TENNESSEE VALLEY AUTHORITY Division of Power Production SECONDARY COIITAINMENT LEAK RATE TEST BROWNS FERRY NUCLEAR PLANT UNIT 1 CONDUCTED NOVEMBER 27, 1978 SUBMITTED TO THE UNITED STATES NUCLEAR REGULATORY COMMISSION PURSUANT TO FACILITY OPERATING LICENSE NUMBER DPR-33 790213 0097
        '.
.
TENNESSEE VALLEY AUTHORITY Division of Power Production SECONDARY COIITAINMENT LEAK RATE TEST BROWNS FERRY NUCLEAR PLANT UNIT 1 CONDUCTED NOVEMBER 27, 1978
  ,-
SUBMITTED TO THE UNITED STATES NUCLEAR REGULATORY COMMISSION PURSUANT TO FACILITY OPERATING LICENSE NUMBER DPR-33 790213 0097
..
.


e
e 1.0 - Browns Ferry Nuclear Plant Unit 1 Secondary Cont ainment Leak Rate Test Report 2.0    Purpose This report describes the results and analysis of the test data taken during leak rate testing of the Browns Ferry Nuclear Plant unit 1 secondary containment pursuant to Technical Specification 4. 7.C.1.c before the first refueling outage.            o 3.0    Procedure The attached surveillance instruction (SI), S1 4.7.C-1, outlines the procedures followed during secondary containment Icak rate testing.
    .  .
  .
.
1.0 - Browns Ferry Nuclear Plant Unit 1 Secondary Cont ainment Leak Rate Test Report 2.0    Purpose This report describes the results and analysis of the test data taken during leak rate testing of the Browns Ferry Nuclear Plant unit 1 secondary containment pursuant to Technical Specification 4. 7.C.1.c before the first refueling outage.            o 3.0    Procedure The attached surveillance instruction (SI), S1 4.7.C-1, outlines the procedures followed during secondary containment Icak rate testing.
4.0    Data The attached surveillance instruction data sheets list the following test data:
4.0    Data The attached surveillance instruction data sheets list the following test data:
(1) Standby gas treatment system flow rate: 9,000 scfm (2) Reactor building differential pressures:
(1) Standby gas treatment system flow rate: 9,000 scfm (2) Reactor building differential pressures:
Unit 1 reactor zone: -0.33" H 2O Unit 2 reactor zone: -0.30" H 2O Unit 3 reactor zone: -0.29" H 2O Refueling zone average:  -0.31" H 2O (3) Wind Speed: 3.5 mph (4) Wind direction: southeast 5.0  Analysis and Interpretation Technical Specification 4.7.C.l.c requires that secondary containment capability to maintain 1/4-inch water vacuum under calm (<5 mph) wind conditions with a total system inleakage rate of not more than 12,000 ocfm shall be demonstrated at each refueling outage before refueling.
Unit 1 reactor zone: -0.33" H 2O Unit 2 reactor zone: -0.30" H 2O Unit 3 reactor zone: -0.29" H 2O Refueling zone average:  -0.31" H 2O (3) Wind Speed: 3.5 mph (4) Wind direction: southeast 5.0  Analysis and Interpretation Technical Specification 4.7.C.l.c requires that secondary containment capability to maintain 1/4-inch water vacuum under calm (<5 mph) wind conditions with a total system inleakage rate of not more than 12,000 ocfm shall be demonstrated at each refueling outage before refueling.
sllowing shutdoen of unit 1 on November 27, 1978, the secondary containment for the common refuel zone and the unit reactor zone were leak rate tested.
sllowing shutdoen of unit 1 on November 27, 1978, the secondary containment for the common refuel zone and the unit reactor zone were leak rate tested.
                                                                                        .


      .
    .  .
  .
.
Browns Ferry Nuclear Plant Unit Secondary Containment Leak Rate Test Report (Continued) 5.0 Analysis and Interpretation (continued)
Browns Ferry Nuclear Plant Unit Secondary Containment Leak Rate Test Report (Continued) 5.0 Analysis and Interpretation (continued)
These two zones were isolated from the unit 2 and unit 3 reactor zones.
These two zones were isolated from the unit 2 and unit 3 reactor zones.
Line 47: Line 31:
LFB:SS 1/15/79
LFB:SS 1/15/79


          .    '.
  '
        -
Page 1 BF S14.7.C
Page 1 BF S14.7.C
-
           ~      '
           ~      '
            '
5/11/76
5/11/76
       ,          II 4.7.C  - Secondary Contairment
       ,          II 4.7.C  - Secondary Contairment
(              Descriprinn
(              Descriprinn This curveillance is used to comply with the requirements of portions of technical                -
      .
specification 4.7.C.      The following table lists the requirements satisfied by this instruction Tech. Spec.
This curveillance is used to comply with the requirements of portions of technical                -
    -
specification 4.7.C.      The following table lists the requirements satisfied by this instruction
                          ,
Tech. Spec.
Frequency                      Referenced                    Surveillance Requirements 3            Under v.irlous wind            4.7.C.1.b          Demonstrate the capability of secondary con-conditionn during the                                tainment to maintain - 1/4" water pressure first U-3 operating                                with a system inleakage of not more than cycic                                              12,000 cfm using the Standby Gas Treatment System (SGTS).
Frequency                      Referenced                    Surveillance Requirements 3            Under v.irlous wind            4.7.C.1.b          Demonstrate the capability of secondary con-conditionn during the                                tainment to maintain - 1/4" water pressure first U-3 operating                                with a system inleakage of not more than cycic                                              12,000 cfm using the Standby Gas Treatment System (SGTS).
satisfythisre(q[uirement.fl~4.7.C{1willbeusedto At each refueling out-          4.7.C.I.c          Demonstrate the capability of secondary con-age prior to refueling                              tainment to maintain - 1/4" water pressure with a system inleakage of not more than
satisfythisre(q[uirement.fl~4.7.C{1willbeusedto At each refueling out-          4.7.C.I.c          Demonstrate the capability of secondary con-age prior to refueling                              tainment to maintain - 1/4" water pressure with a system inleakage of not more than
Line 69: Line 43:
Any time the integrity          4.7.C.2              Isolate the affected zone from the other zones of onc zone has been                                and demonstrate secondary containment capabi-(.            viola c cil                                          lity to maintain - 1/4" water pressure under calm wind conditions using the SGTS.
Any time the integrity          4.7.C.2              Isolate the affected zone from the other zones of onc zone has been                                and demonstrate secondary containment capabi-(.            viola c cil                                          lity to maintain - 1/4" water pressure under calm wind conditions using the SGTS.
SI 4.7.C-1 will be used to satisfy the require-ments for the zones.
SI 4.7.C-1 will be used to satisfy the require-ments for the zones.
The reactor building is broken up into four zones, each of which can be isolated independently. These zones are the unit I reactor zone (UlRZ), the unit 2 Reactor zor.e (U212Z), the unit 3 reactor zone (U3RZ), and the refueling zone RFZ) which is
The reactor building is broken up into four zones, each of which can be isolated independently. These zones are the unit I reactor zone (UlRZ), the unit 2 Reactor zor.e (U212Z), the unit 3 reactor zone (U3RZ), and the refueling zone RFZ) which is common to all three units.
* common to all three units.
This surveillance instruction is written to use the SCTS fans A and C, B and C, ur A and B, or.a singic fan to demonstrate th'at at a flow of 5 12,000 cfm the secondary containment zones can be maintain,cd at a ntatic pressure of -1/4" water under calm wind conditions. Manual isolation of a
This surveillance instruction is written to use the SCTS fans A and C, B and C, ur A and B, or.a singic fan to demonstrate
                    .
th'at at a flow of 5 12,000 cfm the secondary containment zones can be maintain,cd at a ntatic pressure of -1/4" water under calm wind conditions. Manual isolation of a
the zoner, ut il be used since it is fast and the steam line tunnel temperature
the zoner, ut il be used since it is fast and the steam line tunnel temperature
(,_          increascu,which may cause a unit trip.
(,_          increascu,which may cause a unit trip.
                       --.        ,.._____.  .._ 2.  .... .. ...._.. ..      .    . --  .    .
                       --.        ,.._____.  .._ 2.  .... .. ...._.. ..      .    . --  .    .
                                                                                                      .      . . . .


        .                                                                                        ,
    ..
.
Page 2 BT SI 4.7.C
Page 2 BT SI 4.7.C
                                                                               //11/76
                                                                               //11/76
                                                                                '
                                                                                '
(      SI 4.7.C - Secondary containment Description (Continued)
(      SI 4.7.C - Secondary containment Description (Continued)
   -    SI 4.7.C-1 will be used to demonstrate secondary containment capability.
   -    SI 4.7.C-1 will be used to demonstrate secondary containment capability.
This is to be accomplished by isolating the secondary containdent for the reactor building or the required zones, starting the standby gas treatment trains, adjust-ing the flow to less than the allowable flow and verifying the static pressure of the tested zone (s) is -1/4" 110    2 or less. This procedure vill normally be used to test the secondary containment capability of the reactor building prior to refueling.
This is to be accomplished by isolating the secondary containdent for the reactor building or the required zones, starting the standby gas treatment trains, adjust-ing the flow to less than the allowable flow and verifying the static pressure of the tested zone (s) is -1/4" 110    2 or less. This procedure vill normally be used to test the secondary containment capability of the reactor building prior to refueling.
_
                              .
(                                .    . - _                  .
(                                .    . - _                  .
                    .
SI 4.7.C-1        testing should bc Ifmited to 30 minutes if at all possible since the main steam line tunnel temperatures may trip an operating unit.
SI 4.7.C-1        testing should bc Ifmited to 30 minutes if at all possible since the main steam line tunnel temperatures may trip an operating unit.
                                                                            .
I i
* I
                                                    .
i
                                                                             "                  4
                                                                             "                  4
(_
(_
                                                                                          ,
                                                                      *
                                                                        *


                .
i Page 3 EF SI 4.7.C      .
* i
      -
Page 3
          .
EF SI 4.7.C      .
l
l
                                 ,                                                              5/11/76 e                                                    -
                                 ,                                                              5/11/76 e                                                    -
{              SI 4.7.C - Secondary containment Capability 0
{              SI 4.7.C - Secondary containment Capability 0
                                                                  .
U J                -
U J                -
                                                                                          .
       -          1. ERPOSE This procedure is used to isolate the zones to be leak tested and to verify s
       -          1. ERPOSE
      '
This procedure is used to isolate the zones to be leak tested and to verify s
secondary containment capability to taaintain -1/4" H 2O with a system in-leakage of f_ 12,000 cfm without actually measuring the in-leakage.
secondary containment capability to taaintain -1/4" H 2O with a system in-leakage of f_ 12,000 cfm without actually measuring the in-leakage.
: 2. REFERENCES
: 2. REFERENCES 2.1 Technical specifications for units 1, 2, and :), Section 4.7.C.
  -
2.1 Technical specifications for units 1, 2, and :), Section 4.7.C.
  "
2.2 The following drawings:
2.2 The following drawings:
r, Number          Revision            Number          Revision 45N614-5          5                47W610-64            15 45N614-6          5                47W610-65            15
r, Number          Revision            Number          Revision 45N614-5          5                47W610-64            15 45N614-6          5                47W610-65            15
[
[
: 3.      PREREQUISITES 3.1 Notify each unit operator and assistant shift engineer such that they a
: 3.      PREREQUISITES 3.1 Notify each unit operator and assistant shift engineer such that they a
may cocznunicate and be aware of the ventilation and SGTS status
may cocznunicate and be aware of the ventilation and SGTS status during this test.
-
l 3.2 Verify that the reactor building ventilation system is in a normal operational status per OI 30.
during this test.
l 3.2 Verify that the reactor building ventilation system is in a normal
                                                                                                                '
operational status per OI 30.
            .
3.3 verify that the SGTS is in standby readiness per OI 65.
3.3 verify that the SGTS is in standby readiness per OI 65.
  .
3.4 Verify that each units' main steam line tunnel temperature is not above 150    F.
3.4 Verify that each units' main steam line tunnel temperature is not above 150    F.
3.5 Verify switch 16A-S34 is net in ORYWELL BYPASS or TORUS BYPASS on 9        each unit or the unit that is to be tested.                                      .
3.5 Verify switch 16A-S34 is net in ORYWELL BYPASS or TORUS BYPASS on 9        each unit or the unit that is to be tested.                                      .
I
I k
                                                                                                          ..
* k
(                                                              .
(                                                              .
                                                                                    -
                                                                                                          ,
                                                                                '
                                                                                  *
              " " "
_--
_ , _ _


  -
Page 4
Page 4
    -
       ,                                                                                BF SI 4.7.C 5/11/76 SI 4.7.C-1        Secon<!ary Containcient Capability r.
       ,                                                                                BF SI 4.7.C 5/11/76 SI 4.7.C-1        Secon<!ary Containcient Capability r.
C        3. PREREQUISITES (Continued)
C        3. PREREQUISITES (Continued)
   .            3.6 Station a man at the Reactor Building 480V Vent Board in case any breakers m                      need to be reset during this test, and in the SCTS building to adjust manual dampers.
   .            3.6 Station a man at the Reactor Building 480V Vent Board in case any breakers m                      need to be reset during this test, and in the SCTS building to adjust manual dampers.
3.7 set up communication between panel 9-25-1 and 9-25-2 and the following panels:                25-219-1 25-215-2 25-215-3 25-213-1 25-213-2 25-213-3 3.8 Verify the following process instruments to be withir. a current calibration period.          F1-65-50              1-PdIC-64-2 FI-65-71            2-PdIC-64-2
3.7 set up communication between panel 9-25-1 and 9-25-2 and the following panels:                25-219-1 25-215-2 25-215-3 25-213-1 25-213-2 25-213-3 3.8 Verify the following process instruments to be withir. a current calibration period.          F1-65-50              1-PdIC-64-2 FI-65-71            2-PdIC-64-2 1-PdIC-64-1            3-PdIC-64-2 2-PdIC-64-1 3-PdIC-64-1                      ,
                                      -
1-PdIC-64-1            3-PdIC-64-2 2-PdIC-64-1 3-PdIC-64-1                      ,
39 verify the inboard equipment access lock doors closed v8              seals inflated.
39 verify the inboard equipment access lock doors closed v8              seals inflated.
(            3.10 Verify that a drywell or suppression chamber purge '-          . : in process or planned during this test.
(            3.10 Verify that a drywell or suppression chamber purge '-          . : in process or planned during this test.
Line 166: Line 91:
I            provide another means for ventilating the main steam line tunnel to              -
I            provide another means for ventilating the main steam line tunnel to              -
             !          prevent a unit trip (trip point is 1860 F).
             !          prevent a unit trip (trip point is 1860 F).
                                                                                                    ..
4.2 Attempt to restrict testing time to 30 minutes.
4.2 Attempt to restrict testing time to 30 minutes.
                                                            -
s 5.0 _ LittITATIONS AND ACTT03
s 5.0 _ LittITATIONS AND ACTT03
('              5.1      None                                                                      .
('              5.1      None                                                                      .
                                                                          *
                                                                              ,
s
s
                . . . .


  *
.                    .                                                                                          ;
.                    .                                                                                          ;
S
S Page 5 BF SI 4.7.C 5/11/76 SI 4.7.C Secondary containtnent Capabilities                                e
*
: 6.      PROCF' DURE 6.1    Initial and perform the indicated sections on the configuration to be tested on Data Shtet SI 4.7.C-1 and perform steps indicated below.                                              ,
* Page 5 BF SI 4.7.C
    *
      .
                                                                                                                *
                          ,
5/11/76 SI 4.7.C Secondary containtnent Capabilities                                e
: 6.      PROCF' DURE 6.1    Initial and perform the indicated sections on the configuration to
              .
be tested on Data Shtet SI 4.7.C-1 and perform steps indicated
                  -
below.                                              ,
6.1.1 U1RZ - Perform section 6.2 and section 6.4.
6.1.1 U1RZ - Perform section 6.2 and section 6.4.
6.1.2      U2RZ - Perform section 6.2 and section 6.4.
6.1.2      U2RZ - Perform section 6.2 and section 6.4.
Line 200: Line 108:
6.1.8    Reactor Building - Perfom section 6.2 for each RZ, and section 6.3 for the RFZ and section 6.4.                                        :
6.1.8    Reactor Building - Perfom section 6.2 for each RZ, and section 6.3 for the RFZ and section 6.4.                                        :
(              6.2 Manual Isolation of a Reactor Zone NOTE:      MS-64-117, HS-64-120, HU 64-119, & HS-64-122 are spring. return to normal.
(              6.2 Manual Isolation of a Reactor Zone NOTE:      MS-64-117, HS-64-120, HU 64-119, & HS-64-122 are spring. return to normal.
6.2.1    Place HS-64-117 (Panel 9-25) in the TEST position for the reactor zone to be isolated.        (Inboardand common valves) 6.2.2      Place HS-64-120 (Panel 9-25) in the TEST position for the reactor zone to be isolated.      (Outboard valves)                          i 6.2.3      Start SCTS trains A and B in accordance with OI 65 and verify
6.2.1    Place HS-64-117 (Panel 9-25) in the TEST position for the reactor zone to be isolated.        (Inboardand common valves) 6.2.2      Place HS-64-120 (Panel 9-25) in the TEST position for the reactor zone to be isolated.      (Outboard valves)                          i 6.2.3      Start SCTS trains A and B in accordance with OI 65 and verify actions and/or take data as indicated on Data Sheet SI 4.7.C-1                l for the reactor zone that is being isolated.
                                                                                                              !
actions and/or take data as indicated on Data Sheet SI 4.7.C-1                l for the reactor zone that is being isolated.
NOTE: If a reactor zone is the only zone to be isolated,              .
NOTE: If a reactor zone is the only zone to be isolated,              .
                                                                                                         ,  l go to Section 6.4 and if the refuel zone is to be              ~
                                                                                                         ,  l go to Section 6.4 and if the refuel zone is to be              ~
                                                                                                              ,
             '                              isolated complete Section 6.3 before going to                    l Section 6.4.                                                      l
             '                              isolated complete Section 6.3 before going to                    l Section 6.4.                                                      l
             !                                                                                              l
             !                                                                                              l
Line 211: Line 116:
6.3 Manual Isolation of the Plant Refueling Zone                                              ,
6.3 Manual Isolation of the Plant Refueling Zone                                              ,
6.3.1      Place HS-64-119 (Panci 9-25-1) in the TEST position. (Inboard and common valves)
6.3.1      Place HS-64-119 (Panci 9-25-1) in the TEST position. (Inboard and common valves)
                                                                                  .
           = = - = * - - , .        .........w,-..e=====-                  ..                " * *
           = = - = * - - , .        .........w,-..e=====-                  ..                " * *


    .          .
   -          -                                                                              Pace 6 BF SI 4.7.C
      *        *
.
   -          -                                                                              Pace 6
        .
BF SI 4.7.C
                                                                                   ,        8/4/77 SI 4.7.C Se condary containment Capabt11 tics
                                                                                   ,        8/4/77 SI 4.7.C Se condary containment Capabt11 tics
                                                                                                      .
: 6. PROCEntfrE (Continued) 6*3 Manual Isolation of the Plant Refueling 2one (Continued) 6.3.2      Place 11S-64-122 (Panci 9-25-1) in the TEST positio s.                  )
: 6. PROCEntfrE (Continued) 6*3 Manual Isolation of the Plant Refueling 2one (Continued) 6.3.2      Place 11S-64-122 (Panci 9-25-1) in the TEST positio s.                  )
                                  '
                                                                                                             ,i
                                                                                                             ,i
                                     '(Outboard valves)                                                    ,
                                     '(Outboard valves)                                                    ,
6.3.3      Start SGTS trains A and B, if not aircady runniig, in accordance
6.3.3      Start SGTS trains A and B, if not aircady runniig, in accordance with 0165 and verify actions and/or take data as indicated on Data Sheet SI 4.7.C-1 for the refuelir, zone,                        a i
* with 0165 and verify actions and/or take data as indicated on Data Sheet SI 4.7.C-1 for the refuelir, zone,                        a i
6.4 Secondary Containment Capability                                                          i l
6.4 Secondary Containment Capability                                                          i l
NOTE: This ccction is to serify that the secondary containment l'
NOTE: This ccction is to serify that the secondary containment l'
1s capable of ciaintaining a -1/4" !(20 with a system inleakage of< 12,000 cfm for the entire reactor building,
1s capable of ciaintaining a -1/4" !(20 with a system inleakage of< 12,000 cfm for the entire reactor building,
                                                              ,
                                                    -
                                                                                      -
                                                                                                                !
                                                .                  :
* 6.4.1        Adjest the total flots indicated on FI-65-50 and FI-65 71 (panel 9-25-2) to 11,500 cfm er as allowable by -losing a f
* 6.4.1        Adjest the total flots indicated on FI-65-50 and FI-65 71 (panel 9-25-2) to 11,500 cfm er as allowable by -losing a f
SGTS f an discharge damper or if two fans are running it may a
SGTS f an discharge damper or if two fans are running it may a
be necessary to shut one fan of f.
be necessary to shut one fan of f.
* 110Tr.; Let the flow stabilize for 5 minutes before the next ::tep.
* 110Tr.; Let the flow stabilize for 5 minutes before the next ::tep.
                  -
6.4.2 Eccord flows indicated on FI-65-50 and F1-65-71 (panci 9-25-2) and total on Data Sheet SI 4.7.C-1.
6.4.2 Eccord flows indicated on FI-65-50 and F1-65-71 (panci 9-25-2) and total on Data Sheet SI 4.7.C-1.
                                          ,
6.4.3      Record the following static pressures.
6.4.3      Record the following static pressures.
                                             \
                                             \
Zone        Instrument      Panci                            .
Zone        Instrument      Panci                            .
UlRZ        1-PdIC-64-2      1-25-213 U2RZ        2-PdIC-64-2      2-25-213 U3RZ        3-PdIC-64-2      3-25-213 UlRFZ        1- Pd 1C 1 1-25-219 U2RFZ        2-PdIC-64-1      2 "5-215 U3RFZ        3-Pd1C-64-1      3-25-215 6.4.4      verify all four zones static pressures arc e, -1/4" 110.2
UlRZ        1-PdIC-64-2      1-25-213 U2RZ        2-PdIC-64-2      2-25-213 U3RZ        3-PdIC-64-2      3-25-213 UlRFZ        1- Pd 1C 1 1-25-219 U2RFZ        2-PdIC-64-1      2 "5-215 U3RFZ        3-Pd1C-64-1      3-25-215 6.4.4      verify all four zones static pressures arc e, -1/4" 110.2
                                                  !
                 '14 v i r. I e,.i
                 '14 v i r. I e,.i
()                                        ,
()                                        ,


              .
t Page 7
* t Page 7
   ,        .                                                                                        BF SI 4.7.C        j 8/4/77            :
   ,        .                                                                                        BF SI 4.7.C        j
SI 4.7.C Secondary contain. ment Capabilitics I
* 8/4/77            :
* SI 4.7.C Secondary contain. ment Capabilitics I
: 6. PnocatTE (Continued) 6.4 secondary containment capability (Continued)
: 6. PnocatTE (Continued) 6.4 secondary containment capability (Continued)
~'
~'
                  ,
6.4.5 Record the wind direction and velocity from XR-90-102 (panct 9-14-1)
6.4.5 Record the wind direction and velocity from XR-90-102 (panct 9-14-1)
NorC: If 11 four zones static pressurcs are d -1/4" 112
NorC: If 11 four zones static pressurcs are d -1/4" 112 0 this
                                                                          '
* wi i satisfy 4.7.C.1.b and c. If one or more zones do not meet t. -1/4" H2O static pressure requirements the
0 this
* wi i satisfy 4.7.C.1.b and c. If one or more zones do
                                                                                                                          !
not meet t. -1/4" H2O static pressure requirements the
                                                         ~
                                                         ~
                           -                following .tcps must be completed.                                        .
                           -                following .tcps must be completed.                                        .
NUTE: Check to assurc reactor building is isolated.
NUTE: Check to assurc reactor building is isolated.
                                                                                                                          .
6.4.6 Adjust the total flow    '
6.4.6 Adjust the total flow    '
4, f ,
4, f ,
indicated on 71-65-50 and FI-65-71 (pal 9-25-2)
indicated on 71-65-50 and FI-65-71 (pal 9-25-2) to 12,000 cfm by opening the fan dischargo damper or it may be necessary to start another fan end adjust its discharge damper.
                                              ,, ,  .
to 12,000 cfm by opening the fan dischargo damper or it may be necessary to start another fan end adjust its discharge damper.
                .
* NLfE: Le ; the flow stabilize for 5 minutes before the next stop.
* NLfE: Le ; the flow stabilize for 5 minutes before the next stop.
Record flows indicated on FI-65-50 and FI-65-71 (pn1 9-25-2) and total on Data Sheet El 4.7.C-1.
Record flows indicated on FI-65-50 and FI-65-71 (pn1 9-25-2) and total on Data Sheet El 4.7.C-1.
Line 284: Line 161:
                                       - U1RZ                A-PdIC-64-2          1-25-213 U2RZ            2-PdIC-64-2            2-25-213 fU3RZ                3'-PdIC-64 2          3-25-213 UIRFZ            1-PdIC-64 1          1-25-219 l' U2RFZ                2-PdIC-64 1          2-25-215 I      U3RFZ            3-PdIC-64 1          3-25-215 6.4.8    Verify all four zoncs static pressures are $ -1/4" !! 20.
                                       - U1RZ                A-PdIC-64-2          1-25-213 U2RZ            2-PdIC-64-2            2-25-213 fU3RZ                3'-PdIC-64 2          3-25-213 UIRFZ            1-PdIC-64 1          1-25-219 l' U2RFZ                2-PdIC-64 1          2-25-215 I      U3RFZ            3-PdIC-64 1          3-25-215 6.4.8    Verify all four zoncs static pressures are $ -1/4" !! 20.
N o i:: If all four zones static pre .sures arc < -1/4" H 2O this will satis fy 4.7.C.1.b and c.              af one or more zones do
N o i:: If all four zones static pre .sures arc < -1/4" H 2O this will satis fy 4.7.C.1.b and c.              af one or more zones do
                                      ,
* not meet    the      -1/4" 110 2
* not meet    the      -1/4" 110 2
static pressure  requirement the
static pressure  requirement the following steps must be coap'.cted.
      ,
6.4.9    1solate the zone (s) tha: have a st atic pressure of > -1/4" !!20 from the remaining zoncs and indicate zones isolated on Data Sheet SI 4.7.C-1.
following steps must be coap'.cted.
6.4.9    1solate the zone (s) tha: have a st atic pressure of > -1/4" !!20 from the remaining zoncs and indicate zones isolated on
                                                                                                                    .
Data Sheet SI 4.7.C-1.
6.4.10 Adjust the total flow indicated on F1-65-50 and FI-65-71 (pn1 9 W ?)
6.4.10 Adjust the total flow indicated on F1-65-50 and FI-65-71 (pn1 9 W ?)
to the Allouable Flow of the remaining .ones.                    See Appenlix A for tl.c Allowable Finws.
to the Allouable Flow of the remaining .ones.                    See Appenlix A for tl.c Allowable Finws.
* iwv i . n.n
* iwv i . n.n y .- . ..d(
                    .
y .- . ..d(
                                      .
                                                                                                        ..-      -


  .
Page 8
Page 8
    ... .
         '                                                                                  BF SI 4.7.C 5/11/76 SI 4.7.C Secondary Containment capabilities t'
         '                                                                                  BF SI 4.7.C 5/11/76 SI 4.7.C Secondary Containment capabilities
,
t'
: 6.      PROCEDURE _ (Continued)
: 6.      PROCEDURE _ (Continued)
\                  6.4 Secondary Containment Capability (Continued)
\                  6.4 Secondary Containment Capability (Continued)
Line 318: Line 182:
6.4.14 Check those switches that were put in the TEST position under sections 6.2 and/or 6.3 in their NORMAL position and verify on Data Sheet SI 4.7.C-1.
6.4.14 Check those switches that were put in the TEST position under sections 6.2 and/or 6.3 in their NORMAL position and verify on Data Sheet SI 4.7.C-1.
6.4.15 Verify on Data Sheet SI 4.7.C-1 those actions listed under RETURN TO NORMAL for the zones tested.                            .
6.4.15 Verify on Data Sheet SI 4.7.C-1 those actions listed under RETURN TO NORMAL for the zones tested.                            .
                                                                                          .
9 0
9
                                                                                                        .
0
              - - . . . . .


          .
                                                                                                        .
          #
e Page 9 BF S1 4.7.C l
e Page 9 BF S1 4.7.C l
   '~l*                                                                                                g
   '~l*                                                                                                g
                                                                             .      8/4/77              :
                                                                             .      8/4/77              :
                                                                                .
                                                                          -
Appendix A Secondary Containment 1.cak Rate Test Criterla During preoperational testing for unit 3 the following in-1cakage rates at
Appendix A Secondary Containment 1.cak Rate Test Criterla During preoperational testing for unit 3 the following in-1cakage rates at
       -1/41'il 0    static pressure were documented.
       -1/41'il 0    static pressure were documented.
Line 342: Line 197:
total of the allowable inicakage for cach individual zone as indicated below.
total of the allowable inicakage for cach individual zone as indicated below.
i I
i I
                                                                              '
j        ,
j        ,
The technical specifications require the total secondary containment inicakage I
The technical specifications require the total secondary containment inicakage I
Line 348: Line 202:
secondary containment has been violated.                                            ,,
secondary containment has been violated.                                            ,,
7.one                            A11ovabic Inleakac.c Common refuel floor                  .
7.one                            A11ovabic Inleakac.c Common refuel floor                  .
* 7680 Unit i reacto zone                                      15'24 Unit 2 reactor'*.one                                    1308 Unit 3 reactor zone                                    14n8 Ecactor 1:u11 ding
* 7680 Unit i reacto zone                                      15'24 Unit 2 reactor'*.one                                    1308 Unit 3 reactor zone                                    14n8 Ecactor 1:u11 ding g            12000 Cn!
                                                                                                '
g            12000 Cn!
                                        ,
f
f
('                            1
('                            1
           *ltevi n ion            -k              .
           *ltevi n ion            -k              .
                       ---(;                                                                          ,
                       ---(;                                                                          ,
                              .
                                                                . . . .                          .


                                                                                    -
                                                                        .
                                                      . . . .  . . . .
                   .g.  .    . ....    .    .
                   .g.  .    . ....    .    .
  .<. .
BF $T)4.7.C 5/J.1/76 DATA COVER SilEET SI 4.7.C-1
  .
BF $T)4.7.C 5/J.1/76
                    -
DATA COVER SilEET SI 4.7.C-1
[86 SECONDARY C0dTAINMENT CAPABILITY JOW UNIT h 2 OR 3 Performed By                        ~
[86 SECONDARY C0dTAINMENT CAPABILITY JOW UNIT h 2 OR 3 Performed By                        ~
                                                     #7_                    Date      // 2 Un      perpt es          No Were criteria satisf' ed?
                                                     #7_                    Date      // 2 Un      perpt es          No Were criteria satisf' ed?
Line 373: Line 215:
(                                                                                                      remarks)
(                                                                                                      remarks)
[
[
                                      ,
No (explain in remarks)
No (explain in
                ,
remarks)
                                                                                   , Date D                          Verified by Shift Engineer Reason for test:
                                                                                   , Date D                          Verified by Shift Engineer Reason for test:
Maintenance complete on
Maintenance complete on
Line 383: Line 222:
                     /
                     /
lant condition (explain)-              h6      F5/FL/ M,c-W-!
lant condition (explain)-              h6      F5/FL/ M,c-W-!
                                          .
Other (explain)
Other (explain)
Results reviewed                      I///      //r, -        Date      //- 2 7- N dssist[ ant Shif t Engineer Results Revicu and Aporoyd
Results reviewed                      I///      //r, -        Date      //- 2 7- N dssist[ ant Shif t Engineer Results Revicu and Aporoyd
                                                     /      [4/                Date
                                                     /      [4/                Date o"
* o" (1, Cognizant Engineer                                                              '~
(1, Cognizant Engineer                                                              '~
W        "
W        "
l          Rescheduled ld M                              .Date _ lE -l~ ]Cf QA Staff _
l          Rescheduled ld M                              .Date _ lE -l~ ]Cf QA Staff _
Line 393: Line 231:
I I
I I
(1) Notify Maintenance that inle- kage is excessive if criteria are not satis fied.                -
(1) Notify Maintenance that inle- kage is excessive if criteria are not satis fied.                -
                                                                                                        .
t a
t a


                            ...
      .
Page 11
Page 11
~1 ' .                                                                        BF SI 4.7.C
~1 ' .                                                                        BF SI 4.7.C 5/11/',6 1                                Data Stsect SI 4.7.C-1  (Continued)
              -
5/11/',6 1                                Data Stsect SI 4.7.C-1  (Continued)
                                      ,
I      g      Component / Process Variabic Verify and/or Record Initials /Date Normal                                  //d2 3.2    Rx. Bldg. Ventilation System Standby Readiness                    //-[/-2[
I      g      Component / Process Variabic Verify and/or Record Initials /Date Normal                                  //d2 3.2    Rx. Bldg. Ventilation System Standby Readiness                    //-[/-2[
3.3    SGTS
3.3    SGTS
                                                                                               '/-3 2-7f 3.4    Main Steam Line Tunnel Temperaturc        $ 150' F                  yg for units being tested Not in Drywell or 3.5      16A-S34 for units tested                Torus Bypass                .    // D 7 Currently Calibrated                < / 27-)I 3.8      FI-65-50 Currently Calibrated                /l 27-7
                                                                                               '/-3 2-7f 3.4    Main Steam Line Tunnel Temperaturc        $ 150' F                  yg for units being tested Not in Drywell or 3.5      16A-S34 for units tested                Torus Bypass                .    // D 7 Currently Calibrated                < / 27-)I 3.8      FI-65-50 Currently Calibrated                /l 27-7 FI-65-71 Currently Calibrated              //-)'7-      -
  .
FI-65-71 Currently Calibrated              //-)'7-      -
PdIC-64-1 (All three units)
PdIC-64-1 (All three units)
Currently Calibrated              //r27-7I PdIC-64-2 (All three units)                                        //                  /
Currently Calibrated              //r27-7I PdIC-64-2 (All three units)                                        //                  /
O                                                        Closed and Seals 3.9    Inboard Equipment Access Lock Doors Inflated                    . [//-MM Purge Not Inprocess              [/47-2 3.10  Drywell or Suppression Chamber 3.11  Doors in the following table for the                                                _,/
O                                                        Closed and Seals 3.9    Inboard Equipment Access Lock Doors Inflated                    . [//-MM Purge Not Inprocess              [/47-2 3.10  Drywell or Suppression Chamber 3.11  Doors in the following table for the                                                _,/
tested zone (s) or the number doors      Closed hD/) [[",27 /d for all zones.
tested zone (s) or the number doors      Closed hD/) [[",27 /d for all zones.
                                                                            -
ff/
ff/
g i
g i
I                                                                  .
I                                                                  .
I                                                                        !
I                                                                        !
l
l I                                                  .
                                                                                -
1 1                                                                            ,
                                                                        -
 
                                                            -
l    !
                                          ..
I                                                  .
            -
1
                                                                      .
                                                  .
                                                                      .
                                                                    .
1                                                                            ,
                                                                                              -
* l    !
       ..                                                                                Page 12 BF SI 4.7.C            !    ,
       ..                                                                                Page 12 BF SI 4.7.C            !    ,
                '                                                                                                '
Table 3.11                            5/11/76 Data Sheet SI 4.7.C-2    (continued)
Table 3.11                            5/11/76
U3RZ                    RFz U1RZ              U2RZ Elevation i~                                        34,    36          40 519.0            30 t                                          35, 37            41 j                          31                                                                                  !
                                                                                                                .
                            .
Data Sheet SI 4.7.C-2    (continued)
U3RZ                    RFz U1RZ              U2RZ Elevation
    '
i~                                        34,    36          40 519.0            30 t                                          35, 37            41 j                          31                                                                                  !
                                                                                                                  -
_
                                                                                                                  !
43, 44            45 541.5            42
43, 44            45 541.5            42
                                                               # 249                255
                                                               # 249                255
Line 449: Line 258:
                                                               #250                  242
                                                               #250                  242
                               # 231        # 237
                               # 231        # 237
                        *
                                                               #251                  226 224        # 238 255                231
  ,
                                                               #251                  226 224        # 238
  .
255                231
                               # 229          240
                               # 229          240
  .
   -                            # 228          242
   -                            # 228          242
                                          *
   *                            #232
   *                            #232
  .
                               #230 r'                          #230a L.
                               #230 r'                          #230a L.
                                                                 # $26, # 827
                                                                 # $26, # 827
             . 583.0            # 298
             . 583.0            # 298 497, 501          506 593.0          #538
  '
497, 501          506 593.0          #538
                                             # 540              # 513
                                             # 540              # 513
                                 # 539
                                 # 539
                                               #541              # 514 490
                                               #541              # 514 490 640, 647          651 621.25          # 534
  .
640, 647          651 621.25          # 534
                                               #648              d'457
                                               #648              d'457
                                 #637
                                 #637 635      #649                #458 672                675 6'9.0            670
                                                                                                -
635      #649                #458 672                675 6'9.0            670
* 673                                                        _
* 673                                                        _
700, 702, 724, 715, 713
700, 702, 724, 715, 713 713    717        724    715 664.0        704      700 725  716          701, 703, 725, 716, 714 705      701    714 722    7 17        704, 720, 722, 706, 717 712    715 706 g, m, m, 70e, m 71e                  723 20,
          -_
713    717        724    715 664.0        704      700 725  716          701, 703, 725, 716, 714
'
705      701    714 722    7 17        704, 720, 722, 706, 717 712    715 706 g, m, m, 70e, m
                                                                                  -
71e                  723 20,
:                                      ,,,
_ _


      ''
   -                                                                            Page 13 BF SI 4.7.C DATA SIEET SI 4.7.C-1    (Continued)      5/11/76 Step    Component / Process Variable            Verify and/or Record Initials /Date 6.1.1  U1RZ          Configuration                                          ,@
   -                                                                            Page 13 BF SI 4.7.C
    '
                ,
DATA SIEET SI 4.7.C-1    (Continued)      5/11/76 Step    Component / Process Variable            Verify and/or Record Initials /Date 6.1.1  U1RZ          Configuration                                          ,@
6.1.2  U2RZ          Configuratioa 6.1.3  U3RZ          Configuration 6.1.4  RFZ            Configuration                                          Mb 6.1.5  U1RZ a J RFZ Configuration                                                /[37 7[
6.1.2  U2RZ          Configuratioa 6.1.3  U3RZ          Configuration 6.1.4  RFZ            Configuration                                          Mb 6.1.5  U1RZ a J RFZ Configuration                                                /[37 7[
0                                                                                  10/d 6.1.6  U2RZ and RFZ Configuration 6.1.7  U3RZ and RFZ Configuration                                            M 6.1.8  Reactor Building Configuration                                        N D,
0                                                                                  10/d 6.1.6  U2RZ and RFZ Configuration 6.1.7  U3RZ and RFZ Configuration                                            M 6.1.8  Reactor Building Configuration                                        N D,
6.2.1  1-15 117,                            TEST Position                    //-27-7[
6.2.1  1-15 117,                            TEST Position                    //-27-7[
2-15-64-117                              TEST Position
2-15-64-117                              TEST Position N
* N p                3-15 117                            TEST Position              14 6.2.2  1-HS-64-120                              TEST Position                  //-27 75/
p                3-15 117                            TEST Position              14 6.2.2  1-HS-64-120                              TEST Position                  //-27 75/
                                                                                   !V Q                2-1G-64-120                              TEST Position              dN 3-15 120                            TEST Position  -
                                                                                   !V Q                2-1G-64-120                              TEST Position              dN 3-15 120                            TEST Position  -
M 6.2.3  SGTS Train A                            START or SGTS Train B                          START                    C      / / "M-8 or SGTS Train C                          START                  7 J'AN
M 6.2.3  SGTS Train A                            START or SGTS Train B                          START                    C      / / "M-8 or SGTS Train C                          START                  7 J'AN Unit 1 Reactor Zone U-1 Reactor Zone Ventilation Sys.        Shutdown                          //,27 Id 1-FCO-64-13                              Closed              -
                                                            .
Unit 1 Reactor Zone U-1 Reactor Zone Ventilation Sys.        Shutdown                          //,27 Id 1-FCO-64-13                              Closed              -
                                                                                           //-2 7-N 1-Fco-64-14                              Closed                    h //~27-7f.
                                                                                           //-2 7-N 1-Fco-64-14                              Closed                    h //~27-7f.
W/[ //-A7-N
W/[ //-A7-N 1-FCo-64-42                              Closed 1-FCO-64-43                              Closed                    vl///-M-Y l          -
                                                                            '
1-FCo-64-42                              Closed 1-FCO-64-43                              Closed                    vl///-M-Y l          -
                                                .
                                                                      .
u9 l                                                                    l                  .
u9 l                                                                    l                  .
s
s


                                                                                                              . . . , , , , , . .
                                                                                .      ...
_
              -
                         .4 . ...        .. a.r    . . . ,  . . . .                                                                  .
                         .4 . ...        .. a.r    . . . ,  . . . .                                                                  .
l
l Page 14 BF SI 4.7.C
        .
Page 14 BF SI 4.7.C
                           .                                                                        5/11/76
                           .                                                                        5/11/76
   '                                          Data. Sheet S1 4.7.C-1          ' Continued) b A Verify and/or Record Initials /Date_                            ,
   '                                          Data. Sheet S1 4.7.C-1          ' Continued) b A Verify and/or Record Initials /Date_                            ,
Line 521: Line 293:
Open
Open
                                                                                                                           //J7-$
                                                                                                                           //J7-$
1-FCO-64-15 Open                                        // 27 78
1-FCO-64-15 Open                                        // 27 78 1-FCO-64-40                                                                  v y Open                        M                //-17 76 1-FCO-64-41 Closed                              /7 / /-17 7f I l-FCO-64-60A
  '
* 1-FCO-64-40                                                                  v y
  ,
Open                        M                //-17 76 1-FCO-64-41 Closed                              /7 / /-17 7f I l-FCO-64-60A
                                                                                                                               ,i 27 77
                                                                                                                               ,i 27 77
* Closed
* Closed
Line 534: Line 302:
1-FCO-64-60D Shutdown
1-FCO-64-60D Shutdown
                                                                                                                             //-2 7-7[
                                                                                                                             //-2 7-7[
  -
U-1 Stair Hall Supply Fan
U-1 Stair Hall Supply Fan
                                                       -                                                ,y
                                                       -                                                ,y Unit 2 Reactor Zone U-2 Reactor Zone Ventilation Sys                Shutdown                                M f
                                                                                                    -
    .
Unit 2 Reactor Zone U-2 Reactor Zone Ventilation Sys                Shutdown                                M f
Closed
Closed
           .                2-FCO-64-13 Closed 2-FCo-64-14
           .                2-FCO-64-13 Closed 2-FCo-64-14 Closed 2-FCO-64-42 Closed 2-FCo-64-43 Open 2-FCO-64-15 Open 2-FCO-64-40 Open                                    W 2-FCO-64-41 Unit 3 Reactor Zone Shutdown
                                                                                                  -
                                                                                                                       /M U-3 Reactor Zone Ventilation Sys Closed i              -
Closed 2-FCO-64-42 Closed 2-FCo-64-43 Open 2-FCO-64-15 Open 2-FCO-64-40 Open                                    W 2-FCO-64-41 Unit 3 Reactor Zone
3-FCO-64-13 3-FCO-64-14 Closed 3
,
f Closed I                      3-FCo-64-42                                -
Shutdown
                                                                                                *
                                                                                                                       /M U-3 Reactor Zone Ventilation Sys
_
                                                                                                          -
Closed i              -
3-FCO-64-13 3-FCO-64-14
                                                          .-
Closed 3
f
                                                              .
Closed I                      3-FCo-64-42                                -
                                                                                                                                        ,
Closed                      _
Closed                      _
3-FCO-64-43                                                    .
3-FCO-64-43                                                    .
I                      3-FCO-64-15
I                      3-FCO-64-15 Open Open      ,
* Open
__
Open      ,
3-FCO-64-40 s
3-FCO-64-40 s


g        '
g        '
              -
Page 15 BF SI 4.7.C Data saeet SI 4.7.C-1 (Continued)      5/11/76 Step        Component / Process Variable            Verify and/or Record Initials /Date 6.2.3    (Continued)
Page 15
        ,      .
BF SI 4.7.C
          '                -
Data saeet SI 4.7.C-1 (Continued)      5/11/76 Step        Component / Process Variable            Verify and/or Record Initials /Date 6.2.3    (Continued)
Unit 3 Reactor Zone (Continued) 3-FCO-64-41                            Open                        M
Unit 3 Reactor Zone (Continued) 3-FCO-64-41                            Open                        M
                             -FCO-64-60A                          Closed 3-FCO-64-60B                            Closed 3-FCo-64-60C                            Closed
                             -FCO-64-60A                          Closed 3-FCO-64-60B                            Closed 3-FCo-64-60C                            Closed
                      .
   "                                                              Closed 3-FCO-64-60D I                                                                                            j,
   "                                                              Closed 3-FCO-64-60D I                                                                                            j,
                         ' U-3 Stair Hall Supply Fan
                         ' U-3 Stair Hall Supply Fan
                                           ~
                                           ~
Shutdown                    \V r          6.3.1      1-HS-64-119                            TEST Position        (_M&      //-27 ?I 6.3.2      1-HS-64-122                            TEST Position                  //-177d
Shutdown                    \V r          6.3.1      1-HS-64-119                            TEST Position        (_M&      //-27 ?I 6.3.2      1-HS-64-122                            TEST Position                  //-177d If 6.3.3      SGTS Train A                            START or SGTS Train B                        START                            //-)7-7f I                                                                                    / cf L                      or SGTS Train C                        START                      'M T                      Refueling Zone U-1 Area Refueling Zone Vent Sys        Shutdown                          //~')7 78 G
  .                                      .
If
  .
6.3.3      SGTS Train A                            START
                  '
or SGTS Train B                        START                            //-)7-7f I                                                                                    / cf L                      or SGTS Train C                        START                      'M T                      Refueling Zone U-1 Area Refueling Zone Vent Sys        Shutdown                          //~')7 78 G
Shutdown
Shutdown
['
['
g                      U-2 Area Refueling Zone Vent Sys                                        / /-17 -7T U-3 Area Refueling Zone Vent Sys        Shutdown                      /I-37-7 1-FCO'-64-6                            Close                        //-)737 2-FCO-64-6                              Close                        //J7 77 3-FCO-64-6                              e'ose                        //-.27 7I h                      1-FCO-64-5                              Close                        //-7~/7[
g                      U-2 Area Refueling Zone Vent Sys                                        / /-17 -7T U-3 Area Refueling Zone Vent Sys        Shutdown                      /I-37-7 1-FCO'-64-6                            Close                        //-)737 2-FCO-64-6                              Close                        //J7 77 3-FCO-64-6                              e'ose                        //-.27 7I h                      1-FCO-64-5                              Close                        //-7~/7[
2-FCO-64-5                              Close                        //-277/l 3-FCO-64-5                .-          Close                        / I-27-7[
2-FCO-64-5                              Close                        //-277/l 3-FCO-64-5                .-          Close                        / I-27-7[
1-FCO-64-10                            Close                        //-d7 7Y
1-FCO-64-10                            Close                        //-d7 7Y 2-FCO-64-10                            Close                        //-O-7 3-FCO-64-10                            Close                        //-2)-7[I ep
                                                        '
2-FCO-64-10                            Close                        //-O-7 3-FCO-64-10                            Close                        //-2)-7[I ep
                    -
;
;
'I i
'I i
                                                    '
                                                                            .
                                                                                                  .
    '
_                                                                                          _


              ,
or at .....
or at .....
5/2/78
5/2/78
Line 610: Line 337:
                 -            1-FCO-64-9
                 -            1-FCO-64-9
: 7. nan Close                          W      //-17 7I f      / / _27 ) $
: 7. nan Close                          W      //-17 7I f      / / _27 ) $
Close 2-l'CO-64-9
Close 2-l'CO-64-9 Close                                  //-377[
                  .
3-PCO-64-9 n.2 ~7 7 f Open l-FCO-64-63 Open
Close                                  //-377[
3-PCO-64-9 n.2 ~7 7 f Open l-FCO-64-63
                      '
      ,
Open
                                                                                                                       //-27-8 1-FCO-64-7 Close                                  //-)7-78
                                                                                                                       //-27-8 1-FCO-64-7 Close                                  //-)7-78
* 1-FCo-64-65A
* 1-FCo-64-65A
                                                                                 ~
                                                                                 ~
                                                                                                                       // ~27-
                                                                                                                       // ~27-
* l-FCO-64-65B
* l-FCO-64-65B Clese cio,,
* Clese
      ''                                        ,
                                                                  -
cio,,
                                                                                                                         //M 7[
                                                                                                                         //M 7[
1-FCO-64-65C
1-FCO-64-65C Close
                      ,
Close
                                                                                                                         /IS)")
                                                                                                                         /IS)")
* l-FCO-64-65D                                                  ,
* l-FCO-64-65D                                                  ,
                                                         -                      Open
                                                         -                      Open
                                                                                                                         //47 7[
                                                                                                                         //47 7[
* 1-FCo-64-44
* 1-FCo-64-44 Open
      ,,
                    '
* Open
                                                                                                                       //-?7-7 8 '
                                                                                                                       //-?7-7 8 '
1              - -          FCO 54-45'
1              - -          FCO 54-45' Shutdown                          //J7-7[
            ,
Shutdown                          //J7-7[
Equipment Access Lock Exhaust Fan il Shutdoun
Equipment Access Lock Exhaust Fan il Shutdoun
                                                                                                    *
                                                                                                                       //-D-7 f U-l Stair 11all Supply ran Shutdown
                                                                                                                       //-D-7 f U-l Stair 11all Supply ran Shutdown
                                                                                                                       //-l~7-7 [
                                                                                                                       //-l~7-7 [
          '
                               .U-3 Stair Itall Supply Fan                                                    v i                                                  -
                               .U-3 Stair Itall Supply Fan                                                    v
..                      .
                                                                                  ., -
i                                                  -
                                    .
,.
                                                                                                                              <
                                                                                      -
g i
g i
                                                                                '
    ,
                                                                    -
                                                                                                            .
                                                                                                  .
                                                                                                                           ~ //-)7-7 $
                                                                                                                           ~ //-)7-7 $
                                                                     -                      Md sfem 6.4 2            F1-65-50                                                                                  //-97-7[
                                                                     -                      Md sfem 6.4 2            F1-65-50                                                                                  //-97-7[
                                                                             .            Nond sfem FI-65-71                                                                                [I )] ~]$
                                                                             .            Nond sfem FI-65-71                                                                                [I )] ~]$
h                                                                                    Q bD,D _s[cm Tt1                                    ..  .
h                                                                                    Q bD,D _s[cm Tt1                                    ..  .
                                                                                    -
                                                                                        -
yy g
yy g
                                                                                                          -                    ,
               *Revi::fon                                                                      f II    /                                                              i
                                                                                                .
               *Revi::fon                                                                      f
        ,
II    /                                                              i
:    ~ m:    .v rwr;m.-,[ - .            ., _,
:    ~ m:    .v rwr;m.-,[ - .            ., _,


      .
L'a CC L/
L'a CC L/
            *
BF SI 4.7.C Data Shcot SI 4.7.C-1    (Cont inued)              5/2/78 Step        Component / Process variable                verify .and/or Record Initials /Date 6.43        1-PdIC      Rx Zone                                      _ M "H90                      //-D.76
                '
BF SI 4.7.C
      -
            *
                ,
                      ,
Data Shcot SI 4.7.C-1    (Cont inued)              5/2/78 Step        Component / Process variable                verify .and/or Record Initials /Date 6.43        1-PdIC      Rx Zone                                      _ M "H90                      //-D.76
* Thermometer Rx Zone                                            A4 F O          f/8/])      //-277f 2-PdIC      Rx Zone                                      , To "H 0 g      /h            ,f)yy
* Thermometer Rx Zone                                            A4 F O          f/8/])      //-277f 2-PdIC      Rx Zone                                      , To "H 0 g      /h            ,f)yy
* Thermometer Rx Zonc                                            4'A F            /49Q        L /-217 T 3-PdIC      Rx Zoac                                      ,cN "Hg0 Kyy/A                , f-> > . n D
* Thermometer Rx Zonc                                            4'A F            /49Q        L /-217 T 3-PdIC      Rx Zoac                                      ,cN "Hg0 Kyy/A                , f-> > . n D
Line 695: Line 378:
* 6.4 5        33 ft. level / Windspeed                                  / 6''N.ph                #1 //47Y
* 6.4 5        33 ft. level / Windspeed                                  / 6''N.ph                #1 //47Y
             *6.4.5.1          Thermometer / Outside temp.                                  86 F                        //,.2 7-T 6.4. 6 ,    FI-65-50                                                            scfm              k r                  . FI-65-71                                                            scfm f
             *6.4.5.1          Thermometer / Outside temp.                                  86 F                        //,.2 7-T 6.4. 6 ,    FI-65-50                                                            scfm              k r                  . FI-65-71                                                            scfm f
L    ~.                      Total                                                            scfm i                                              s
L    ~.                      Total                                                            scfm i                                              s Il          6.4. 7        1-PdIC-64-2 Rx Zone                                      t "H2O U
                                                                                    ,
Il          6.4. 7        1-PdIC-64-2 Rx Zone                                      t "H2O U
2-PdIC-64-2 Rx Zone                                                "H 2O 3-PdIC-64-1 Rx Zone                                                "H 2O l-PdIC-64-1 Refueling Zone                                        "H2O 2-PdIC-64-1 Refueling Zot.c                                        "H 2O 3-PdIC-64-1 Refueling Zone                                        "H 2O                            .
2-PdIC-64-2 Rx Zone                                                "H 2O 3-PdIC-64-1 Rx Zone                                                "H 2O l-PdIC-64-1 Refueling Zone                                        "H2O 2-PdIC-64-1 Refueling Zot.c                                        "H 2O 3-PdIC-64-1 Refueling Zone                                        "H 2O                            .
6.4.8        All zones < -1/4"H 2O                                                              \/
6.4.8        All zones < -1/4"H 2O                                                              \/
                                                                                 ~
                                                                                 ~
: 6. 4.9        Zones Isolated                    List              /A
: 6. 4.9        Zones Isolated                    List              /A 44
                          -                -
44
* Revision                                                          [d g
* Revision                                                          [d g
1/ .
1/ .
                                                          -
a                                                    ;
a                                                    ;
_
O                                                                              .
O                                                                              .
* _
                                                                              .                            -
__
           *        -h    e
           *        -h    e


U.    -                                                                                  Page 18
U.    -                                                                                  Page 18 Data Sheet SI 4.7.C-1                              BF SI 4.7.C
          .
         .                                                                                    5/11/76 Step      component / Process variable              verify and/or Record Initials /Date Return to Normal 6.4.11    FI-65-50                                                      scfm FI-65-71                                                      se fm Total                                                      scfm 6.4 J2    1-PdIC-64-2 Rx Zone                                          "H2O 2-PdIC-64-2 Rx Zone                                          "H2O a                  3-PdIC-64-2 Rx Zone                                          "H2O
* Data Sheet SI 4.7.C-1                              BF SI 4.7.C
'
         .                                                                                    5/11/76 Step      component / Process variable              verify and/or Record Initials /Date Return to Normal 6.4.11    FI-65-50                                                      scfm FI-65-71                                                      se fm Total                                                      scfm 6.4 J2    1-PdIC-64-2 Rx Zone                                          "H2O
    ,
2-PdIC-64-2 Rx Zone                                          "H2O a                  3-PdIC-64-2 Rx Zone                                          "H2O
                    '
[                    1-PdIC-64-1 Refueling Zone                                    "H 2O
[                    1-PdIC-64-1 Refueling Zone                                    "H 2O
                       .2-PdIC-64-1 Refueling Zone                                    "H 2O e
                       .2-PdIC-64-1 Refueling Zone                                    "H 2O e
3-PdIC-64-1 Refueling Zone                                    " 112 0 6.4.13      Remaining zones 5 -1/4"1120                                                    \/
3-PdIC-64-1 Refueling Zone                                    " 112 0 6.4.13      Remaining zones 5 -1/4"1120                                                    \/
i 6.4.14    1-HS-64-117                                NORMAL
i 6.4.14    1-HS-64-117                                NORMAL
                                                                                          *
                                                                                                           //-373[[
                                                                                                           //-373[[
r                                                                          .
r                                                                          .
ff hM
ff hM
[                    2-IIS-64-117
[                    2-IIS-64-117 NORMAL
                                                                                                    '
NORMAL
   -                    3-11S-64-117                              NORMAL                              /M 1-IIS-64-120                              NORMAL                                  //iD-h 2-11S-64-120                              NORMAL                              N 3-ils-64-120                                NORMAL                            bh l
   -                    3-11S-64-117                              NORMAL                              /M 1-IIS-64-120                              NORMAL                                  //iD-h 2-11S-64-120                              NORMAL                              N 3-ils-64-120                                NORMAL                            bh l
1-HS-64-119                                NORMAL                                      -N 1-11S-64-122                              NORMAL                                f[~ ~
1-HS-64-119                                NORMAL                                      -N 1-11S-64-122                              NORMAL                                f[~ ~
                                                                                    -
                                                                                    ,
H                                                ..
H                                                ..
                                                                                  -
                    -
g                                                    .
g                                                    .
                                                                                        .
                                                        .
                                                               ~
                                                               ~
:
1                                                          .
1                                                          .
                                                                                .
B                                                                            -
B                                                                            -
                                                                                            ,
'
      -
_.                            - - - _. _          _            _._
                                                                                                                  -


[.-  _
[.-  _
Page 19 BF SI 4.7.C l
Page 19 BF SI 4.7.C l
        -        -
Data Sheet SI 4.7.C-1                    5/11/76 i
Data Sheet SI 4.7.C-1                    5/11/76 i
Step      component / Process Variable            Verify and/or Record Initials /Date Return to Normal 6.4. 15  SGTS Fan A                              0FF                          N FCO-65-3                                Closed
Step      component / Process Variable            Verify and/or Record Initials /Date Return to Normal 6.4. 15  SGTS Fan A                              0FF                          N FCO-65-3                                Closed
Line 765: Line 416:
SGTS Fan B                              0FF                              //d7lf FCO-65-25                                Closed                          // J)-7f B-SGTS humidity control heater          OFF                            / / 97 '2[
SGTS Fan B                              0FF                              //d7lf FCO-65-25                                Closed                          // J)-7f B-SGTS humidity control heater          OFF                            / / 97 '2[
[/ 97-)[
[/ 97-)[
    "
B-SGTS charepal heater                  ON l'  I r                  SGTS Fan C -                            OFF                          V FCO-65-51                                Closed                    [[
B-SGTS charepal heater                  ON l'  I r                  SGTS Fan C -                            OFF                          V
'
FCO-65-51                                Closed                    [[
[                  C-SGTS humidity control heater          OFF                        M C-SGTS charcoal heater                  ON                        N L
[                  C-SGTS humidity control heater          OFF                        M C-SGTS charcoal heater                  ON                        N L
Unit 1 Reactor Zone U-1 Reactor Zone Ventilation System      In operation as required 1-FCO-64-13                              OPEN                              //-M 7[
Unit 1 Reactor Zone U-1 Reactor Zone Ventilation System      In operation as required 1-FCO-64-13                              OPEN                              //-M 7[
Line 781: Line 429:
  ~,
  ~,


    -
         *
         *
* Page 20
* Page 20 BF S1 4.7.C Data Sheet SI 4.7.C-1    (Continued)      5/11/76 1                .
                  .
BF S1 4.7.C
                *
                              ,
Data Sheet SI 4.7.C-1    (Continued)      5/11/76 1                .
Step      Component / Process Variable          ' Verify and/or Record Initicis/Date 6.4 15 (Continued)
Step      Component / Process Variable          ' Verify and/or Record Initicis/Date 6.4 15 (Continued)
Unit 2 Reactor Zone U-2 Reactor Zone Ventilation System      In operation as required
Unit 2 Reactor Zone U-2 Reactor Zone Ventilation System      In operation as required 2-FCO-64-13                              Open 2-FCo-64-14                              open r
                        -
   .                            2-FCO-64-42                              Open r                            2-FCO-64-43                              Open i
2-FCO-64-13                              Open 2-FCo-64-14                              open r
   .                            2-FCO-64-42                              Open
* r                            2-FCO-64-43                              Open i
  '
2-FCO-64-15                              Closed 2-FCO-64-40                              closed 2-FCO-64-41                              Closed                      k/
2-FCO-64-15                              Closed 2-FCO-64-40                              closed 2-FCO-64-41                              Closed                      k/
* I' L
I' L
Unit 3 Reactor Zone ri                          U-3 Reactor Zone Ventilation System      In operation as required 3-FCO-64-13                              Open                        N
Unit 3 Reactor Zone ri                          U-3 Reactor Zone Ventilation System      In operation as required 3-FCO-64-13                              Open                        N
           ~
           ~
J                        3-FCO-64-14                              Open 3-FCo-64-42                              Open                          r 3-FCO-64-43                              Open 3-FCO-64-15                              Closed
J                        3-FCO-64-14                              Open 3-FCo-64-42                              Open                          r 3-FCO-64-43                              Open 3-FCO-64-15                              Closed 3-FCo-64-40                              Closed 3-FCo-64-41                              Closed l
* 3-FCo-64-40                              Closed 3-FCo-64-41                              Closed l
3-FCO-64-60A                            Open                    -
3-FCO-64-60A                            Open                    -
0                                                                  Open 3-FCO-64-60B 3-FCo-64-60C                            Open
0                                                                  Open 3-FCO-64-60B 3-FCo-64-60C                            Open l                              3-FCo-64-6'0D                            Open U-3 Stair 11all Supply Fan              In Operation as Required B                                                                                                    .
                                                          ,,
!                                                                                          '
* l                              3-FCo-64-6'0D                            Open
                                                            ,
U-3 Stair 11all Supply Fan              In Operation as Required B                                                                                                    .
                                                                                    -
O                                                                                            .
O                                                                                            .
            .%.


          ''
Page 21 BF SI 4.7.,C
          '
           '                                      Data Sheet SI 4.7.C-1(Continued)            5/2/78 Component /proccc*: Variabic                  Vet .fy mnd/or itecord Tnitials/n,te Sten 6.4. 15 (Continued)
                    '
Page 21
      .,
BF SI 4.7.,C
           '                                      Data Sheet SI 4.7.C-1(Continued)            5/2/78
                            ,
Component /proccc*: Variabic                  Vet .fy mnd/or itecord Tnitials/n,te Sten 6.4. 15 (Continued)
Itofueling Zone U-l Arca Refueling Zone Vent Sys              In Operation as required
Itofueling Zone U-l Arca Refueling Zone Vent Sys              In Operation as required
    *
                 -          U-2 Area Refueling Zcnc Vent Sys              In Operation as required U-3 Area Refueling Zone Vent Sys              In Operation as required p              .
                 -          U-2 Area Refueling Zcnc Vent Sys              In Operation as required
                                                        '
U-3 Area Refueling Zone Vent Sys              In Operation as required p              .
b                        1-FCO-64-6        .
b                        1-FCO-64-6        .
Open                    N //-27 7f I I f
Open                    N //-27 7f I I f
                      '
2-FCO-64-6                                    Open                      +c      / / 2h?[
2-FCO-64-6                                    Open                      +c      / / 2h?[
3-FCO-05-6                                    Open                    b      / / / @-)['
3-FCO-05-6                                    Open                    b      / / / @-)['
1-FCO-64-5                                  Open                              //_J7J[
1-FCO-64-5                                  Open                              //_J7J[
              .
                                                                                                             //-3)77 2-FCO-64-5
                                                                                                             //-3)77
                                                                                                      '
2-FCO-64-5
* Open r
* Open r
3-FCO-64-5                      -            Open
3-FCO-64-5                      -            Open
                                                                                                        -
                                                                                                               //J7JI Open                                / / -)~/-)/
                                                                                                               //J7JI Open                                / / -)~/-)/
l-FCO-64-10 2-FCo-64-10
l-FCO-64-10 2-FCo-64-10 Open
                                                                      -
Open
                                                                                                           /
                                                                                                           /
                                                                                                               // N /[
                                                                                                               // N /[
Line 850: Line 463:
3-FCo-64-10                                  Open                      en    //W) 7I ~
3-FCo-64-10                                  Open                      en    //W) 7I ~
Open
Open
                                                                                                '
                                                                                                               / / 07 '7[
                                                                                                               / / 07 '7[
1-FCO-64-9                                          .
1-FCO-64-9                                          .
2-FCO-64-9
2-FCO-64-9 Open                              //50-7I 3-FCO-64-9                                  Open                                //J/ 7[
                                                                    '
Open                              //50-7I 3-FCO-64-9                                  Open                                //J/ 7[
                       .      1-FCO-64-63                                Close                                // 7M
                       .      1-FCO-64-63                                Close                                // 7M
                                                                                                                 //-8 Y
                                                                                                                 //-8 Y Close l-FCO-64-7 v      -
            ,
Close l-FCO-64-7 v      -
                         .* 1-FCO-64-65A                        .        Open                      ,        //-27)[
                         .* 1-FCO-64-65A                        .        Open                      ,        //-27)[
* 1-FCo-64-65B
* 1-FCo-64-65B 0 pin                                //. 7.7j/
                                                  '
* l-FCo-64-65C Open                              //-7/ ?[
0 pin                                //. 7.7j/
* l-FCo-64-65C
* Open                              //-7/ ?[
         !                ** l-FCO-64-65D                  -
         !                ** l-FCO-64-65D                  -
Open MS-Y l-FCO-64-44                  -            Cloco                            //-17-I 1-iCO-04-45
Open MS-Y l-FCO-64-44                  -            Cloco                            //-17-I 1-iCO-04-45 Close                            //-7/-7[
                                                            -
Close                            //-7/-7[
03
03
                                                      ,
                                                                         -      .                    vv Equipment Access T.ock Exhaust Fan          In Operation as required 7
                                                                         -      .                    vv Equipment Access T.ock Exhaust Fan          In Operation as required 7
U-1 Stair lla11 supply Fan                    In operation as required U
U-1 Stair lla11 supply Fan                    In operation as required U
U-3 Stair llall Supply Fan
U-3 Stair llall Supply Fan In Operation an required
* In Operation an required
.,}}
.,}}

Revision as of 17:43, 1 February 2020

Results & Analysis of 781127 Secondary Containment Leak Rate Test.Shows Secondary Containment Capability to Main 1/4 Inch Water Vacuum Under Calm Wind W/Sys in Leakage Rate of Not More That 12,000 Scfm Before Refueling
ML19274D552
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/09/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19274D549 List:
References
NUDOCS 7902130097
Download: ML19274D552 (23)


Text

{{#Wiki_filter:. TENNESSEE VALLEY AUTHORITY Division of Power Production SECONDARY COIITAINMENT LEAK RATE TEST BROWNS FERRY NUCLEAR PLANT UNIT 1 CONDUCTED NOVEMBER 27, 1978 SUBMITTED TO THE UNITED STATES NUCLEAR REGULATORY COMMISSION PURSUANT TO FACILITY OPERATING LICENSE NUMBER DPR-33 790213 0097

e 1.0 - Browns Ferry Nuclear Plant Unit 1 Secondary Cont ainment Leak Rate Test Report 2.0 Purpose This report describes the results and analysis of the test data taken during leak rate testing of the Browns Ferry Nuclear Plant unit 1 secondary containment pursuant to Technical Specification 4. 7.C.1.c before the first refueling outage. o 3.0 Procedure The attached surveillance instruction (SI), S1 4.7.C-1, outlines the procedures followed during secondary containment Icak rate testing. 4.0 Data The attached surveillance instruction data sheets list the following test data: (1) Standby gas treatment system flow rate: 9,000 scfm (2) Reactor building differential pressures: Unit 1 reactor zone: -0.33" H 2O Unit 2 reactor zone: -0.30" H 2O Unit 3 reactor zone: -0.29" H 2O Refueling zone average: -0.31" H 2O (3) Wind Speed: 3.5 mph (4) Wind direction: southeast 5.0 Analysis and Interpretation Technical Specification 4.7.C.l.c requires that secondary containment capability to maintain 1/4-inch water vacuum under calm (<5 mph) wind conditions with a total system inleakage rate of not more than 12,000 ocfm shall be demonstrated at each refueling outage before refueling. sllowing shutdoen of unit 1 on November 27, 1978, the secondary containment for the common refuel zone and the unit reactor zone were leak rate tested.

Browns Ferry Nuclear Plant Unit Secondary Containment Leak Rate Test Report (Continued) 5.0 Analysis and Interpretation (continued) These two zones were isolated from the unit 2 and unit 3 reactor zones. Appendix A to S1 4.7.C gives the allowable inleakage per secondary containment zone documented during preoperational testing. Assuming a total allowable inleakage of 12,000 scfm, it is shown in Appendix A that the allowable inlerkage for testing the refuel zone and unit I reactor zone in combination under calm wind conditions is 9,204 scfm. From the data taken during this test, it is shown that, assuming a total combined inleakage of 9,000 scfm in the unit reactor zone and the refuel zone, the secondary containment system is capable of maintaining greater than 0.25 inches of water vacuum. These results fulfill the requirements of Technical Specification 4.7.C l.c. LFB:SS 1/15/79

Page 1 BF S14.7.C

          ~      '

5/11/76

      ,           II 4.7.C  - Secondary Contairment

( Descriprinn This curveillance is used to comply with the requirements of portions of technical - specification 4.7.C. The following table lists the requirements satisfied by this instruction Tech. Spec. Frequency Referenced Surveillance Requirements 3 Under v.irlous wind 4.7.C.1.b Demonstrate the capability of secondary con-conditionn during the tainment to maintain - 1/4" water pressure first U-3 operating with a system inleakage of not more than cycic 12,000 cfm using the Standby Gas Treatment System (SGTS). satisfythisre(q[uirement.fl~4.7.C{1willbeusedto At each refueling out- 4.7.C.I.c Demonstrate the capability of secondary con-age prior to refueling tainment to maintain - 1/4" water pressure with a system inleakage of not more than

                                          .                         12,000 cfm under calm wind conditions < 5 mph.

SI 4.7.C-1 will be used to satisfy this, requirement. Any time the integrity 4.7.C.2 Isolate the affected zone from the other zones of onc zone has been and demonstrate secondary containment capabi-(. viola c cil lity to maintain - 1/4" water pressure under calm wind conditions using the SGTS. SI 4.7.C-1 will be used to satisfy the require-ments for the zones. The reactor building is broken up into four zones, each of which can be isolated independently. These zones are the unit I reactor zone (UlRZ), the unit 2 Reactor zor.e (U212Z), the unit 3 reactor zone (U3RZ), and the refueling zone RFZ) which is common to all three units. This surveillance instruction is written to use the SCTS fans A and C, B and C, ur A and B, or.a singic fan to demonstrate th'at at a flow of 5 12,000 cfm the secondary containment zones can be maintain,cd at a ntatic pressure of -1/4" water under calm wind conditions. Manual isolation of a the zoner, ut il be used since it is fast and the steam line tunnel temperature (,_ increascu,which may cause a unit trip.

                     --.        ,.._____.   .._ 2.  .... .. ...._.. ..       .     . --   .     .

Page 2 BT SI 4.7.C

                                                                              //11/76

( SI 4.7.C - Secondary containment Description (Continued)

  -    SI 4.7.C-1 will be used to demonstrate secondary containment capability.

This is to be accomplished by isolating the secondary containdent for the reactor building or the required zones, starting the standby gas treatment trains, adjust-ing the flow to less than the allowable flow and verifying the static pressure of the tested zone (s) is -1/4" 110 2 or less. This procedure vill normally be used to test the secondary containment capability of the reactor building prior to refueling. ( . . - _ . SI 4.7.C-1 testing should bc Ifmited to 30 minutes if at all possible since the main steam line tunnel temperatures may trip an operating unit. I i

                                                                           "                  4

(_

i Page 3 EF SI 4.7.C . l

                               ,                                                              5/11/76 e                                                    -

{ SI 4.7.C - Secondary containment Capability 0 U J -

     -          1. ERPOSE This procedure is used to isolate the zones to be leak tested and to verify s

secondary containment capability to taaintain -1/4" H 2O with a system in-leakage of f_ 12,000 cfm without actually measuring the in-leakage.

2. REFERENCES 2.1 Technical specifications for units 1, 2, and :), Section 4.7.C.

2.2 The following drawings: r, Number Revision Number Revision 45N614-5 5 47W610-64 15 45N614-6 5 47W610-65 15 [

3. PREREQUISITES 3.1 Notify each unit operator and assistant shift engineer such that they a

may cocznunicate and be aware of the ventilation and SGTS status during this test. l 3.2 Verify that the reactor building ventilation system is in a normal operational status per OI 30. 3.3 verify that the SGTS is in standby readiness per OI 65. 3.4 Verify that each units' main steam line tunnel temperature is not above 150 F. 3.5 Verify switch 16A-S34 is net in ORYWELL BYPASS or TORUS BYPASS on 9 each unit or the unit that is to be tested. . I k ( .

Page 4

      ,                                                                                 BF SI 4.7.C 5/11/76 SI 4.7.C-1        Secon<!ary Containcient Capability r.

C 3. PREREQUISITES (Continued)

  .             3.6 Station a man at the Reactor Building 480V Vent Board in case any breakers m                       need to be reset during this test, and in the SCTS building to adjust manual dampers.

3.7 set up communication between panel 9-25-1 and 9-25-2 and the following panels: 25-219-1 25-215-2 25-215-3 25-213-1 25-213-2 25-213-3 3.8 Verify the following process instruments to be withir. a current calibration period. F1-65-50 1-PdIC-64-2 FI-65-71 2-PdIC-64-2 1-PdIC-64-1 3-PdIC-64-2 2-PdIC-64-1 3-PdIC-64-1 , 39 verify the inboard equipment access lock doors closed v8 seals inflated. ( 3.10 Verify that a drywell or suppression chamber purge '- . : in process or planned during this test. 3.11 Verify on Data Sheet SI 4.7.C-1 that each of the doors are closed for the respective zones to be tested or the doors indicated by number (See Table 3.11 of Data Sacct S14.7.C-1) for all four zones.

4. PRECAUTIONS 4.1 De not allow the main steam line tunnel temperature on any unit in operation to execed 1600 F. If this temperature is approached to within 100 F, stop the test and reestablish normal ventilation per 01 30 or ,

I provide another means for ventilating the main steam line tunnel to -

            !           prevent a unit trip (trip point is 1860 F).

4.2 Attempt to restrict testing time to 30 minutes. s 5.0 _ LittITATIONS AND ACTT03 (' 5.1 None . s

. .  ; S Page 5 BF SI 4.7.C 5/11/76 SI 4.7.C Secondary containtnent Capabilities e

6. PROCF' DURE 6.1 Initial and perform the indicated sections on the configuration to be tested on Data Shtet SI 4.7.C-1 and perform steps indicated below. ,

6.1.1 U1RZ - Perform section 6.2 and section 6.4. 6.1.2 U2RZ - Perform section 6.2 and section 6.4. 6.1.3 U3RZ - Perform section 6.2 and section 6.4. 6.1.4 PS2 - Perform section 6.3 and section 6.4. 6.1.5 U1R2 and RFZ - Perform sections 6.2, 6.3 and section 6.4. 6.1.6 U2RZ and RFZ - Perform sections 6.2, 6.3 and section 6.4. 6.1.7 U3RZ and RFZ - Perfom sections 6.2, 6.3 and section 6.4. 6.1.8 Reactor Building - Perfom section 6.2 for each RZ, and section 6.3 for the RFZ and section 6.4.  : ( 6.2 Manual Isolation of a Reactor Zone NOTE: MS-64-117, HS-64-120, HU 64-119, & HS-64-122 are spring. return to normal. 6.2.1 Place HS-64-117 (Panel 9-25) in the TEST position for the reactor zone to be isolated. (Inboardand common valves) 6.2.2 Place HS-64-120 (Panel 9-25) in the TEST position for the reactor zone to be isolated. (Outboard valves) i 6.2.3 Start SCTS trains A and B in accordance with OI 65 and verify actions and/or take data as indicated on Data Sheet SI 4.7.C-1 l for the reactor zone that is being isolated. NOTE: If a reactor zone is the only zone to be isolated, .

                                                                                                        ,   l go to Section 6.4 and if the refuel zone is to be               ~
           '                               isolated complete Section 6.3 before going to                    l Section 6.4.                                                      l
            !                                                                                               l
                                                                                                     ~'

6.3 Manual Isolation of the Plant Refueling Zone , 6.3.1 Place HS-64-119 (Panci 9-25-1) in the TEST position. (Inboard and common valves)

         = = - = * - - , .         .........w,-..e=====-                   ..                 " * *
 -          -                                                                               Pace 6 BF SI 4.7.C
                                                                                  ,         8/4/77 SI 4.7.C Se condary containment Capabt11 tics
6. PROCEntfrE (Continued) 6*3 Manual Isolation of the Plant Refueling 2one (Continued) 6.3.2 Place 11S-64-122 (Panci 9-25-1) in the TEST positio s. )
                                                                                                            ,i
                                    '(Outboard valves)                                                    ,

6.3.3 Start SGTS trains A and B, if not aircady runniig, in accordance with 0165 and verify actions and/or take data as indicated on Data Sheet SI 4.7.C-1 for the refuelir, zone, a i 6.4 Secondary Containment Capability i l NOTE: This ccction is to serify that the secondary containment l' 1s capable of ciaintaining a -1/4" !(20 with a system inleakage of< 12,000 cfm for the entire reactor building,

  • 6.4.1 Adjest the total flots indicated on FI-65-50 and FI-65 71 (panel 9-25-2) to 11,500 cfm er as allowable by -losing a f

SGTS f an discharge damper or if two fans are running it may a be necessary to shut one fan of f.

  • 110Tr.; Let the flow stabilize for 5 minutes before the next ::tep.

6.4.2 Eccord flows indicated on FI-65-50 and F1-65-71 (panci 9-25-2) and total on Data Sheet SI 4.7.C-1. 6.4.3 Record the following static pressures.

                                            \

Zone Instrument Panci . UlRZ 1-PdIC-64-2 1-25-213 U2RZ 2-PdIC-64-2 2-25-213 U3RZ 3-PdIC-64-2 3-25-213 UlRFZ 1- Pd 1C 1 1-25-219 U2RFZ 2-PdIC-64-1 2 "5-215 U3RFZ 3-Pd1C-64-1 3-25-215 6.4.4 verify all four zones static pressures arc e, -1/4" 110.2

                '14 v i r. I e,.i

() ,

t Page 7

  ,        .                                                                                        BF SI 4.7.C        j 8/4/77             :

SI 4.7.C Secondary contain. ment Capabilitics I

6. PnocatTE (Continued) 6.4 secondary containment capability (Continued)

~' 6.4.5 Record the wind direction and velocity from XR-90-102 (panct 9-14-1) NorC: If 11 four zones static pressurcs are d -1/4" 112 0 this

  • wi i satisfy 4.7.C.1.b and c. If one or more zones do not meet t. -1/4" H2O static pressure requirements the
                                                       ~
                         -                following .tcps must be completed.                                         .

NUTE: Check to assurc reactor building is isolated. 6.4.6 Adjust the total flow ' 4, f , indicated on 71-65-50 and FI-65-71 (pal 9-25-2) to 12,000 cfm by opening the fan dischargo damper or it may be necessary to start another fan end adjust its discharge damper.

  • NLfE: Le ; the flow stabilize for 5 minutes before the next stop.

Record flows indicated on FI-65-50 and FI-65-71 (pn1 9-25-2) and total on Data Sheet El 4.7.C-1. ( 6.4.7 Record the following static pressures.

                                        }

Panel

                                        ' Zone              Initrument
                                      - U1RZ                 A-PdIC-64-2           1-25-213 U2RZ             2-PdIC-64-2            2-25-213 fU3RZ                3'-PdIC-64 2           3-25-213 UIRFZ             1-PdIC-64 1           1-25-219 l' U2RFZ                2-PdIC-64 1           2-25-215 I       U3RFZ             3-PdIC-64 1           3-25-215 6.4.8     Verify all four zoncs static pressures are $ -1/4" !! 20.

N o i:: If all four zones static pre .sures arc < -1/4" H 2O this will satis fy 4.7.C.1.b and c. af one or more zones do

  • not meet the -1/4" 110 2

static pressure requirement the following steps must be coap'.cted. 6.4.9 1solate the zone (s) tha: have a st atic pressure of > -1/4" !!20 from the remaining zoncs and indicate zones isolated on Data Sheet SI 4.7.C-1. 6.4.10 Adjust the total flow indicated on F1-65-50 and FI-65-71 (pn1 9 W ?) to the Allouable Flow of the remaining .ones. See Appenlix A for tl.c Allowable Finws.

  • iwv i . n.n y .- . ..d(

Page 8

        '                                                                                   BF SI 4.7.C 5/11/76 SI 4.7.C Secondary Containment capabilities t'
6. PROCEDURE _ (Continued)

\ 6.4 Secondary Containment Capability (Continued)

  )                        6.4.10 (Continued)

/ . NOTE: Let the flow stablize for 15 minutes before the next step.

                    -      6.4.11 Record flows indicated on FI-65-50 and FI-65-71 (pn1 9-25-2) and total on Data Sheet SI 4.7.C-1.

6.4.12 P 3rd the following static pressures. Zone Instrument Panel U1RZ 1-PdIC-64-2 1-25-213 U2RZ 2-PdIC-64-2 2-25-2L3 U3RZ 3-PdIC-64-2 3-25-2L3 U1RFZ 1-PdIC-64-1 1-25-219 U2RFZ 2-PdIC-64-1 2-25-2L5 U3RFt 3-PdIC-64-1 3-25-215 6.4.13 Verify the remaining zones static pressurec sce < -1/4" H 20. NOTE: If these :enes atatic pressures are 1 -1/4" H2 O this will ( satisfy 4.7.C-2. Maintenance must be performed on the isolated zone and should be indicated on Data Sheet SI 4.7.C-1 cover sheet under Remarks. 6.4.14 Check those switches that were put in the TEST position under sections 6.2 and/or 6.3 in their NORMAL position and verify on Data Sheet SI 4.7.C-1. 6.4.15 Verify on Data Sheet SI 4.7.C-1 those actions listed under RETURN TO NORMAL for the zones tested. . 9 0

e Page 9 BF S1 4.7.C l

  '~l*                                                                                                 g
                                                                           .      8/4/77               :

Appendix A Secondary Containment 1.cak Rate Test Criterla During preoperational testing for unit 3 the following in-1cakage rates at

     -1/41'il 0    static pressure were documented.

y

  • Documented Inicakave Pererntace i Common refuel floor (units 1, 2, & 3) 6250 Later Unit I reactor zone 1239 ,

Unit 2 reactor zone 1064 Unit 3 reactor zone 1211 y 9764 Total secondary containment later Cnf 100% u:ak rate testing will normally be done with all zones simultaneously lined up for testing; however, plant operating conditions and the technical specification do not always permit this. When less than four zones (3-unit plant) are beir;; tested, the total allowabic inicakage will be based on preoperational testing and vill be based i en the sum of the allowable inleakages for the zones being tested. After a ( i secondary containment violation, the total inleakage must not be greater than the I total of the allowable inicakage for cach individual zone as indicated below. i I j , The technical specifications require the total secondary containment inicakage I to bc Icss than 12,000 cfn at -1/6" differential pressure. The following are therefore established for surveillance test various combinations of zones when l' secondary containment has been violated. ,, 7.one A11ovabic Inleakac.c Common refuel floor .

  • 7680 Unit i reacto zone 15'24 Unit 2 reactor'*.one 1308 Unit 3 reactor zone 14n8 Ecactor 1:u11 ding g 12000 Cn!

f (' 1

         *ltevi n ion             -k               .
                      ---(;                                                                          ,
                 .g.  .     . ....     .    .

BF $T)4.7.C 5/J.1/76 DATA COVER SilEET SI 4.7.C-1 [86 SECONDARY C0dTAINMENT CAPABILITY JOW UNIT h 2 OR 3 Performed By ~

                                                    #7_                    Date      // 2 Un       perpt es          No Were criteria satisf' ed?

If no, notify shift engineer. Yes (explain in If no, was a Limiting Condition for Operation violated? ( remarks) [ No (explain in remarks)

                                                                                  , Date D                          Verified by Shift Engineer Reason for test:

Maintenance complete on

                                                                                         ) inoperable Another system (

Rgquired by schedule

                   /

lant condition (explain)- h6 F5/FL/ M,c-W-! Other (explain) Results reviewed I/// //r, - Date //- 2 7- N dssist[ ant Shif t Engineer Results Revicu and Aporoyd

                                                   /      [4/                Date o"

(1, Cognizant Engineer '~ W " l Rescheduled ld M .Date _ lE -l~ ]Cf QA Staff _ REauu:s . I I (1) Notify Maintenance that inle- kage is excessive if criteria are not satis fied. - t a

Page 11 ~1 ' . BF SI 4.7.C 5/11/',6 1 Data Stsect SI 4.7.C-1 (Continued) I g Component / Process Variabic Verify and/or Record Initials /Date Normal //d2 3.2 Rx. Bldg. Ventilation System Standby Readiness //-[/-2[ 3.3 SGTS

                                                                                              '/-3 2-7f 3.4    Main Steam Line Tunnel Temperaturc         $ 150' F                  yg for units being tested Not in Drywell or 3.5      16A-S34 for units tested                 Torus Bypass                .     // D 7 Currently Calibrated                 < / 27-)I 3.8      FI-65-50 Currently Calibrated                /l 27-7 FI-65-71 Currently Calibrated               //-)'7-       -

PdIC-64-1 (All three units) Currently Calibrated //r27-7I PdIC-64-2 (All three units) // / O Closed and Seals 3.9 Inboard Equipment Access Lock Doors Inflated . [//-MM Purge Not Inprocess [/47-2 3.10 Drywell or Suppression Chamber 3.11 Doors in the following table for the _,/ tested zone (s) or the number doors Closed hD/) [[",27 /d for all zones. ff/ g i I . I  ! l I . 1 1 ,

l  !

      ..                                                                                Page 12 BF SI 4.7.C            !    ,

Table 3.11 5/11/76 Data Sheet SI 4.7.C-2 (continued) U3RZ RFz U1RZ U2RZ Elevation i~ 34, 36 40 519.0 30 t 35, 37 41 j 31  ! 43, 44 45 541.5 42

                                                              # 249                 255
                             #221          # 236, # 241 565.0
                                                              #250                  242
                             # 231         # 237
                                                              #251                  226 224        # 238 255                231
                             # 229           240
 -                            # 228           242
 *                            #232
                              #230 r'                           #230a L.
                                                               # $26, # 827
            . 583.0            # 298 497, 501           506 593.0           #538
                                            # 540               # 513
                               # 539
                                             #541               # 514 490 640, 647          651 621.25           # 534
                                             #648               d'457
                                #637 635       #649                #458 672                675 6'9.0             670
  • 673 _

700, 702, 724, 715, 713 713 717 724 715 664.0 704 700 725 716 701, 703, 725, 716, 714 705 701 714 722 7 17 704, 720, 722, 706, 717 712 715 706 g, m, m, 70e, m 71e 723 20,

  -                                                                            Page 13 BF SI 4.7.C DATA SIEET SI 4.7.C-1    (Continued)       5/11/76 Step    Component / Process Variable             Verify and/or Record Initials /Date 6.1.1   U1RZ           Configuration                                          ,@

6.1.2 U2RZ Configuratioa 6.1.3 U3RZ Configuration 6.1.4 RFZ Configuration Mb 6.1.5 U1RZ a J RFZ Configuration /[37 7[ 0 10/d 6.1.6 U2RZ and RFZ Configuration 6.1.7 U3RZ and RFZ Configuration M 6.1.8 Reactor Building Configuration N D, 6.2.1 1-15 117, TEST Position //-27-7[ 2-15-64-117 TEST Position N p 3-15 117 TEST Position 14 6.2.2 1-HS-64-120 TEST Position //-27 75/

                                                                                  !V Q                 2-1G-64-120                              TEST Position              dN 3-15 120                             TEST Position  -

M 6.2.3 SGTS Train A START or SGTS Train B START C / / "M-8 or SGTS Train C START 7 J'AN Unit 1 Reactor Zone U-1 Reactor Zone Ventilation Sys. Shutdown //,27 Id 1-FCO-64-13 Closed -

                                                                                          //-2 7-N 1-Fco-64-14                              Closed                     h //~27-7f.

W/[ //-A7-N 1-FCo-64-42 Closed 1-FCO-64-43 Closed vl///-M-Y l - u9 l l . s

                       .4 . ...         .. a.r    . . . ,   . . . .                                                                   .

l Page 14 BF SI 4.7.C

                          .                                                                        5/11/76
  '                                          Data. Sheet S1 4.7.C-1           ' Continued) b A Verify and/or Record Initials /Date_                            ,

Step Component / Process Varif 6.2.3 (Continued) Open

                                                                                                                          //J7-$

1-FCO-64-15 Open // 27 78 1-FCO-64-40 v y Open M //-17 76 1-FCO-64-41 Closed /7 / /-17 7f I l-FCO-64-60A

                                                                                                                             ,i 27 77
  • Closed
 ,                        1-FCo-64-60B Closed
                                                                                                                           / /-2 7-N
 "                        1-FCO-64-60C
 "                                                                           Closed                                         //-27 7[

1-FCO-64-60D Shutdown

                                                                                                                           //-2 7-7[

U-1 Stair Hall Supply Fan

                                                      -                                                 ,y Unit 2 Reactor Zone U-2 Reactor Zone Ventilation Sys                 Shutdown                                 M f

Closed

          .                 2-FCO-64-13 Closed 2-FCo-64-14 Closed 2-FCO-64-42 Closed 2-FCo-64-43 Open 2-FCO-64-15 Open 2-FCO-64-40 Open                                     W 2-FCO-64-41 Unit 3 Reactor Zone Shutdown
                                                                                                                      /M U-3 Reactor Zone Ventilation Sys Closed i               -

3-FCO-64-13 3-FCO-64-14 Closed 3 f Closed I 3-FCo-64-42 - Closed _ 3-FCO-64-43 . I 3-FCO-64-15 Open Open , 3-FCO-64-40 s

g ' Page 15 BF SI 4.7.C Data saeet SI 4.7.C-1 (Continued) 5/11/76 Step Component / Process Variable Verify and/or Record Initials /Date 6.2.3 (Continued) Unit 3 Reactor Zone (Continued) 3-FCO-64-41 Open M

                            -FCO-64-60A                          Closed 3-FCO-64-60B                            Closed 3-FCo-64-60C                            Closed
 "                                                               Closed 3-FCO-64-60D I                                                                                            j,
                        ' U-3 Stair Hall Supply Fan
                                         ~

Shutdown \V r 6.3.1 1-HS-64-119 TEST Position (_M& //-27 ?I 6.3.2 1-HS-64-122 TEST Position //-177d If 6.3.3 SGTS Train A START or SGTS Train B START //-)7-7f I / cf L or SGTS Train C START 'M T Refueling Zone U-1 Area Refueling Zone Vent Sys Shutdown //~')7 78 G Shutdown [' g U-2 Area Refueling Zone Vent Sys / /-17 -7T U-3 Area Refueling Zone Vent Sys Shutdown /I-37-7 1-FCO'-64-6 Close //-)737 2-FCO-64-6 Close //J7 77 3-FCO-64-6 e'ose //-.27 7I h 1-FCO-64-5 Close //-7~/7[ 2-FCO-64-5 Close //-277/l 3-FCO-64-5 .- Close / I-27-7[ 1-FCO-64-10 Close //-d7 7Y 2-FCO-64-10 Close //-O-7 3-FCO-64-10 Close //-2)-7[I ep

'I i

or at ..... 5/2/78

  • Data Shect SI 4.7.C-1 ,(Continued)

Verify .and/or itecord_ In i ti a l s /n.,t e __ g ,Cg:tmonent/1'rocens Variabic 6.3.3 (Cottf .inued) nefuelin: (Continued)

                -            1-FCO-64-9
7. nan Close W //-17 7I f / / _27 ) $

Close 2-l'CO-64-9 Close //-377[ 3-PCO-64-9 n.2 ~7 7 f Open l-FCO-64-63 Open

                                                                                                                      //-27-8 1-FCO-64-7 Close                                  //-)7-78
  • 1-FCo-64-65A
                                                                                ~
                                                                                                                      // ~27-
  • l-FCO-64-65B Clese cio,,
                                                                                                                       //M 7[

1-FCO-64-65C Close

                                                                                                                       /IS)")
  • l-FCO-64-65D ,
                                                        -                       Open
                                                                                                                       //47 7[
  • 1-FCo-64-44 Open
                                                                                                                      //-?7-7 8 '

1 - - FCO 54-45' Shutdown //J7-7[ Equipment Access Lock Exhaust Fan il Shutdoun

                                                                                                                     //-D-7 f U-l Stair 11all Supply ran Shutdown
                                                                                                                     //-l~7-7 [
                              .U-3 Stair Itall Supply Fan                                                     v i                                                   -

g i

                                                                                                                         ~ //-)7-7 $
                                                                   -                       Md sfem 6.4 2            F1-65-50                                                                                  //-97-7[
                                                                           .             Nond sfem FI-65-71                                                                                 [I )] ~]$

h Q bD,D _s[cm Tt1 .. . yy g

             *Revi::fon                                                                       f II    /                                                              i
~ m: .v rwr;m.-,[ - . ., _,

L'a CC L/ BF SI 4.7.C Data Shcot SI 4.7.C-1 (Cont inued) 5/2/78 Step Component / Process variable verify .and/or Record Initials /Date 6.43 1-PdIC Rx Zone _ M "H90 //-D.76

  • Thermometer Rx Zone A4 F O f/8/]) //-277f 2-PdIC Rx Zone , To "H 0 g /h ,f)yy
  • Thermometer Rx Zonc 4'A F /49Q L /-217 T 3-PdIC Rx Zoac ,cN "Hg0 Kyy/A , f-> > . n D
  • Thermoccter Rx Zone -Ah4DF SWM n_27-7g 1-PdIC Refucling Zone ,3/ "H2 O &J#// n.n_W 2-PdIC Refueling Zone -30 "H O 2 / /-77 7 I r- 3-PdIC Refueling Zone %3 / "H 2O //-)7.7[

L

  • Thermometer Refueling Zone d/A F //-)2 7[

6.4. 4 All zones 3 -1/4" H 2O ,_ gM h Q fj,7 7,7 7 L Direction SE W/) .i n.K r

  • 6.4 5 33 ft. level / Windspeed / 6N.ph #1 //47Y
            *6.4.5.1          Thermometer / Outside temp.                                  86 F                         //,.2 7-T 6.4. 6 ,     FI-65-50                                                            scfm              k r                   . FI-65-71                                                            scfm f

L ~. Total scfm i s Il 6.4. 7 1-PdIC-64-2 Rx Zone t "H2O U 2-PdIC-64-2 Rx Zone "H 2O 3-PdIC-64-1 Rx Zone "H 2O l-PdIC-64-1 Refueling Zone "H2O 2-PdIC-64-1 Refueling Zot.c "H 2O 3-PdIC-64-1 Refueling Zone "H 2O . 6.4.8 All zones < -1/4"H 2O \/

                                                                               ~
6. 4.9 Zones Isolated List /A 44
  • Revision [d g

1/ . a  ; O .

         *         -h    e

U. - Page 18 Data Sheet SI 4.7.C-1 BF SI 4.7.C

        .                                                                                     5/11/76 Step       component / Process variable               verify and/or Record Initials /Date Return to Normal 6.4.11     FI-65-50                                                      scfm FI-65-71                                                      se fm Total                                                      scfm 6.4 J2     1-PdIC-64-2 Rx Zone                                           "H2O 2-PdIC-64-2 Rx Zone                                           "H2O a                   3-PdIC-64-2 Rx Zone                                           "H2O

[ 1-PdIC-64-1 Refueling Zone "H 2O

                      .2-PdIC-64-1 Refueling Zone                                    "H 2O e

3-PdIC-64-1 Refueling Zone " 112 0 6.4.13 Remaining zones 5 -1/4"1120 \/ i 6.4.14 1-HS-64-117 NORMAL

                                                                                                         //-373[[

r . ff hM [ 2-IIS-64-117 NORMAL

  -                    3-11S-64-117                               NORMAL                              /M 1-IIS-64-120                               NORMAL                                  //iD-h 2-11S-64-120                               NORMAL                               N 3-ils-64-120                                NORMAL                             bh l

1-HS-64-119 NORMAL -N 1-11S-64-122 NORMAL f[~ ~ H .. g .

                                                             ~

1 . B -

[.- _ Page 19 BF SI 4.7.C l Data Sheet SI 4.7.C-1 5/11/76 i Step component / Process Variable Verify and/or Record Initials /Date Return to Normal 6.4. 15 SGTS Fan A 0FF N FCO-65-3 Closed

            ~

A-SGTS humidity control heater OFF hk r A-SGTS charcoal heater On M ~ SGTS Fan B 0FF //d7lf FCO-65-25 Closed // J)-7f B-SGTS humidity control heater OFF / / 97 '2[ [/ 97-)[ B-SGTS charepal heater ON l' I r SGTS Fan C - OFF V FCO-65-51 Closed [[ [ C-SGTS humidity control heater OFF M C-SGTS charcoal heater ON N L Unit 1 Reactor Zone U-1 Reactor Zone Ventilation System In operation as required 1-FCO-64-13 OPEN //-M 7[ 1-FCO-64-14 OPEN //-))J$ 1-FCO-64-42 OPEN //-)73[ 1-FCC-54 '.3 OPEN //273[ 1-FCO-64-15 Closed //-)7-7[ 1-FCO-64-40 Closed // D7[ 1-FCo-64-41 .- Closed // J7]I 1-FCO-64-60A Open //-I7-7! I 1-FCO-64-60B Open //1773 [ 1-FCC-64-60C Open //-)) 7 1-FCO-64-600 Open //d77I U-1 Stair Hall Supply Fan In operatio'n as requir

~,
       *
  • Page 20 BF S1 4.7.C Data Sheet SI 4.7.C-1 (Continued) 5/11/76 1 .

Step Component / Process Variable ' Verify and/or Record Initicis/Date 6.4 15 (Continued) Unit 2 Reactor Zone U-2 Reactor Zone Ventilation System In operation as required 2-FCO-64-13 Open 2-FCo-64-14 open r

 .                             2-FCO-64-42                              Open r                             2-FCO-64-43                              Open i

2-FCO-64-15 Closed 2-FCO-64-40 closed 2-FCO-64-41 Closed k/ I' L Unit 3 Reactor Zone ri U-3 Reactor Zone Ventilation System In operation as required 3-FCO-64-13 Open N

         ~

J 3-FCO-64-14 Open 3-FCo-64-42 Open r 3-FCO-64-43 Open 3-FCO-64-15 Closed 3-FCo-64-40 Closed 3-FCo-64-41 Closed l 3-FCO-64-60A Open - 0 Open 3-FCO-64-60B 3-FCo-64-60C Open l 3-FCo-64-6'0D Open U-3 Stair 11all Supply Fan In Operation as Required B . O .

Page 21 BF SI 4.7.,C

         '                                      Data Sheet SI 4.7.C-1(Continued)             5/2/78 Component /proccc*: Variabic                   Vet .fy mnd/or itecord Tnitials/n,te Sten 6.4. 15 (Continued)

Itofueling Zone U-l Arca Refueling Zone Vent Sys In Operation as required

               -           U-2 Area Refueling Zcnc Vent Sys              In Operation as required U-3 Area Refueling Zone Vent Sys              In Operation as required p              .

b 1-FCO-64-6 . Open N //-27 7f I I f 2-FCO-64-6 Open +c / / 2h?[ 3-FCO-05-6 Open b / / / @-)[' 1-FCO-64-5 Open //_J7J[

                                                                                                            //-3)77 2-FCO-64-5
  • Open r

3-FCO-64-5 - Open

                                                                                                             //J7JI Open                                / / -)~/-)/

l-FCO-64-10 2-FCo-64-10 Open

                                                                                                          /
                                                                                                              // N /[
  '                                                                                               /
                                     ~

3-FCo-64-10 Open en //W) 7I ~ Open

                                                                                                             / / 07 '7[

1-FCO-64-9 . 2-FCO-64-9 Open //50-7I 3-FCO-64-9 Open //J/ 7[

                      .       1-FCO-64-63                                 Close                                // 7M
                                                                                                               //-8 Y Close l-FCO-64-7 v      -
                        .* 1-FCO-64-65A                         .         Open                      ,        //-27)[
  • 1-FCo-64-65B 0 pin //. 7.7j/
  • l-FCo-64-65C Open //-7/ ?[
       !                ** l-FCO-64-65D                   -

Open MS-Y l-FCO-64-44 - Cloco //-17-I 1-iCO-04-45 Close //-7/-7[ 03

                                                                       -      .                     vv Equipment Access T.ock Exhaust Fan          In Operation as required 7

U-1 Stair lla11 supply Fan In operation as required U U-3 Stair llall Supply Fan In Operation an required .,}}