ML19224C362: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/ | {{#Wiki_filter:/ | ||
BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199 | BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199 | ||
: a. cas .v.oon=w. | : a. cas .v.oon=w. | ||
| Line 36: | Line 33: | ||
7ery : uly yours, 2hh [l ['g cc: Director Office of Inspection and Enforc.enen: | 7ery : uly yours, 2hh [l ['g cc: Director Office of Inspection and Enforc.enen: | ||
/_e'K/Gh 0'5 # | /_e'K/Gh 0'5 # | ||
1K Division of Reactor Operatiens Inspection Washington, D. C. 20555 7907020 # ~ | |||
1K | |||
Division of Reactor Operatiens Inspection Washington, D. C. 20555 7907020 # ~ | |||
,, , A? ? &}} | ,, , A? ? &}} | ||
Revision as of 03:09, 2 February 2020
| ML19224C362 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/15/1979 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| FOIA-79-98 79-93, NUDOCS 7907020221 | |
| Download: ML19224C362 (1) | |
Text
/
BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199
- a. cas .v.oon=w.
ac=
NWCLEAS OPCRATIOMs DEPAAT,eCNT May 15, 1979 BECo. Ltr. #79- 93 Mr. Boyce H. Grier Office of Sspection and Enforce =ent Region I U.S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, PA. 19406 License No. DPR-35 Docket No. 50-293 Surelenentarv Resconse to IE Bulletin No. 79-08 Ref. a) Boston Edison Cc=pany letter to Mr. Boyce Grier dated April 25, 1979 titled " Response to II Sulletin 79-08"
Dear Sir:
Boston Edison Co=pany's initial response to II Eulletin 79-08 (Ref. a) included Ite=s 1-10. Ite= 11 was to be addressed in a subsequent letter within 30 days of the date of the Sulletin and is as follows:
Item 11 Propose changes, as required, to those Technical Specifications which cast be = edified as a result of your implementing Ite=s 1-10.
Response
No Technical Specificatien changes were required as a result of imple=enting te=s 1-10. However, certain Station Procedures required modificatica and have been changed accord.ingly.
Should you have any further questions or concerns please do not hesitate to Contact US.
7ery : uly yours, 2hh [l ['g cc: Director Office of Inspection and Enforc.enen:
/_e'K/Gh 0'5 #
1K Division of Reactor Operatiens Inspection Washington, D. C. 20555 7907020 # ~
,, , A? ? &