ML110820737: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML110820737 | | number = ML110820737 | ||
| issue date = 03/21/2011 | | issue date = 03/21/2011 | ||
| title = | | title = Summary of Meeting Between NRC and D. C. Cook Emergency Preparedness and Regulatory Affairs to Discuss the Upcoming March 2011 Emergency Preparedness Exercise | ||
| author name = Dickson B | | author name = Dickson B | ||
| author affiliation = NRC/RGN-III/DRS | | author affiliation = NRC/RGN-III/DRS | ||
Revision as of 08:57, 6 December 2019
| ML110820737 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/21/2011 |
| From: | Billy Dickson Division of Reactor Safety III |
| To: | Weber L Indiana Michigan Power Co |
| References | |
| Download: ML110820737 (36) | |
Text
U ml Participation Drill - Plume Only
- March 1,2011
- Bridgman, MI "PA
A unit ofAmerican Electric Power Donald C. Cook Nuclear Plant USNRC Region III Incident Response Program
oo ucer ln Safety and Human Performance Guiding Principles
,,-,a dhu a errors 1e.
- 2. !d hip and
,-accuotaility prevent
- 3. an safety and human error duction into our work.
4.
Personal Protective Equipment
" TSC and Damage Control Teams dispatched from the OSC require:
Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.
u-u El 0 OrientationGoals
- Plant Overview
- Organizational Match-ups eFacility Locations
- NRC Incident Response Team Entrance
- Logistics 4.
.Ed D.C. Cook Nuclear Plant
- .**Two- 1100 Mw Four Loop Westinghouse PWR
NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan
Organizational Overlay
- Aligned positions as closely as possible and arranged seating accordingly
- Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.
U Site Team NRC Region III Site Team Director Site: D.C. COOK Deputy Site Team DatelShift: March , 2011 Anne Boland Director I Gary Shear NRC GLM at FEMA RRCC N/A Site Team Rev. 1 - January 28, 2011 Evaluator/Controller Desiree Smith
NU
- itA T*m NIr*ctnr Integrated Organizational Chart Ann;Boland NRC Region III Site Team Emergency Director Dept Site Team Dir D.C. COOK EOF Emergency Response Team Shane Lies IAssistantGary Shear ED Randy Keppeler 1
March 1, 2011 TA Specialist/
Chuck Zoia Radiation Safety Engineering Design Coordinator Manager (TSC)
Madan Goel Tony Go Communicator: Radiation Assessment Jim Neurauter Coordinator Boadwriter Milt Paquette Tony McMutuary NRC GLM at FEMA RRCC Dose Assessor Wayne Slawinski N/A Env Assessment Coordinator David Raye Mike Allard Site Team Rev. 1 - February 19, 2011 Evaluator/Controller Desiree Smith
EOF/JIC Sequence of Events
" AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room
" NRC will await phone call for deployment to briefing area
" When notified, NRC will be escorted to East Entrance and process into briefing area
" Group briefing provided by Assistant Emergency Director L Current emergency classification o, Reason for classification
" Current plant status
" Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status o Challenges
" Questions from the NRC team
" AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts
" Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts
AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
AEP NGG Building Front of building 4/7 I S
---
r-I
-
U-NGG First Floor North TOVVER
Front Lobby Inside JIC/EOF Entrance Briefing Room for the IRT EOF/JIC EOF Layout Emergency U PBX Room I1 Operations II Pull-Down Moio II Pull-Down 11 Facility Screen 2o90Bndq. Monitor Reg Affairs Coord Computer AnalystRck r* Including IMgr's 2919 2911 *'ge, IRT Scheduling and Planning Mgr.
IRT Telecom
Emergency Operations Facility Dose Assessment Facility JIC Layout Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 SUPPORT MEDIA WORK AREA STAFF 5890 FRE S FF O
ý IMo RESTROOM
Joint Information Center JIC Media Area Media Work Area Looking back towards BOB Lobby Area
JIC Auditorium Uj TSC Sequence of events
" Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building.
" When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member.
" IRT receives briefing from the Assistant Site Emergency Coordinator
- Current emergency classification
- Reason for classification
" Current plant status
" Status of radiological release if any
- Current protective action recommendation, if any
- Mitigative actions - description and status
- Challenges
- Questions from the NRC IRT
U Cook3Nula ln ieLyu 7/ AMMUCM E&MCUM POW=
USNRC Residents Office is on the Fourth Floor in the Northeast corner
.Maintenance
U TSC I 1202 1 203 TSCReference Material Asst.
SEC EROS LC, i* COMMUNICATIONS Security PET PET Director Training Operations ROOM
_SPP 21150-SFI-216 1063 ý STA 1302
.E CABINET" Asst. 1451 STI STA RAC HOTLINE HOTLINE (1824) 186 ENS HPN 1088 RAC 1032 FTS-2001 FTS-2001 SEC Phone Jack 371-6772 371-6779 1034 Computer NRC Analyst TSC Drawngs 1204 1621 1030 Public Affairs Maint. Reactor Hotline RSC (2) DTABL Eng'r. Physics DAP (1)
Computer PLANT EVALUATION TEAM ROOM 1092 Administrative 2 Team Boardwnter 2080 Coordinator IN Coordinator Brdge [ odge
.I 8
FAX Operator/
Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator PMCL (3R (3) Protective Measures Coordinator Link FTS-200t-2 (4) Reactor Safety Coordinator Link Conference 371-6775 Table RSCL (46r FTS-200T-371-6776 ENS HPN FTS-2001 FTS-2001 37 6772 371-6779 P[nmary Copier S 1683 1682
U Logistics - GPS addre sses D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels
N Southwest Michigan
- Driving Distance to Plant
" Lisle, II 105 miles
" New Buffalo, MI 15 miles
" South Bend, IN 35 miles
" Stevensville, MI 5 miles
" St. Joseph, MI 11 miles
- Driving Distance to the EOF/JIC Buchanan, MI U Cook Nuclear Plant 19 miles U Lisle, II 112 miles U New Buffalo, MI 27 miles U South Bend, IN 18 miles U Stevensville, MI 24 miles U St. Joseph, MI 22 miles
Questions?