| title = 03/16/09 TVA, Presentation Slides for Browns Ferry, Unit 1
| title = TVA, Presentation Slides for Browns Ferry, Unit 1
| author name = Brown E
| author name = Brown E
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2

Revision as of 02:05, 7 December 2019

TVA, Presentation Slides for Browns Ferry, Unit 1
ML090770162
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/03/2009
From: Ellen Brown
Plant Licensing Branch II
To:
Brown E, NRR/DORL, 415-2315
Shared Package
ML090770387 List:
References
TAC ME0438
Download: ML090770162 (8)


Text

OJ

....,

o Z :E JJ  ::::J

() en S:S:

~ CD

~ CD  ::;i~

('") ~ tu ....,

r  ::J  ::::J ....,

-L to en'<

....0)1 --

r-+

.........

I\)~ --

8~

o::::J >>....,

COeD CD 11 <

tu

--

-::J

...... 11 c::

CD

  • *

(J) (J) c C 0 0 3

,..... 3

,.....

--

,..... --

,.....

Q.) Q.)

- -

""C en Q.) ("")

("")  ::::r CD Q.) a.

(Q

" c CD -

CD

>

CO 0 C CD

<

CD ""C  :::J

a. a.
Q.) Q)

-- ,.....

CD CD

~

c en cr 3--

,.....

,.....

Ol en o

r.

eo a.

c CD C

-c a.

Ol

,.....

eo

Revised Schedule

  • January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates
  • Areva and TVA have agreed on approach to improve schedule

- Preliminary core design work will be eliminated

- Final core design has commenced using best available energy plan estimate for current cycle

- TVA review time for selected reload inputs and analyses will be accelerated

Revised Schedule (cant)

  • Areva will deliver all reload documentation needed to support submittal by 10/23/09
  • TVA will require time to prepare final submittal package and complete internal reviews and approvals

- TVA will commit to a submittal date of 12/11/09

en c

c 3

--

,......

,......

Dl

-c Dl o

="

Dl co CD o

<

CD

~

<

--

CD

~

LAR Contents

  • LAR will be a complete package

- No supplemental information planned to be submitted

  • Will include the following reports:

- Thermal Hydraulic Design Report

- Mechanical Design Report

- ANP-2637 (BWR Licensing Methodology Compendium)

- Fuel Cycle Design Report

- Reload Safety Report

  • Will not submit the LOCA break spectrum report

- Will provide justification as to unit 1 applicability

  • Will include the following Tech Spec related changes:

- SLMCPR Tech Spec (if required)

- Tech Spec 5.6.5 update to add Areva analytical methods

- Tech Spec Bases page changes

LAR Contents (cant)

  • LAR will also address the eleven items requested by NRC in the draft Summary of Information Request

- Request NRC formally issue final as soon as possible

- LAR will address the prior BFN 2/3 fuel related EPU RAls

- Will also address the RAls from the Brunswick transition