ML19325C897: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 21: Line 21:
g                    1          ._.t.                  *
g                    1          ._.t.                  *
     ~ }<i Q 4 :
     ~ }<i Q 4 :
              ,
e y39                .. .            _
e y39                .. .            _
p                                  ic                ;./                  N Commonweehh Edison                                .
p                                  ic                ;./                  N Commonweehh Edison                                .
y , gar              g ;b l,- '                        i          _ d 72 West Adams Street Chicago, Illinois b,'                            jy'                        \ '''' / Address Reply to: Pc.t Offica Box 767 ---
y , gar              g ;b l,- '                        i          _ d 72 West Adams Street Chicago, Illinois b,'                            jy'                        \ '''' / Address Reply to: Pc.t Offica Box 767 ---
4,                                            ,            A4 Chicago, Illinois 60690 0767 jy Qi ,' <
4,                                            ,            A4 Chicago, Illinois 60690 0767 jy Qi ,' <
  -.
c_ ,
c_ ,
t .-
t .-
p,g                                                                                                              : October 11, 1989:
p,g                                                                                                              : October 11, 1989:
y  , 1
y  , 1
                                  &
:[                                        Dr; Thomas E..Murley. Director?
:[                                        Dr; Thomas E..Murley. Director?
                                                   ' Office of Nuclear Reactor Regulation                                                            4
                                                   ' Office of Nuclear Reactor Regulation                                                            4 U.SL Nuclear Regulatory Commission                                                          -l 4                                              '
          *
                  .
U.SL Nuclear Regulatory Commission                                                          -l
* 4                                              '
Hashington, DC 20555                                                                            ,
Hashington, DC 20555                                                                            ,
                                                                                                                                                      ,
                                                                                                                                                      ,
                                                                                                                                                   ^
                                                                                                                                                   ^


==Subject:==
==Subject:==
Quad Cities Nuclear Power Station Unitel                          l Cycle 11 Reload
Quad Cities Nuclear Power Station Unitel                          l Cycle 11 Reload
                                                                                  '
   ,o JiRC Docket No. 50-254                                ;
   ,o JiRC Docket No. 50-254                                ;
     ~
     ~
                                                                      .                                .      -
:


==Reference:==
==Reference:==
Line 55: Line 43:
m                                                                                      - to Remove Cycle-Specific Core Limits from the-.            .
m                                                                                      - to Remove Cycle-Specific Core Limits from the-.            .
                                                                                         - Technical Specification", dated July' 11,:1989/            ,
                                                                                         - Technical Specification", dated July' 11,:1989/            ,
    .
         .n                                    ,                                                                                                    ;
         .n                                    ,                                                                                                    ;
tv                          s A                                          ,
tv                          s A                                          ,
                                                  -
                                                     .Dr. Murley:'
                                                     .Dr. Murley:'
\r
\r
Line 65: Line 51:
1 .
1 .
E[] -                                                                      -                  -
E[] -                                                                      -                  -
                                                                                                                                -
                                                                                                                                                    -
                                                                         ' Quad Cities Station Unit 1,:which has completed its tenth cycle of    u
                                                                         ' Quad Cities Station Unit 1,:which has completed its tenth cycle of    u
       ~
       ~
                                                                  .
L,                                                    operation,=is currently preparing for. Cycle-11 startup. The purpose of this                3
L,                                                    operation,=is currently preparing for. Cycle-11 startup. The purpose of this                3
    . .
                                                     . letter is twofold: .'(1) -to advise you of: Commonwealth, Edison's review and                  ;
                                                     . letter is twofold: .'(1) -to advise you of: Commonwealth, Edison's review and                  ;
$<                                                - approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2) .                ,
$<                                                - approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2) .                ,
Line 78: Line 60:
                                                     - cycle 7as required by Generic-Letter 88-16. Note that Edison has submitted the-
                                                     - cycle 7as required by Generic-Letter 88-16. Note that Edison has submitted the-
                                                   - necess'ary Technical Specification changes-(See Reference) to incorporate:the                    .
                                                   - necess'ary Technical Specification changes-(See Reference) to incorporate:the                    .
'
                    '
                                     /    ,      - COLR. . Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment                        -
                                     /    ,      - COLR. . Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment                        -
             <                                        prior to unit startup.
             <                                        prior to unit startup.
* y                s
* y                s
                                            ,          ..
                                                                           - The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design                      !
                                                                           - The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel
    .'
designs:and was designed to' operate under currently approved fuel design                      !
q                              parameters, Technical Specifications and related bases such that:                              {
q                              parameters, Technical Specifications and related bases such that:                              {
W                            '
W                            '
                                                                 ' 1 )- . Core operating characteristics will be less limiting than those previously reviewed and accepted; or
                                                                 ' 1 )- . Core operating characteristics will be less limiting than those previously reviewed and accepted; or ll-}
                                                                                                                                                      ,
                                                                                                                                                      ,
ll-}
                                                                                                                                                    '
,,
        '
: 2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.
: 2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.
Off  1          ,
Off  1          ,
                          '        '
0318T:1                            891018o056 891011                              i PDR    ADOCK 0500o254 p
0318T:1                            891018o056 891011                              i PDR    ADOCK 0500o254 p
    .
m-                                                                        PDC
m-                                                                        PDC
: 5. k- -            3
: 5. k- -            3


   *  ",  [                                          .
   *  ",  [                                          .
      ,
           .c. 3, i
           .c. 3, i
b      .
b      .
Dr. T.E. Nurley                                                          October 11, 1989
Dr. T.E. Nurley                                                          October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant                  .
                                                                                                              ,
Commonwealth Edison has performed a detailed review of the relevant                  .
licensing documents, the bases, and references. Based on the review..a safety                  j evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to                        '
licensing documents, the bases, and references. Based on the review..a safety                  j evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to                        '
On-Site and Off-Site Review. As in the past, the. reload licensing documents                    j
On-Site and Off-Site Review. As in the past, the. reload licensing documents                    j
               .were prepared using previously approved methodologies as reported in the FSAR                    ;
               .were prepared using previously approved methodologies as reported in the FSAR                    ;
NEDE-24011 (GESTAR), and other generically approved documents.                                  i l
NEDE-24011 (GESTAR), and other generically approved documents.                                  i l
                  .
                       .: Edison has reviewed the cycle-specific licensing results and concluded              j that additional Technical-Specification changes are not required for Cycle 11-                  '
                       .: Edison has reviewed the cycle-specific licensing results and concluded              j that additional Technical-Specification changes are not required for Cycle 11-                  '
  ,
operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval. Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.                .)
operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval. Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload.                .)
1                                                                                                              \
1                                                                                                              \
                         'Therefore, application for an amendment to the Quad Cities Unit 1
                         'Therefore, application for an amendment to the Quad Cities Unit 1 1
'
operating license is not required for resumption of operation with the Cycle 11 reload core. The estimated startup is November 20, 1989.                                        1 l
1 operating license is not required for resumption of operation with the Cycle 11 reload core. The estimated startup is November 20, 1989.                                        1 l
L
L
                         'If-there are any further questions regarding this matter, please                    j i
                         'If-there are any further questions regarding this matter, please                    j i
Line 128: Line 91:
Very truly yours, l
Very truly yours, l
g      -
g      -
J. A. S11ady Nuclear Licensing Administrator
J. A. S11ady Nuclear Licensing Administrator im Attachment.
* im Attachment.
               .cc:  T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2
               .cc:  T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities
  ,
0318T:2
_ - - - _ _ - _ - _ _ _ _ _ _ _ _}}
_ - - - _ _ - _ - _ _ _ _ _ _ _ _}}

Revision as of 00:48, 1 February 2020

Advises of Util Review & Approval of Cycle 11 Reload & Forwards Core Operating Limits Rept (COLR) for Upcoming Cycle Per Generic Ltr 86-16.Tech Spec Changes to Incorporate COLR Submitted
ML19325C897
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/11/1989
From: Silady J
COMMONWEALTH EDISON CO.
To: Murely T
Office of Nuclear Reactor Regulation
Shared Package
ML19325C898 List:
References
0318T:1, 318T:1, GL-88-16, NUDOCS 8910180056
Download: ML19325C897 (2)


Text

m;; -

'E #

g 1 ._.t. *

~ }<i Q 4 :

e y39 .. . _

p ic  ;./ N Commonweehh Edison .

y , gar g ;b l,- ' i _ d 72 West Adams Street Chicago, Illinois b,' jy' \ ' / Address Reply to: Pc.t Offica Box 767 ---

4, , A4 Chicago, Illinois 60690 0767 jy Qi ,' <

c_ ,

t .-

p,g  : October 11, 1989:

y , 1

[ Dr; Thomas E..Murley. Director?

' Office of Nuclear Reactor Regulation 4 U.SL Nuclear Regulatory Commission -l 4 '

Hashington, DC 20555 ,

^

Subject:

Quad Cities Nuclear Power Station Unitel l Cycle 11 Reload

,o JiRC Docket No. 50-254  ;

~

Reference:

J. A.;Silady to T.E. Murley, " Quad Cities Nuclear- .t Power Station Units 1:and 2, Proposed Amendment "

m - to Remove Cycle-Specific Core Limits from the-. .

- Technical Specification", dated July' 11,:1989/ ,

.n ,  ;

tv s A ,

.Dr. Murley:'

\r

=

g- ,

1 .

E[] - - -

' Quad Cities Station Unit 1,:which has completed its tenth cycle of u

~

L, operation,=is currently preparing for. Cycle-11 startup. The purpose of this 3

. letter is twofold: .'(1) -to advise you of: Commonwealth, Edison's review and  ;

$< - approval..'of the Cycle 11-reload!under the provisions of 10 CFR 50.59,-and (2) . ,

C to transmit the attached Core Operating Limits Report (COLR) forLthe upcoming .

~ l

- cycle 7as required by Generic-Letter 88-16. Note that Edison has submitted the-

- necess'ary Technical Specification changes-(See Reference) to incorporate:the .

/ , - COLR. . Edison's.10 CFR 50.59 evaluation assumes approval of-this-amendment -

< prior to unit startup.

  • y s

- The Quad Cities Unit 1 Cycle 11 core consists of NRC approved fuel designs:and was designed to' operate under currently approved fuel design  !

q parameters, Technical Specifications and related bases such that: {

W '

' 1 )- . Core operating characteristics will be less limiting than those previously reviewed and accepted; or ll-}

2) For those' postulated incidents analyzed and reported in the Final Safety Analysis ~ Report (FSAR) which could potentially be affected by the fuel reload,: re-analysis using NRC-approved methods has demonstrated that the results of the postulated events are within allowable limits.

Off 1 ,

0318T:1 891018o056 891011 i PDR ADOCK 0500o254 p

m- PDC

5. k- - 3
  • ", [ .

.c. 3, i

b .

Dr. T.E. Nurley October 11, 1989 Commonwealth Edison has performed a detailed review of the relevant .

licensing documents, the bases, and references. Based on the review..a safety j evaluation was prepared as required by 10 CFR 50.5?(a,b) and submitted to '

On-Site and Off-Site Review. As in the past, the. reload licensing documents j

.were prepared using previously approved methodologies as reported in the FSAR  ;

NEDE-24011 (GESTAR), and other generically approved documents. i l

.: Edison has reviewed the cycle-specific licensing results and concluded j that additional Technical-Specification changes are not required for Cycle 11- '

operation at Quad Cities Unit 1 assuming the reference amendment receives NRC approval. Furthermore, Edison has completed On-Site and Off-Site Reviews-which determined that no unreviewed safety questions are created by the reload. .)

1 \

'Therefore, application for an amendment to the Quad Cities Unit 1 1

operating license is not required for resumption of operation with the Cycle 11 reload core. The estimated startup is November 20, 1989. 1 l

L

'If-there are any further questions regarding this matter, please j i

contact this office. l I

Very truly yours, l

g -

J. A. S11ady Nuclear Licensing Administrator im Attachment.

.cc: T.M. Ross - Project. Manager, NRR R.L. Higgins - Senior Resident Inspector, Quad Cities 0318T:2

_ - - - _ _ - _ - _ _ _ _ _ _ _ _