s:pon.~lr. and il per~lO i\ nul required tn re~ptlnd tu.lhe jrttbrmaINm~()lI~'klR. FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2Q12 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/30/2011 N/A ALTERNATE DATE 610112009 NlA 6/06/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 15 0 0 0 CANDIDATES

AmerGen'M Exelon An Exelon Compa.ny www.exeloncorp.com Nuclear AmerGen Energy Company, LLC Exelon Generation 4300 Winfield Road 4300 Winfield Road Warrenville.ll 60555 Warrenllille.ll 60555 RS-07-116 August 13, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF*n NRC Docket Nos. STN 50*456 and STN 5()"457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF*66 NRC Doc;ket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 5()"2~7 and 50=249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom AtomiC Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-2n and 50-278

August 13,2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating license Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating license No. DPR*50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator licensing Examinations," dated July 12, 2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested In operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011. Attachments 1 through 10 provide responses to RIS 2007*17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, 6 candidates are expected to take the dual site limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination Is a dual site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary. The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818. Respectfully, ":t)(t~~~L-Darin M. Benyak Director - Licensing and Regulatory Affairs

August 13, 2007 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form* 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2007*17 Attachment 1 Page 1 of 1 NRCFORM5~ u.s NliCLEAR REGllLATORV COM~fISSION APPROVED SY OMS: NO. 315(~()131 eXPIRES, OKf.l1l100l! IlJ.lGIl5! Esr.imuted burden ~ re.'pon~ tH L,(Jmply with this \'oJunt~IlY information (t)IIe(.'tiull request: I hc)ur. ThIs mfhrYWllfOfl('111lccllun t/\ u~ to plan budgets

                                                                          ~~:a~~~~~hef~~~~I~roi~~:~~ Se::~~:,"Itr~:cm~i~~r.r~~,

OPERATOR LICENSING *DC1OSS5.-(XlOl. (l' bf In,ernet EXAMINATION DATA Budget. W..htngton. DC 10503. If a mean< used.n impuse .n inrnrmatioo ntand

                                                                          ,,>I1<i<1.'. d"., I'Krt di""lay
  • cu~!ltlr valid OMB ""ollul numbe,. tlte NRC ""'Y iri~ll=~~~ ~~t~;n~~~. and a perr_on i." nne requred w re~ukj In, lhe FACILITY NRCllEGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CY201Q CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CYgQQa CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 1 0 6 NUMBER OF SENIOR REACfOR OPERATORS-INSTANT 0 13 0 12 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE 0 1 0 2 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/5/09 4/4/2011 ALTERNATE DATE 10/19109 5116/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cvgQ.QB. CV~

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 14 0 0 0 0 0 18 CANDIDATES

Response to RIS 2007-17 Attachment 2 Page 1 of 1

  ~RCFORMSJ6                        u.s NUCLEAR REGULATORY COMMISSION  APPROVED BY OMS: NO.lI5()*OIJI                                                        EXPIRES: OHIJII::tXJII lH.lOO5)                                                             E~imattd         burden ~r  l't'~ptHll'e to l:t.Jmplr with Ihis.volunt:irY intinmuhoR 1,.\11let.1J(1I1 req~SI: I hour. This i.nthrmutkJlll-'iIIIe<;uun is uf,e(J In .plan budgets
                                                                      *~~~~!~lt~fr-'" ' '

and resuuJ\.-e..., for ope-ralof e"amlnjtio~, Send cflmments refif(hn~ buJ'tkl!n OPERATOR LICENSING .. ~&1i~~~;:;~~r:,~~= EXAMINATION DATA 131 )'. Oflk. "f M,nngemelu .md mean" uMed to Impn.!it an IOfHrmalton valid OMS (nnlllli number. lilt NRC moy

                                                                       ~o~=~t~c~."nd a person is Q\.I required to ~)fl(j ttl, che FACILITY                                                                                                                                         NRC REGION Byron Station, Units 1 and 2                                                                                                                11/

Facility Operating License Nos. NPF*37 and NPF*66 NRC Docket Nos. STN 50*454 and STN 50*455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2.QQ2 CYgQ1Q CY gQ.11 ESTIMATED NUMBER OF L1CENSEE*PREPARED 0 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 Cy 2010 CY2011 NUMBER OF REACTOR OPERATORS 8 0 8 5 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 0 6 7 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE 1 0 1 0 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/1912008 612012010 817/2011 ALTERNATE DATE 512612008 06127/2010 8/14/2011 C. PROPOSED GENERIC FUNDAMENTAlS EXAMINATION (GFE) SCHEDULE CygQQfl CY~ PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 14 0 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 3 Page 1 of 1 NRC FORM 5J6 C.S NUCLEAR REG liLATORY COMMISSION APPROVED BY OMB ~O. 31StI..llJl EXPIRES: OIIl.J 11:l1Oll III-ZlMI5) E~1imat<"d burden ~r fe:oopt'n!iof' lU 4:umply with this vulyntaT}' inf\lrmativn l3)tlet'tk)f\ re~,": 1 bour, ThiS infurmatlon t:ull:e1.:fion IS u:o;ed 10 plan budget~ anU n:~.uun:t~ fur llperatllr examinations, Send estimate ttl the itemols and FOIAlPriv:\cy Se, OPERATOR LICENSING EXAMINATION DATA ~~~~~~~!~f.tt~~:~ c~maU h aoo to the [)eost Oftker. OtfM:e or In ormation 10201. (3I!lt)..tJI31l. Office of Mana~.m'l1I and Budget. WashIng!"** OC 20S0l.lf. means usedOC III impose an inll,,,,,,,,;,,"

                                                                          ,,,1""1;0. du.s ".,. d"play
  • cumntly valid OMS <,,".ml.umber** he NRC may not conduct nr sptmsnr...00 a per!iUn is nnt required to respmd to. the information ~oltectjun.

FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating Ucense No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2009 CYgQlQ CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2OO8 CY2009 CY2010 CYgQ.11 NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8/24/2009 812212011 ALTERNATE DATE 8/17/2009 812912011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2008 cv2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 9 0 0 0 0 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 4 Page 1 of 1 NRC FORM5.!6 l'.S NUCLEAR REGULATORY COMMISSION APPROVED BY OM8, NO. JIsu.flI31 EXPIRES, mll.1I121_)!! I3-ZlMIS) c,;tim;,ted burden pet respc;)l1M:' to cmnply wrth this vulunt.u-y inlhrmattun I.'nUe\.1k)1\ request: I hour, This inthrl'l1OltloR l;oUcction u. used tH pi.1n budgets

'!1~~~~~;;efR'~:;enr~~:Jf~~:~*~~kr:s~~~¥~*~i~~~~~~,

OPERATOR LICENSING Nuclear ~ulatnry Commis;;<<m. Washing!oFl. DC :mSSS~XXU.llr internet bl e~mail to in X.'O:Ib.lsJJnrtEfllV*.md t\) the Dest. Offacer. Oftke of In )fma1tHn EXAMINATION DATA ,,11<1 Re~ulal ..ry Afro;",. N B*IO~()I.ro.()1J I). Offl,'e ofM.l1.Igemen, and Budget. Washmttl0n. DC 10S03. If 3 men",'1 used tu impose an Informatiun t,'oUel:tion dnes not display Ii currenUr vaJid OMB i..\;nnol number. 1M NRC may

                                                                          ~~l;~~~ ~~;:';k~~~' and 3 pentm i~ nnt required to reltplnd to.lhe FACILITY                                                                                                                                        NRC REGION Dresden Nuclear Power Station, Units 2 and 3                                                                                              III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                        CY 2.QOO              CY~                                     CY2Q1Q                                  CY2Qll ESTIMATED NUMBER OF LICENSEE* PREPARED                       1                           1                                       1                                     1 EXAMINATIONS ESTIMATED NUMBER OF                                                                                                                !

NRC*PREPARED 0 0 0 0 EXAMINATrONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY2oo9 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 5 5 4 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 7 5 10 8 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/312008 31912009 21812010 3(7/2011 ALTERNATE DATE 417/2008 41612009 31812010 4/4/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy2oo8 CY~ PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEF'fBMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDA1ES

Response to RIS 2007-17 Attachment 5 Page 1 of 1 NIlC FORM S36 u.s NUCLEAR REGIILATORV COMMISSION APPROVED !IV OMB: NO. .115lJ.OIll EXPIRES: UKIlII:!(X)S llI-lOO5) EstimiUcd bu~n ~r rcsptJnse h. t'OmpJy w~h thif. VtllUnl3ry inform~ti(ln

                                                                       ,:ulkt:t;"Jn rtque~: I huur, This tllfnrmaul.1ft ~;ttne(.1i()n b w.ed to ,;>I;m hudgets and reSoUI\"eS fhr l                         '

tMimllle.o.1Io R OPERATOR LICENSING EXAMINATION DATA and udget~ WashlUlhlll. DC 20.503. Ira mean;~ woed to impose an m(llrInatiofl

                                                                       ,*.,Ueetion IR,., ..,I display. <urrentl~ v.lid OMS ,"ntml number. the NRC may not l,.'olldt..K.'t llf ."pOMOf. JOO .. perSHfI is not required to re....pond tn. the itUhrmatktn ":tJIItc.'fioD.

FACILITY NRCR.:OION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo8 CY~ CY2Q1Q CY2Q.11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY~ cy2010 CY 2011 NUMBER OF REACTOR OPBRATORS 4 0 4 0 NUMBER OF SENlOR REACTOR OPERATORS-INSTANT 6 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 811812008 9/14/2010 ALTERNATE DATE 8125/2008 912112010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~ Cy 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES

Response to R!S 2007-17 Attachment 6 Page 1 of 1 NRCfORMS3(i u.s NUCLEAR R£{JULATORV COMMISSION APPROVED 8Y OMII: NO. 3ISI)~)J31 EXPIRES: OlVJ 1120011 (1I-2IJ05, Estimated burden ~ re~pnnse to c.'vmply widi this voluntary intbrmation

                                                                        !ii!~!ilf~~'
                                                                         ;:;:r:~~~~for ~)per.itt)f tK.. minalk)n~,                              1fJ3!}~~:.

OPERATOR LICENSING ~:;rI~K,:~~ EXAMINATION DATA .nagemem and

                                                                                                         '03. If a mtJns uMd to impose an inthMllatkm (l,lle<:tkln    . not di'Play a currently' valid OMS contOlI number. the NRC IllI1Y not ,,*ondu.:t or sp(l~~or, and ., person to; not rtquftd ttl r~spond to. the inttlrmation (:olJa:flon.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY200a CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

  • 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY~ CY2010 CYgQU NUMBER OF REACTOR OPERATORS 3 0 9 0 NUMBER OF SENIOR REACI'OR OPERATORS*INSTANT 11 0 9 0 NUMBER OF SENIOR REACI'OR OPERATORS*UPGRADE 2 0 1 0 NUMBER OF SENIOR REACI'OR OPERATORS-LIMITED 0
  • 0 0 PROPOSED DATES PRIMARY DATE 10/20/2008
  • 10/04/2010 NlA ALTERNATE DATE 10/27/2008
  • 10/1812010 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~ CY~

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 18 0 0 CANDIDATES

  • See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates

Response to RIS 2007-17 Attachment 7 Page 1 of 1 NRCFORM5J6 u.s NtJCLllAR REGtJLATOR1' COMMISSION APPROVED 8Y OMS; NO, JISO~1I31 EXPIRES; IlllJ3112!Xl!! 18-10115) ESlimlltf'd burden per re,"pol1~ to ~:tlmply with thi.~ vnluntary inillfmatinn 1..'1JUe(tion requ~1: J ~~ur. Thl:\ infu~matltln ;;olleetion i~ UM!:d to .plan budget:.

                                                                            ~~7~i~~~fR~~~t':J~=:;;::~~i~~7t~-hrf*~~'~~:r;:~;,

OPERATOR LICENSING Nut.:lear Rt~UlalUry Cmnmis,SKln. Wll.lihmgtof1. DC .!OSSS*f)OOI. {If blt inremet e~matllfl m ot:'olle(..'ts@nn.*'Csw. and ttl the Desk Otftcer. Office uf In urmatit)n EXAIV1INATION DATA JOO R.~ulill'~ AIr..", NE 8*10202. (31'0,0131). 0111<. ofMl1tmenl;md Bud~el. W"",hmgtol1. DC 1050). If a means used tu impose an JntlJrmat~m L'oUectinn dt~, J\()t di$play a cumntly. vaJid OMB control number. the NRC may liut (oOOUl.1 M !.ponsdr. and a penon is not required to re~'Ind (0. the mt1!Onatk)n t'ollel't~lR. FACILlTV NRC REGION Oyster Creek Generating Station I Facility Operating license No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY~ CY2Q.1Q CY2011 PSTlMATED NUMBER OF LlCENSE&PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY2009 CY 2010 CY2011 NUMBER OF REACTOR OPERATORS 5 6 6 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 10 10 10 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 0 2 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 417/2008 6115/2009 6114/2010 3/14/2011 ALTERNATE DATE 4/1412008 6/2212009 612112010 3/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cvgQQfl CV@Q2 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 16 0 0 16 CANDIDATES

Response to RIS 2007-17 Attachment 8 Page 1 of 1 NRC F'ORMS36 II.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB, NO. )1S(l..OI31 EXPIRES,OlllJII2OIlli C8*1IM1S1 E.... irrusted burden per response to compiy with dlilt voluntllry Intbrm;uion 4,"otb.1ion re<luest~ I htlur. TId:; i,nfu~matK)fl c.'t)ib.:tkJR i:> used to plun budgets

                                                                        ~reM)U S.

OPERATOR LICENSING EXAMINATION DATA .nd R.~ul.'"ry Affai Off",. <>f M._ment iiIId Ilud~"'. Wa,hlnglon. OC 20503. If. mea.... used to imp"'" ** i.ti'l'Ill3t.... cHllt\;ti". <1<"" not display

  • currenll~ vdlid OMB co.tml .... mber. the NRC may nut ;':OOOut.1 nr :"ponSOI\ and a penlon !~ ntlt required 10 respnnd Il). the:

inf,)rmMioo colle\:tion, FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CYgQlQ CY 2011 ESTIMATED NUMBER OF UCENSEE-PREPARED 1 1 and 1 LSRO 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY2010 CY 2011 NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 9 7 10 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 2 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 6 0 0 PROPOSED DATES 1217/2009 PRIMARY DATE 121812008 121612010 7127/2009 . LSRO ALTERNATE DATE 12115/2008 12114/2009 1211312010 C. PROPOSED GENERIC FUNDAMENTAI.S EXAMINATION (GFE) SCHEDULE cv2008 CY~ PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPfEMBER DECEMBER ESTIMATED NUMBER OF 0 0 7 0 0 0 14 0 CANDIDATES

Response to RIS 2007-17 Attachment 9 Page 1 of 1 NRC FORM SJ6 u.s NUCLEAR IU!:GULA TORY COMMISSION APPROVED BY OMB: NO 3151J*OI3I EXPIRES, flll/3l/:!Ol18 (Jl.lOO5) EM:iml1l:ed burden per fe§ponst t~) I.:ompl¥ with th.is 'Iolufllary 'nti.mnllttOn coUec.:tkm requeSI: I hour. Thi~ Inti)rmatlon l..'lJJle\.1ion is used tt) pmn bud~et"

                                                                         ~:a~~::7~tiR~!:~~~~!(j=~,;e::~~~\"Er~~fT~~~r~rtl~~.

OPERATOR LICENSING Nuc~ar R~UlaWry Cl)mmission. Wl;l!.hin~m. DC ]USSS-OOtH. or b~intemet e-malt CQ i Ou)Ife(t.\@llrcEt)w. and ttl the Desk OffK.'Cf. OtflCe \It' III rmatinn EXAMINATION DATA and Regulatn'}' Alfain;. N 8*10:202. (3"0.0131). OffICe uf Management and Bud~t, Wa~mgwn. DC .2()jU3. If il1M1l1l:4 used 10 impnse an m(orfn\lfitm

                                                                         ',Ilia,,,,. does I)ot display
  • currtntl~ valid OMS mntrol number.lbe NRC may flOC ';(lOOlK.1 or !!pUflsnr. aild ;) per!ion i~ nor rt'quired to respund 1lI. the inronml[ion cu11tt.110n.

FACILITY NRCREGJON Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDllLE PROPOSED NUMBER CYgQQa CY2009 CY2010 CY2011 ESTIMATED NUMBER OF UCENSEE*PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2009 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 4 6 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 11 8 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 1 1 0 NUMBER OF SENIOR REACfOR OPERATORS*LlMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1011612009 10/1812010 ALTERNATE DATE 10/2312009 10/25/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2008 CY2.Q.Qi PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPI'EMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 15 0 0 CANDIDATES

Response to RIS 2007-17 Attachment 10 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. ) 1.lQ.QIJ I EXPIRES: 1I1!I3l!:lIKJ8 (11-:1005) Eslim:ued burden ~ I'CSpUR.<if tu l,.'ompll' with thi... voluntary inl\lrmaliun

                                                                        ~~~.~-~

aoo re~.oul\'es thr nperr.foreXamif1iUioM. estimate to the Re(;ord~ aJX! F9tAlPri~ OPERATOR LICENSING sk Oftker. (}jfl(,'f uno Omlor.,n EXAMINATION DATA Bud~C. (.1I50-0I31J. Ollie. ofM....gtmenl and Wl.\$hIR!tttln. DC )JSOl. If a me.an.~ u.;ed to impl)~ ~ Inttl1'lnatiun

                                                                        <ollection dt""   nt~ dj'pl.y a ....""mIX valid OMB .." "lnll .umber. (be NRC may nut l'ondud or spunSl1f. Jnd :l perl'oon i.. n(lf required to respolXi {(l,lht infl~rm.1tioq i..'oll~d:km, FACILITY                                                                                                                                     NRC REGION Three Mile Island Nuclear Station, Unit 1                                                                                              I Facility Operating License No. DPR-SO NRC Docket No. 5()"289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                    CY2oo8                 CY~                                    CY2010                                 CY2Q11 ESTIMATED NUMBER OF LICENSEE-PREPARED                      0                        1                                        0                                    1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                        0                        0                                        0                                   0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                    CY2oo8                CY2OO9                                  CY2010                                 CY2011 NUMBER OF REAcroR OPERATORS                          0                      10                                        0                                    8 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT                      0                       6                                        0                                    8 NUMBER OF SENIOR REACfOR OPERATORS-UPGRADE                       0                       1                                        0                                    1 NUMBER OF SENIOR REACTOR OPERATORS-LIMrrEO                      0                       0                                        0                                   0 PROPOSED DATES PRIMARY DATE                                         5125/2009                                                                     5/30/2011 ALTERNATE DATE                                         611/2009                                                                      61612011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   gQml                                                                    CY~

PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 0 0 0 0 CANDIDATES

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVilLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 June 12, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville,IL 60555

SUBJECT:

CLINTON POWER STATION CONFIRMATION OF INITIAUREQUALIFICATION OPERATOR LICENSE EXAMINATIONS

Dear Mr. Crane:

In a letter dated May 29,2007 (U-60381 0), your staff requested we schedule an initial license operator examination in August 2011. We have tentatively scheduled the requested examination to occur during the weeks of August 22 and August 29,2011. On-site validation of the examination is tentatively scheduled to occur during the week of July 31, 2011. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examination. In the letter your staff indicated they wanted to reserve 2 weeks for the examination. This implies that you will have ten or more applicants taking the license examination. Please inform us if the number of candidates declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination. A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of November 5, 2007. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents

C. Crane -2 Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing* Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois Chairman, Illinois Commerce Commission

C. Crane -2 Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rmladams.html(the Public Electronic Reading Room). Sincerely,

                                                                          /£#-/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 license No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - licensing and Regulatory Affairs Manager licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - licensing Assistant Attorney General Illinois Emergency Management Agency State liaison Officer, State of Illinois Chairman, Illinois Commerce Commission DISTRIBUTION: TEB RAG1 SPS1 RidsNrrDirslrib GEG KGO RML2 SAM9 SRI Clinton CAA1 DRSIII DRPIII PLB1 TXN NLS DOCUMENT NAME: G:\DRS\Work in Progress\CLI 06_07 DRS OLwpd o Publicly Available 0 Non-Publicly Available 0 Sensitive o Non-Sensitive To receive a CODY 0 f this document, Indicate In the concurrence box"C"" Copy without attach/enel "E" " CIlpY with attach/encl " N"=Nocopy OFFICE RIII:DRS IN RIII:DRS j(I J I NAME DMcNeil:co ~ HPeterson ...d.# DATE 0611:l.107 061\ '2.f07 xr OFFICIAL RECORD COPY

AmerG An EXlon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 U-603810 May 29, 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-001 Clinton Power Station Facility Operating License to No. NPF-62 NRC Docket No. 50-461

Subject:

Scheduling of Operator Licensing Examination Clinton Power Station requests approval from the U.S. Nuclear Regulatory Commission (NRC) to schedule Initial License Training (ILT) examination dates during the weeks of August 22 and August 29, 2011 : Because of the site's outage schedule and the timing of when the site brings in operators for class, the site is requesting these exam dates. If you have any questions, please contact A. D. Bailey at (217) 937-4001. Respectfully, B an Hanson Site Vice President Clinton Power Station EETlblf f JUN 5 2001}}