{{#Wiki_filter:,              _                            _
{{#Wiki_filter:,              _                            _
                                    ._
,
r      ,
r      ,
                                                      .
i BOSTON EDISCN CCMPANT                    D                                      ua TELECOPY MESSAGE Ta:        15-337-5324                          -
i BOSTON EDISCN CCMPANT                    D                                      ua TELECOPY MESSAGE
Date/Ti:ne: Sept. 11, 198p 1200 Telephone Number Ta: Director, Region I.                                        From: Pilgrim Nuclear Power Station Office of Inspectica and Enforcement                              RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission                              Ply =outh, MA          02360 631 Park Avenue King of Prussia, PA 19406 Subj ect:      ?ROMPT REPORTA3LE OCCURRENCE Docke: Number 50-293; License DPR-35                              .
                                                            .
Assigned Lt.~.4 Number 80-050/01I-0 Even:
                                            '
Ta:        15-337-5324                          -
Date/Ti:ne: Sept. 11, 198p 1200 Telephone Number
                                                                    .
Ta: Director, Region I.                                        From: Pilgrim Nuclear Power Station Office of Inspectica and Enforcement                              RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission                              Ply =outh, MA          02360 631 Park Avenue King of Prussia, PA 19406
                                                                                                                .
Subj ect:      ?ROMPT REPORTA3LE OCCURRENCE Docke: Number 50-293; License DPR-35                              .
Assigned Lt.~.4 Number 80-050/01I-0
                                -
Even:


== Description:==
== Description:==
Line 38: Line 26:
I Cause and Corrective Action: Root cause of this occurrence is sparse and anbiguous technical
I Cause and Corrective Action: Root cause of this occurrence is sparse and anbiguous technical
,    spscifications for operation with installed alternate shutdown panels.
,    spscifications for operation with installed alternate shutdown panels.
!
,
                                      .
Fccility Status:                                                              100
Fccility Status:                                                              100
                                    ,_ _. -
* Ther:nal MW c) Routine Starm.tp                                        ~
* Ther:nal MW c) Routine Starm.tp                                        ~
g) Shutdown d) Routine Shuticwn                                                      h) Refueling c) Steady' State            x                                            'i) Other f) Load' Changing                            ,                            j) Not Applicaple A wri::en follow-up report v4'? be sent within two weeks.                                                                    -
g) Shutdown d) Routine Shuticwn                                                      h) Refueling c) Steady' State            x                                            'i) Other f) Load' Changing                            ,                            j) Not Applicaple A wri::en follow-up report v4'? be sent within two weeks.                                                                    -
NRC person notified          Mr. K. Roberts                    Prep'ared by Mr. M. T. Mhoughlin
NRC person notified          Mr. K. Roberts                    Prep'ared by Mr. M. T. Mhoughlin 8 o 0 917 0 3iil                                                            -
                                                                                          *
eN Mail- (2) copies to-Director. '
*
                                                                                                          . .          .
                                                                                                                      ... _
                                                              -
                                                                      ,-                                          -        -
_
8 o 0 917 0 3iil                                                            -
eN Mail- (2) copies to-
                                              '
Director. '
l,        Office of Management Information and ?rogram Control
l,        Office of Management Information and ?rogram Control
* U. S. Nuclear Regula:ory Co-unission.                                                      .
* U. S. Nuclear Regula:ory Co-unission.                                                      .
Washi=gton, D.C.- 20535
Washi=gton, D.C.- 20535
                -            .                  .      -      -        - .-                    ., .      . , .  - - _ .


                                                                              --.                          .
_                                                                        -                      -
          -
'
        ,
                        -
BOS' N EDISON COMPANY                        ,
BOS' N EDISON COMPANY                        ,
6                      s          PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Attachment to LER 80-050/01X-0
6                      s          PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Attachment to LER 80-050/01X-0 Description On September. 10, 1980 at approximately 1700 hours a management review concluded that a Technical Specification violation had occurred. The violation occurred on. September .7, 1980.
                            .                      .
                                                          .
                                                                                                .
Description On September. 10, 1980 at approximately 1700 hours a management review concluded that a Technical Specification violation had occurred. The violation occurred on. September .7, 1980.
                                                                                    '
                                                    *
                                                      ..
On September 7,- 1980 whila performing surveillance tests prior to removing ' A' diesel generator from service it was determined that RBCCW pump 'P202D was inoperable.- Although RBCCW pump P202D was inoperable, the Watch Engineer per-mitted the diesel generator to be. removed. from service at that time because it              ' '
On September 7,- 1980 whila performing surveillance tests prior to removing ' A' diesel generator from service it was determined that RBCCW pump 'P202D was inoperable.- Although RBCCW pump P202D was inoperable, the Watch Engineer per-mitted the diesel generator to be. removed. from service at that time because it              ' '
was known that there were installed spares in each of the RBCCW loops.
was known that there were installed spares in each of the RBCCW loops.
However, the September 10,.1980 management review concluded that since alternate shutdown panels installed during the last refueling outage restricted remote control of.the RBCCW pumps- to two of three installed units per loop and since RBCCW pump P202D was one of those two,. thac 'A' diesel generator should not
However, the September 10,.1980 management review concluded that since alternate shutdown panels installed during the last refueling outage restricted remote control of.the RBCCW pumps- to two of three installed units per loop and since RBCCW pump P202D was one of those two,. thac 'A' diesel generator should not have been removed from service.                                                              .
_
have been removed from service.                                                              .
Cause & Corrective Action                -
Cause & Corrective Action                -
1 The sparse and ambiguous language of the Technical Specifications is believed to be the rope cause of this occurrence.in that the Limiting Condition for Operation of the Safe Shutdown Panels is not clearly defined.
1 The sparse and ambiguous language of the Technical Specifications is believed to be the rope cause of this occurrence.in that the Limiting Condition for Operation of the Safe Shutdown Panels is not clearly defined.
                                                                                                                ,
                                                                                                                 ;
                                                                                                                 ;
Upon identification of this situation a reactor shutdown was immediately                          !
Upon identification of this situation a reactor shutdown was immediately                          !
initiated but terminated at approximately 1810 hours on September 10, 1980, following the return of the ' A' diesel generator to service. Additionally, a priority ' A' maintenance request was issued to return RBCCW pump P202D to operable status.                                                                      -
initiated but terminated at approximately 1810 hours on September 10, 1980, following the return of the ' A' diesel generator to service. Additionally, a priority ' A' maintenance request was issued to return RBCCW pump P202D to operable status.                                                                      -
To provide long term corrective action it is contemplated that following ad-d1tional review of the existing equipment and their requirements that two action items will be proposed. .
To provide long term corrective action it is contemplated that following ad-d1tional review of the existing equipment and their requirements that two action items will be proposed. .
1      A design change to plant equipment and, 2_    Technical Specification revision to clarify the LCO's for operation
1      A design change to plant equipment and, 2_    Technical Specification revision to clarify the LCO's for operation with installed alternate shutdown panels.
                      -
i l                            -
with installed alternate shutdown panels.
                                  .
i
                                                                                                        *
                                                                                                      .
                                                            .
l                            -
                                              .
4}}
4}}

Revision as of 07:55, 31 January 2020

RO 80-050/01X-0:on 800907,during Surveillance Testing,Diesel Generator Removed from Svc When RBCCW Pump P202D Found Inoperable.Caused by Ambiguous Tech Specs.Tech Specs Will Be Revised to Clarify Limiting Condition of Operation
ML19343A419
Person / Time
Site: Pilgrim
Issue date: 09/11/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
References
80-50-01X-0, 80-50-1X, NUDOCS 8009170381
Download: ML19343A419 (2)


Text

, _ _

r ,

i BOSTON EDISCN CCMPANT D ua TELECOPY MESSAGE Ta: 15-337-5324 -

Date/Ti:ne: Sept. 11, 198p 1200 Telephone Number Ta: Director, Region I. From: Pilgrim Nuclear Power Station Office of Inspectica and Enforcement RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission Ply =outh, MA 02360 631 Park Avenue King of Prussia, PA 19406 Subj ect: ?ROMPT REPORTA3LE OCCURRENCE Docke: Number 50-293; License DPR-35 .

Assigned Lt.~.4 Number 80-050/01I-0 Even:

Description:

Licensee Event Report 80-050/01X-0 is being submitted in accordance with the requirements of PNPS Technical Specification 6.9.3.1.b. Management review of station operating conditiens concluded that a plant shutdown was not commenced as required by Technical Specification. -

I Cause and Corrective Action: Root cause of this occurrence is sparse and anbiguous technical

, spscifications for operation with installed alternate shutdown panels.

Fccility Status: 100

  • Ther:nal MW c) Routine Starm.tp ~

g) Shutdown d) Routine Shuticwn h) Refueling c) Steady' State x 'i) Other f) Load' Changing , j) Not Applicaple A wri::en follow-up report v4'? be sent within two weeks. -

NRC person notified Mr. K. Roberts Prep'ared by Mr. M. T. Mhoughlin 8 o 0 917 0 3iil -

eN Mail- (2) copies to-Director. '

l, Office of Management Information and ?rogram Control

  • U. S. Nuclear Regula:ory Co-unission. .

Washi=gton, D.C.- 20535

BOS' N EDISON COMPANY ,

6 s PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Attachment to LER 80-050/01X-0 Description On September. 10, 1980 at approximately 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> a management review concluded that a Technical Specification violation had occurred. The violation occurred on. September .7, 1980.

On September 7,- 1980 whila performing surveillance tests prior to removing ' A' diesel generator from service it was determined that RBCCW pump 'P202D was inoperable.- Although RBCCW pump P202D was inoperable, the Watch Engineer per-mitted the diesel generator to be. removed. from service at that time because it ' '

was known that there were installed spares in each of the RBCCW loops.

However, the September 10,.1980 management review concluded that since alternate shutdown panels installed during the last refueling outage restricted remote control of.the RBCCW pumps- to two of three installed units per loop and since RBCCW pump P202D was one of those two,. thac 'A' diesel generator should not have been removed from service. .

Cause & Corrective Action -

1 The sparse and ambiguous language of the Technical Specifications is believed to be the rope cause of this occurrence.in that the Limiting Condition for Operation of the Safe Shutdown Panels is not clearly defined.

Upon identification of this situation a reactor shutdown was immediately  !

initiated but terminated at approximately 1810 hours0.0209 days <br />0.503 hours <br />0.00299 weeks <br />6.88705e-4 months <br /> on September 10, 1980, following the return of the ' A' diesel generator to service. Additionally, a priority ' A' maintenance request was issued to return RBCCW pump P202D to operable status. -

To provide long term corrective action it is contemplated that following ad-d1tional review of the existing equipment and their requirements that two action items will be proposed. .

1 A design change to plant equipment and, 2_ Technical Specification revision to clarify the LCO's for operation with installed alternate shutdown panels.

i l -