ML19344E796: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:T&s-AUBLIC SERVICE | {{#Wiki_filter:T&s-AUBLIC SERVICE Companyof New Hampshere SEAsROOK STATION Engineering Office: | ||
Companyof New Hampshere SEAsROOK STATION Engineering Office: | |||
20 Turnpike Road Wootborough, MA 01541 August 4, 1980 SBN-130 Ref SBU-37748 SBU-38001 T.F. B 4.2.5 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement | 20 Turnpike Road Wootborough, MA 01541 August 4, 1980 SBN-130 Ref SBU-37748 SBU-38001 T.F. B 4.2.5 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement | ||
| Line 35: | Line 32: | ||
W6 contacted the Commission for clarification of the IE Bulletin 79-03A criteria. We were informed that if the 85% of maximum allowable stress criteria is met, examination of the piping in the field by etching is not required. | W6 contacted the Commission for clarification of the IE Bulletin 79-03A criteria. We were informed that if the 85% of maximum allowable stress criteria is met, examination of the piping in the field by etching is not required. | ||
I If you require further information, please do not hesitate to contact us. | I If you require further information, please do not hesitate to contact us. | ||
l ery truly yours, John DeVincentis Project Manager k HEWatan cc: NRC Office of Inspection and Enforcement Divisien of Reactor Construction Inspection Washindton,D.C. 20555 | l ery truly yours, John DeVincentis Project Manager k HEWatan cc: NRC Office of Inspection and Enforcement Divisien of Reactor Construction Inspection Washindton,D.C. 20555 | ||
* m 8009110 d ? 8 | |||
m | |||
8009110 d ? 8 | |||
_. . ,_ . - - - . - -. __ , . .}} | _. . ,_ . - - - . - -. __ , . .}} | ||
Revision as of 05:21, 31 January 2020
| ML19344E796 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 08/04/1980 |
| From: | Devincentis J PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| IEB-79-03A, IEB-79-3A, SBN-130, NUDOCS 8009110478 | |
| Download: ML19344E796 (1) | |
Text
T&s-AUBLIC SERVICE Companyof New Hampshere SEAsROOK STATION Engineering Office:
20 Turnpike Road Wootborough, MA 01541 August 4, 1980 SBN-130 Ref SBU-37748 SBU-38001 T.F. B 4.2.5 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement
Reference:
- 1. Docket.No. 50-443 and 50-444
- 2. NRC letter dated April 4, 1980
Subject:
Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe
Dear Sir:
We have reviewed all of the SA-312 Type 304 fusion welded stainless steel pipe specified for use in safety related system for the Seabrook Project, and have performed pipe wall thickness calculations using the 85% of the maximum allowable stress criteria defined in IE Bulletin 79-03A. Results of our review indicate that we have sufficient minimum pipe wall thickness.
W6 contacted the Commission for clarification of the IE Bulletin 79-03A criteria. We were informed that if the 85% of maximum allowable stress criteria is met, examination of the piping in the field by etching is not required.
I If you require further information, please do not hesitate to contact us.
l ery truly yours, John DeVincentis Project Manager k HEWatan cc: NRC Office of Inspection and Enforcement Divisien of Reactor Construction Inspection Washindton,D.C. 20555
- m 8009110 d ? 8
_. . ,_ . - - - . - -. __ , . .