ML051250478: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New) | {{#Wiki_filter:Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New) | ||
Task Title: Determine Pressurizer Heater Operability KSA Ref: 2.1.33 PEO: RO: 3.4 SRO: 4.0 Operators Name: | Task | ||
==Title:== | |||
Determine Pressurizer Heater Operability KSA Ref: 2.1.33 PEO: RO: 3.4 SRO: 4.0 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 86: | Line 89: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY System: Conduct of Operations JTA Task #: (New) | Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY System: Conduct of Operations JTA Task #: (New) | ||
Task Title: Calculate RCS Leakrate KSA Ref: 2.1.23 PEO: RO: 3.9 SRO: 4.0 Operators Name: | Task | ||
==Title:== | |||
Calculate RCS Leakrate KSA Ref: 2.1.23 PEO: RO: 3.9 SRO: 4.0 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 157: | Line 163: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 System: Equipment Control JTA Task #: (New) | Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 System: Equipment Control JTA Task #: (New) | ||
Task Title: Check Completed Surveillance Procedure for Accuracy KSA Ref: 2.2.12 PEO: RO: 3.0 SRO: 3.4 Operators Name: | Task | ||
==Title:== | |||
Check Completed Surveillance Procedure for Accuracy KSA Ref: 2.2.12 PEO: RO: 3.0 SRO: 3.4 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 421: | Line 430: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 System: Radiation Control JTA Task #: (New) | Initial License Exam 03/2005 Job Performance Measure JPM: RO A3 System: Radiation Control JTA Task #: (New) | ||
Task Title: Evaluate Radiological Condition for Task Performance KSA Ref: 2.3.10 PEO: RO: 2.9 SRO: 3.3 Operators Name: | Task | ||
==Title:== | |||
Evaluate Radiological Condition for Task Performance KSA Ref: 2.3.10 PEO: RO: 2.9 SRO: 3.3 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 488: | Line 500: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New) | Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New) | ||
Task Title: Determine Pressurizer Heater Operability KSA Ref: 2.1.33 PEO: RO: 3.4 SRO: 4.0 Operators Name: | Task | ||
==Title:== | |||
Determine Pressurizer Heater Operability KSA Ref: 2.1.33 PEO: RO: 3.4 SRO: 4.0 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 556: | Line 571: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b System: Administrative Procedures JTA Task #: (Bank 2001) | Initial License Exam 03/2005 Job Performance Measure JPM: SRO A1.b System: Administrative Procedures JTA Task #: (Bank 2001) | ||
Task Title: Determine Staff Working Hours KSA Ref: 2.1.5 PEO: RO: 2.3 SRO: 3.4 Operators Name: | Task | ||
==Title:== | |||
Determine Staff Working Hours KSA Ref: 2.1.5 PEO: RO: 2.3 SRO: 3.4 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 609: | Line 627: | ||
Initial License Exam 0312005 Job Performance Measure JPM: SROA2 KEY system: Equipment Control JTA Task #: (New) | Initial License Exam 0312005 Job Performance Measure JPM: SROA2 KEY system: Equipment Control JTA Task #: (New) | ||
Task Title: Complete Technical Specification Paperwork for INOP PZR Heaters (Tracking LOCAR) | Task | ||
==Title:== | |||
Complete Technical Specification Paperwork for INOP PZR Heaters (Tracking LOCAR) | |||
KSA Ref: 2.2-23 PEO: RO: 2.6 SRO: 3.8 Operators Name: | KSA Ref: 2.2-23 PEO: RO: 2.6 SRO: 3.8 Operators Name: | ||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 755: | Line 776: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 System: Radiation Control JTA Task #: (New) | Initial License Exam 03/2005 Job Performance Measure JPM: SRO A3 System: Radiation Control JTA Task #: (New) | ||
Task Title: Evaluate Radiological Condition for Task Performance KSA Ref: 2.3.10 PEO: RO: 2.9 SRO: 3.3 Operators Name: | Task | ||
==Title:== | |||
Evaluate Radiological Condition for Task Performance KSA Ref: 2.3.10 PEO: RO: 2.9 SRO: 3.3 Operators Name: | |||
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 821: | Line 845: | ||
The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map. | The RWP map was removed from this page of the exam by the chief examiner because it was considered potential SUNSI material due to the equipment locations on the map. | ||
Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 System: Emergency Plan JTA Task #: SRO A4.1 Task Title: Event Classification KSA Ref: 2.4.41 EAL Classification PEO: RO: 2.3 SRO: 4.1 Operators Name: | Initial License Exam 03/2005 Job Performance Measure JPM: A4.1 System: Emergency Plan JTA Task #: SRO A4.1 Task | ||
==Title:== | |||
Event Classification KSA Ref: 2.4.41 EAL Classification PEO: RO: 2.3 SRO: 4.1 Operators Name: | |||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 862: | Line 889: | ||
Page 4 of 4 Rev Date: 1/18/05 | Page 4 of 4 Rev Date: 1/18/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 System: Emergency Plan JTA Task #: SRO A4.2 Task Title: Event Classification KSA Ref: 2.4.41 EAL Classification PEO: RO: 2.3 SRO: 4.1 Operators Name: | Initial License Exam 03/2005 Job Performance Measure JPM: A4.2 System: Emergency Plan JTA Task #: SRO A4.2 Task | ||
==Title:== | |||
Event Classification KSA Ref: 2.4.41 EAL Classification PEO: RO: 2.3 SRO: 4.1 Operators Name: | |||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 906: | Line 936: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: P1 System: 118 AC Distribution System & Inverters JTA Task #: (NEW) | Initial License Exam 03/2005 Job Performance Measure JPM: P1 System: 118 AC Distribution System & Inverters JTA Task #: (NEW) | ||
Task Title: Bypass Inverter KSA Ref: APE.057.EA1.01 PEO: RO: 3.7 SRO: 3.7 Operators Name: | Task | ||
==Title:== | |||
Bypass Inverter KSA Ref: APE.057.EA1.01 PEO: RO: 3.7 SRO: 3.7 Operators Name: | |||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 954: | Line 987: | ||
Page 4 of 4 Rev Date: 1/27/05 | Page 4 of 4 Rev Date: 1/27/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: P2 System: Control Room Evacuation JTA Task #: (Direct)AO5412C Task Title: Transfer Charging Pump Suction and Isolate Dilution Paths (Alternate Path) | Initial License Exam 03/2005 Job Performance Measure JPM: P2 System: Control Room Evacuation JTA Task #: (Direct)AO5412C Task | ||
==Title:== | |||
Transfer Charging Pump Suction and Isolate Dilution Paths (Alternate Path) | |||
KSA Ref: APE.068.AA1.22 PEO: RO: 4.0 SRO: 4.3 Operators Name: | KSA Ref: APE.068.AA1.22 PEO: RO: 4.0 SRO: 4.3 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,045: | Line 1,081: | ||
Page 6 of 6 Rev Date: 1/26/05 | Page 6 of 6 Rev Date: 1/26/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: P3 System: Auxiliary Feedwater System JTA Task #: AO 6415 Task Title: Fill the CST from the Fire Protection Header KSA Ref: EPE.074.EA1.107 PEO: RO: 4.2 SRO: 4.3 Operators Name: | Initial License Exam 03/2005 Job Performance Measure JPM: P3 System: Auxiliary Feedwater System JTA Task #: AO 6415 Task | ||
==Title:== | |||
Fill the CST from the Fire Protection Header KSA Ref: EPE.074.EA1.107 PEO: RO: 4.2 SRO: 4.3 Operators Name: | |||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 1,121: | Line 1,160: | ||
Page 7 of 7 Rev Date: 1/15/05 | Page 7 of 7 Rev Date: 1/15/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S-1 System: Reactor Coolant System JTA Task #: RO*1111 Task Title: Verify Natural Circulation (Alternate Path) | Initial License Exam 03/2005 Job Performance Measure JPM: S-1 System: Reactor Coolant System JTA Task #: RO*1111 Task | ||
==Title:== | |||
Verify Natural Circulation (Alternate Path) | |||
KSA Ref: EPE.011.EA2.09 PEO: RO: 4.2 SRO: 4.3 Operators Name: | KSA Ref: EPE.011.EA2.09 PEO: RO: 4.2 SRO: 4.3 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,177: | Line 1,219: | ||
Page 5 of 5 Rev Date: 12/23/04 | Page 5 of 5 Rev Date: 12/23/04 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S2 System: Pressurizer Pressure Control System JTA Task #: (Modified) RO*1209 Task Title: Control Pressurizer Pressure KSA Ref: SF3.010.A1.07 PEO: RO: 3.7 SRO: 3.7 Operators Name: | Initial License Exam 03/2005 Job Performance Measure JPM: S2 System: Pressurizer Pressure Control System JTA Task #: (Modified) RO*1209 Task | ||
==Title:== | |||
Control Pressurizer Pressure KSA Ref: SF3.010.A1.07 PEO: RO: 3.7 SRO: 3.7 Operators Name: | |||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 30 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 30 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory: | ||
| Line 1,276: | Line 1,321: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S3 System: CVCS JTA Task #: (NEW) | Initial License Exam 03/2005 Job Performance Measure JPM: S3 System: CVCS JTA Task #: (NEW) | ||
Task Title: Emergency Borate Using Chemical And Volume Control System (Alternate Path) | Task | ||
==Title:== | |||
Emergency Borate Using Chemical And Volume Control System (Alternate Path) | |||
KSA Ref: SF1.004.A4.18 PEO: RO: 4.3 SRO: 4.1 Operators Name: | KSA Ref: SF1.004.A4.18 PEO: RO: 4.3 SRO: 4.1 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 10 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,340: | Line 1,388: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S4 System: Small Break LOCA JTA Task #: (NEW) | Initial License Exam 03/2005 Job Performance Measure JPM: S4 System: Small Break LOCA JTA Task #: (NEW) | ||
Task Title: Perform Attachment 2 of EOP-0.0A (Alternate Path) | Task | ||
==Title:== | |||
Perform Attachment 2 of EOP-0.0A (Alternate Path) | |||
KSA Ref: EPE.009.EA1.08 PEO: RO: 4.0 SRO: 4.1 Operators Name: | KSA Ref: EPE.009.EA1.08 PEO: RO: 4.0 SRO: 4.1 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,398: | Line 1,449: | ||
Page 5 of 5 Rev Date: 1/27/05 | Page 5 of 5 Rev Date: 1/27/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S5 System: Containment Spray JTA Task #: (Modified) RO2003 Task Title: Operate the Containment Spray System (Alternate Path) | Initial License Exam 03/2005 Job Performance Measure JPM: S5 System: Containment Spray JTA Task #: (Modified) RO2003 Task | ||
==Title:== | |||
Operate the Containment Spray System (Alternate Path) | |||
KSA Ref: SF6.026.A4.01 PEO: RO: 4.5 SRO: 4.3 Operators Name: | KSA Ref: SF6.026.A4.01 PEO: RO: 4.5 SRO: 4.3 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 5 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,448: | Line 1,502: | ||
Page 5 of 5 Rev Date: 1/27/05 | Page 5 of 5 Rev Date: 1/27/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S6 System: Emergency Diesel Generator JTA Task #: (Modifed)RO4032 Task Title: Load Diesel Generator (Alternate Path) | Initial License Exam 03/2005 Job Performance Measure JPM: S6 System: Emergency Diesel Generator JTA Task #: (Modifed)RO4032 Task | ||
==Title:== | |||
Load Diesel Generator (Alternate Path) | |||
KSA Ref: SF6.064.A4.06 PEO: RO: 3.9 SRO: 3.9 Operators Name: | KSA Ref: SF6.064.A4.06 PEO: RO: 3.9 SRO: 3.9 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 20 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,524: | Line 1,581: | ||
Page 7 of 7 Rev Date: 1/26/05 | Page 7 of 7 Rev Date: 1/26/05 | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S7 System: Nuclear Instrumentation System JTA Task #: NEW Task Title: Respond To Source Range Instrumentation Malfunction (Alternate Path) | Initial License Exam 03/2005 Job Performance Measure JPM: S7 System: Nuclear Instrumentation System JTA Task #: NEW Task | ||
==Title:== | |||
Respond To Source Range Instrumentation Malfunction (Alternate Path) | |||
KSA Ref: APE.032.AK3.01 PEO: RO: 3.2 SRO: 3.6 Operators Name: | KSA Ref: APE.032.AK3.01 PEO: RO: 3.2 SRO: 3.6 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 8 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 8 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
| Line 1,571: | Line 1,631: | ||
Initial License Exam 03/2005 Job Performance Measure JPM: S-8 System: Component Cooling Water System JTA Task #: (Bank NRC 2002) | Initial License Exam 03/2005 Job Performance Measure JPM: S-8 System: Component Cooling Water System JTA Task #: (Bank NRC 2002) | ||
Task Title: Shift CCW Pumps with CCW Pump Trip (ALTERNATE PATH) | Task | ||
==Title:== | |||
Shift CCW Pumps with CCW Pump Trip (ALTERNATE PATH) | |||
KSA Ref: APE.026.AK3.04 PEO: RO: 3.5 SRO: 3.7 Operators Name: | KSA Ref: APE.026.AK3.04 PEO: RO: 3.5 SRO: 3.7 Operators Name: | ||
Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 9 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | Performance Environment: PLANT CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 9 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be: | ||
Revision as of 16:45, 9 December 2019
| ML051250478 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/28/2005 |
| From: | Operations Branch IV |
| To: | TXU Power |
| References | |
| 50-445/05-301, 50-446/05-301 50-445/05-301, 50-446/05-301 | |
| Download: ML051250478 (195) | |
Text
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New)
Task
Title:
Determine Pressurizer Heater Operability KSA Ref: 2.1.33 PEO: RO: 3.4 SRO: 4.0 Operators Name:
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
Tools, Equipment, Job Aids, etc:
IPO-001A Plant Heatup from Cold Selected parameters from the plant, captured on Shutdown to Hot Standby Attachment 1 of this JPM, and a calculator.
Page 1 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
- Peer checking
- Three-way communications
- Phonetic alphabet
- Self checking
- ALM use
- Unit designators
- Conservative decision making
- Procedure place keeping
- Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Terminating Conditions:
Calculations are complete and an Operability determination has been made.
Page 2 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY STEP# SAT/
- Critical ELEMENT STANDARD NOTES UNSAT 1 Provide the candidate with the Note Start time.
initiating cue, the plant data sheet, and a copy of IPO-001A step 5.3.1.
2 Candidate correctly transfers See Attached Key data to the procedure.
3 Candidate performs See Attached Key calculations.
- 4 Candidate determines B/U Heater Groups A, operability B and Control Heater Group C are OPERABLE. B/U Heater Group D is INOPERABLE TASK COMPLETE. Note Completion time.
Page 3 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY INITIATING CUE:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determine the operability of the Pressurizer Heaters by performing step 5.3.1 of IPO-001A, Plant Heatup from Cold Shutdown to Hot Standby. Plant data is provided.
Plant Data Parameter Value from Last Reading Current Value Sheets (OPT-XXX) 1/1-PCPR1 Amps 580 580 1/1-PCPR Amps 0 200 1/1-PCPR2 Amps 565 565 1/1P-CPR3 Amps 0 176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0 193 PC point A6803A 559.8 560 PC point A6804A 0 176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB meter amperages or the plant computer values for heater amperages. The IPO allows both and there is no significant difference.
NOTE: The shaded parameters should NOT be used. The following problems exist with the shaded data:
- 2. 1EA1/2 amperage is not necessary to complete the calculations.
- 3. Data from the last set of logs should NOT be used for the Operability determination. Plant conditions could have changed significantly since the readings were taken. The IPO wants current plant data to determine Operability.
Page 4 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:
5.3 Heatup And Pressurization For MODE 3 Entry
[C]
This section describes steps for heatup and pressurization to enter MODE 3.
5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2)
A. Energize each group of heaters, as required, to measure current. _____
B. Record voltage and current AND calculate power for each group of heaters.
(Voltage x current x 0.001732 = power)
- Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _ x 0.001732 = 480.77 KW _____
V6303A A6801A
- Backup Heater Group B 1EB2- 1-II-PCPR2 or 487.1 x or _193 _ x 0.001732 = 162.8 KW _____
V6302A A6803A
- ! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 = _472.54_ KW _____
V6301A A6803A
- ! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 = __148.5__ KW _____
V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____
Page 5 of 5 Rev Date: 1/19/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY System: Conduct of Operations JTA Task #: (New)
Task
Title:
Calculate RCS Leakrate KSA Ref: 2.1.23 PEO: RO: 3.9 SRO: 4.0 Operators Name:
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
Tools, Equipment, Job Aids, etc:
ABN-103 Excessive Reactor Coolant Leakage Selected parameters from the plant, captured on Attachment 1 of this JPM, and a calculator.
Page 1 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
- Peer checking
- Three-way communications
- Phonetic alphabet
- Self checking
- ALM use
- Unit designators
- Conservative decision making
- Procedure place keeping
- Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
The plant is operating at 100% power, BOL. The crew is responding to the indications of a Reactor Coolant System leak. The Unit Supervisor has directed you to determine the size of the leak by performing Attachment 1 of ABN-103, Excessive Reactor Coolant Leakage. Plant data is provided.
Terminating Conditions:
Calculations are complete and a RCS Leak Rate determination has been made.
Page 2 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY STEP# SAT/
- Critical ELEMENT STANDARD NOTES UNSAT 1 Provide the candidate with the Note Start time.
initiating cue, the plant data sheet, and a copy of ABN-103 Attachment 1.
2 Candidate correctly transfers See Attached Key data to the procedure.
3 Candidate performs See Attached Key calculations.
- 4 Candidate determines Leak rate is determined operability to be approx 5 gpm.
See key for allowed variances in parameters TASK COMPLETE. Note Completion time.
Page 3 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY INITIATING CUE:
Parameter Value at 1429 Value at 1446 CHG FLO (F6138A) 140.7 143.8 LTDN FLO (F6134A) 130.9 130.9 FR-157 (RCP 1 Leak Off) 2.8 2.8 FR-156 (RCP 1 Leak Off) 2.8 2.8 FR-155 (RCP 1 Leak Off) 2.8 2.8 FR-154 (RCP 1 Leak Off) 2.8 2.8 VCT LVL (L6112A) 52.8 50.4 T0400A (Loop 1 Tave) 589.8 589.8 T0420A (Loop 2 Tave) 588.6 588.6 T0440A (Loop 3 Tave) 589.7 589.7 T0460A (Loop 4 Tave) 588.7 588.7 L6480A (PZR Level 1) 60 59.5 L6481A (PZR Level 2) 60 59.5 L6482A (PZR Level 3) 60 59.5 NOTE: There was no VCT auto make-up. There were no diversions of letdown flow during this period.
Page 4 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Attachment 1 CPSES UNIT 1 AND 2 PROCEDURE NO.
ABNORMAL CONDITIONS PROCEDURES MANUAL ABN-103 EXCESSIVE REACTOR COOLANT LEAKAGE REVISION NO 8 PAGE 22 OF 28 ATTACHMENT 1 PAGE 2 OF 2 PARAMETER INITIAL VALUE FINAL VALUE AVERAGE VALUE TIME (-) __1429____ + __1446____ = ____17___ t
- CHRG FLO __140.7____ + ___143.8___
(F6138A) ( __________284.5____________) = __142.25___ GPM 2
- LTDN HX OUT FLOW ___130.9__ + ___130.9___
(F6134A) (__________261.8______________) = __130.9__ GPM 2
- RCP SEAL LKOFF FLO ___11.2______ + ____11.2____
(FR-157, 156, 155 (___________5.6______________.) = ___11.2___ GPM
& 154) 2
- VCT LVL (_52.8___ - __50.4___)(19.4gal/%)
(L6112A) (_________46.56__________________) = __2.74___ GPM
(__17____)t in MIN)
RC LOOP 1-4 TAVE (________ - ________)(93gal/°F)
(T0400A,T0420A,T0440A ( _____________0__________________) = ____0___ GPM OR T0460A) (_____17_____)t in MIN)
PRZR LVL (_60___ - ___59.5__)(65gal/%)
(L6480A,L6481A OR ( _________32.5___________________) = ___1.9___ GPM L6482A) (__17_____)t in MIN)
Shaded areas NOT REQUIRED CALCULATION FORMULA Flow adjust method:
(+) ________ -________ -________ -( )_________ +( )________ = ______GPM CHRG FLO LTDN FLOW SEAL LKOFF TAVG ADJUST PRZR LVL RCS LEAKAGE FLO ADJUST OR VCT level adjust method
( )__2.74___ -( )_0___ +(+ )__1.9__ = __4.65_GPM Allowed (4.1 VCT LVL ADJUST TAVG - 5.2)
Allowed (2.5-3.0) ADJUST PRZR LVL RCS LEAKAGE ADJUST Allowed (1.6 -
2.2)
- Either Chrg Flo, Ltdn Flow, and RCP Seal Lkoff Flo (Flow adjust method) OR VCT Lvl (VCT level adjust method) should be used, but NOT both.
Page 5 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 6 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 System: Equipment Control JTA Task #: (New)
Task
Title:
Check Completed Surveillance Procedure for Accuracy KSA Ref: 2.2.12 PEO: RO: 3.0 SRO: 3.4 Operators Name:
Performance Environment: CLASSROOM CONTROL ROOM SIMULATOR Performance Method: PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operators performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluators Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
Tools, Equipment, Job Aids, etc:
OPT-207A Service Water System Selected parameters from the plant, captured on Attachment 1 of this JPM..
Page 1 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
- Peer checking
- Three-way communications
- Phonetic alphabet
- Self checking
- ALM use
- Unit designators
- Conservative decision making
- Procedure place keeping
- Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207 A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
Terminating Conditions:
The OPT has been reviewed and 2 of the three errors have been correctly identified.
Page 2 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 STEP# SAT/
- Critical ELEMENT STANDARD NOTES UNSAT 1 Provide the candidate with the Note Start time.
initiating cue.
2 Candidate reviews completed See Attached Key data sheet.
- 3 Candidate determines the Two of the three errors NOTE: The errors in the completed OPT. are identified. See vibration alert Attached Key for the error should be three errors. noted in 4 places.
It is critical that the ODA -308 Tracking LOCAR be noted. The others are less TASK COMPLETE. Note Completion time. important.
Page 3 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 INITIATING CUE:
The plant is operating at 100% power, BOL. You are the CPC RO. The Unit Supervisor has directed you to review the just completed OPT-207A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
Page 4 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 . Completed OPT.
NOTE TO EXAMINER: Ensure candidate is provided the filled out OPT. This must be done manually.
Page 5 of 13 Rev Date: 1/25/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 ROUTINE TEST-SURVEILLANCE page 1 WORK ORDER Resp. Group: POSS OPS SHIFT MANAGER WO # : 5-05-505395-AA Tag #: CP1-SWAPSW-01 Unit: 1 Train (Sys) : A See Equipment List System: SW Train (Elect) : NA More Tags and Locations Bldg/Elev : SI 0796 Room: X-275 Tag Desc: STATION SERVICE WATER PUMP 1-01 Compt Quality: Y Safety Class: 3 SEIS CAT: I MOV XI: N PVO: A EQ: M
- SURVEILLANCE
SUMMARY
DESC: OPT-207A, TRN A STATION SERVICE WATER PMP/VLV OPERBILITY TEST Compliance Date/Time : 03/21/2005 10:05 Source Doct : IST Violation Date/Time : 04/05/2005 10:05 Test Section : 8.2 Adj Schedule Date/Time: __/__/____ Test Procedure: OPT-207A Work Week Test Type : FI Frequency : 92 Days Last Performed Date/Time : 01/09/2005 10:005 Last Perf. WO : 5-04-505395-AE
- SPECIAL INSTRUCTIONS***************************************************
Permit-RWP : N #: ____________________ Confined Space : N #: ____________________
Fire Permit : N #: ____________________ Combust. Loading : N #: ____________________
Fire Impair : N #: ____________________ Cleanliness Class: C Housekeeping Zone: IV Clearance/MTD : N #: ____________________ STA-720 Reqd : No Barrier Impair Form: No Postwork Testing Reqt: N Ventilation Pressure Boundary Breach: No
- APPROVAL/AUTHORIZATION TO START***************************************
Ops-Shift Manager Technical : _____________________________ Date: __/__/____
Radiation Protection : _____________________________ Date: __/__/____
Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager Safety : _____________________________ Date: __/__/____
Revisions 1 2 3 4 5 6
POSS ______ ______ ______ ______ ______ ______
QC ______ ______ ______ ______ ______ ______
ANII ______ ______ ______ ______ ______ ______
RP ______ ______ ______ ______ ______ ______
Ops SM ______ ______ ______ ______ ______ ______
- INITIAL SURVEILLANCE RESULTS**********************************************
As Found Condition: _____ Unsat (Sign&Date) ____________________________ Date: __/__/____
Shift Manage Informed (Sign&Date) _________________________________ Date: __/__/____
- FINAL SURVEILLANCE RESULTS***************************************************
Duration (Est/Act) 7 / ___ Start Time ____ Date: __/__/____
Test Completed: ___ Sat ___ Unsat Tech Spec Acceptance Checked: ___ Sat ___ Unsat Test Completed by: ________________________________________ Time: ____ Date: __/__/____
- SURVEILLANCE ACCEPTANCE*******************************************************
Tech Spec Acceptance Criteria Met: ___ Sat ___ Unsat Shift Manager: ________________________________________ Date: __/__/____ Time: ____
- SURVEILLANCE REVIEWS********************************************************
Ops-Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager : _____________________________ Date: __/__/____
Ops-Shift Manager : _____________________________ Date: __/__/____