IR 05000336/2005004: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML053420503 | |||
| issue date = 11/09/2005 | |||
| title = Errata for Millstone Power Station Unit 2 and Unit 3 - NRC Integrated IR-05000336-05-004 and IR-05000423-05-004 | |||
| author name = Krohn P | |||
| author affiliation = NRC/RGN-I/DRP/PB6 | |||
| addressee name = Christian D | |||
| addressee affiliation = Dominion Resources, Inc | |||
| docket = 05000336, 05000423 | |||
| license number = DPR-065, NPF-049 | |||
| contact person = Krohn P, RI/DRP/PB6/610-337-5120 | |||
| document report number = ERRATA, IR-05-004 | |||
| package number = ML053420515 | |||
| document type = Inspection Report, Letter | |||
| page count = 4 | |||
}} | |||
{{IR-Nav| site = 05000336 | year = 2005 | report number = 004 }} | |||
=Text= | |||
{{#Wiki_filter:ber 9, 2005 | |||
==SUBJECT:== | |||
ERRATA FOR MILLSTONE POWER STATION UNIT 2 AND UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000336/2005004 AND 05000423/2005004 | |||
==Dear Mr. Christian:== | |||
Please replace page A-2 of the Attachment: Supplemental Information, to the subject inspection report transmitted to you on November 7, 2005. The purpose of this change is to correct the items in the Section entitled List of Items Opened, Closed and Discussed. | |||
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosures, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Should you have any questions concerning this change, we will be pleased to discuss them with you. | |||
Sincerely, | |||
/RA/ | |||
Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 Enclosure: Page A-2 of Attachment entitled Supplemental Information to Inspection Report 05000336/2005004 and 05000423/2005004 | |||
Mr. | |||
}} | |||
Revision as of 23:34, 7 December 2019
| ML053420503 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/09/2005 |
| From: | Paul Krohn NRC/RGN-I/DRP/PB6 |
| To: | Christian D Dominion Resources |
| Krohn P, RI/DRP/PB6/610-337-5120 | |
| Shared Package | |
| ML053420515 | List: |
| References | |
| ERRATA, IR-05-004 | |
| Download: ML053420503 (4) | |
Text
ber 9, 2005
SUBJECT:
ERRATA FOR MILLSTONE POWER STATION UNIT 2 AND UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000336/2005004 AND 05000423/2005004
Dear Mr. Christian:
Please replace page A-2 of the Attachment: Supplemental Information, to the subject inspection report transmitted to you on November 7, 2005. The purpose of this change is to correct the items in the Section entitled List of Items Opened, Closed and Discussed.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosures, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this change, we will be pleased to discuss them with you.
Sincerely,
/RA/
Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 Enclosure: Page A-2 of Attachment entitled Supplemental Information to Inspection Report 05000336/2005004 and 05000423/2005004
Mr.