IR 05000277/2004005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{IR-Nav| site = 05000277 | year = 2004 | report number = 005 | url = https://www.nrc.gov/reactors/operating/oversight/reports/pb_2004005.pdf }}
{{Adams
| number = ML050260712
| issue date = 01/26/2005
| title = IR 05000277-04-005 & 05000278-04-005, 10/01/2004 - 12/31/2004; Peach Bottom Atomic Power Station, Units 2 and 3; Surveillance Testing and Occupational Radiation Safety
| author name = Shanbaky M
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name = Crane C
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| contact person =
| document report number = IR-04-005
| document type = Inspection Report, Letter
| page count = 35
}}
 
{{IR-Nav| site = 05000277 | year = 2004 | report number = 005 }}
 
=Text=
{{#Wiki_filter:
}}

Revision as of 21:10, 23 December 2019

IR 05000277-04-005 & 05000278-04-005, 10/01/2004 - 12/31/2004; Peach Bottom Atomic Power Station, Units 2 and 3; Surveillance Testing and Occupational Radiation Safety
ML050260712
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/26/2005
From: Shanbaky M
Reactor Projects Region 1 Branch 4
To: Crane C
Exelon Generation Co
References
IR-04-005
Download: ML050260712 (35)


Text