ML11224A059: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML11224A059 | | number = ML11224A059 | ||
| issue date = 08/09/2011 | | issue date = 08/09/2011 | ||
| title = | | title = OL - FW: NRC PM Open Items List 8-10-11.docx | ||
| author name = | | author name = | ||
| author affiliation = - No Known Affiliation | | author affiliation = - No Known Affiliation | ||
Revision as of 02:18, 6 December 2019
| ML11224A059 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 08/09/2011 |
| From: | - No Known Affiliation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML11224A059 (6) | |
Text
WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
Sent: Tuesday, August 09, 2011 9:55 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D
Subject:
FW: NRC PM Open Items List 8-10-11.docx Attachments: NRC PM Open Items List 8-10-11.docx For next phone call.
Note the new bridge line at top of page.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 462 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF21BC4765)
Subject:
FW: NRC PM Open Items List 8-10-11.docx Sent Date: 8/9/2011 9:54:36 AM Received Date: 8/9/2011 9:54:39 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 309 8/9/2011 9:54:39 AM NRC PM Open Items List 8-10-11.docx 30797 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Page 1 of 4 NRC PM Open Items List 8/10/11 (423) 751-7777 ID 4233652004#
No. Description Status Additional Comments Resp Org/Person
- 1. Cyber Security Plan/Controls and NRC TI issued NRC Inspection in 2011 Heinrich/Snyder Implementation TBD (Bryan)
To be discussed at the next ACRS meeting (October NRC Table 5th - closed portion).
Top/Pilot Oct 2011 Procedures complete 9/30/11 Inspection Dec 2011
- 1. Item 3 for GA-ESI RM-1000 RAD 2. 9/9/11
- Item 1 GA/ESI is revising their CGI program but (Smith)
Monitors. 3. TBD needs time to be able to provide objective
- 2. GA proprietary, non-proprietary and 4. TBD evidence of the program changes. We will order affidavits for withholding submittals parts to facilitate GA developing objective
(~12 documents.) evidence that their program is in compliance with
- 3. NRC comments on procedures to NRC regulations.
GA-ESI
- Item 2 - 3 additional document requests from NRC
- 4. RM1000 EMI meeting/telecom Civil via email on 7/6/11. PROP versions from the original request are ready for GA to send to TVA
- Item 3 revise GA-ESI procedures for CGI dedication
- 3. WRAG Meeting 8/24/11 Cyber, Japan, Status, Schedule, PERT chart, (onsite) 10CFR140.11(a)(4) (financial - SSER OI 25 - sidebar)
Page 2 of 4 No. Description Status Additional Comments Resp Org/Person
- 4. Complete Implementation (Hemmer) Diesel Diesel is onsite, need support equipment Hemmer 8/1/11 (Smith)
Pump Additional clarification to Phase I actions will be Relocation needed. Fleet wide issue.
11/1/11 Looking for building qualifications. What is One substantial? May use NEI to answer.
procedure to Issue 8/26/11 Inspection -
Feb 2012 Phase I commitments 10/1/11
- 5. Document Control Issues for two letters TBD TVA/Bechtel to provide non-proprietary version of Licensing/Boyd documents that can be released to the public (10/5, 10/21, & 10/29). TVA to provide revised letter that says non-prop once prop documents removed.
Confirm A102 in ADAMS.
TBD telecom follow-up telecom on offsite dose calculation method
Page 3 of 4 No. Description Status Additional Comments Resp Org/Person
- 8. Fire Protection Report Questions 8/15/11 FPR revision ENG/Hilmes regarding OMA (Crouch) 8/9/11 Group 6 rough draft RAIs received via email 6/21/11.
Pull date back if possible. Additional questions relayed on 7/20/11 telecom. May require a supplement.
TBD OMA clarifications (add clarification to FPR rev, if necessary)
TBD Pre-mtg for audit plan TBD Audit 8/31/11 Technical meeting
- 9. IST Tech Spec Change 8/10/11 Pre-submittal meeting week of 7/11/11. In TVA Corporate concurrence. Licensing (Shea)
- 10. Tech Spec Revisions from latest T/S Sept, 2011 CSST A & B - discretionary Licensing/Elton markup and NRC Review comments (Bryan)
Aug, 2011 I-131 DEI Aug, 2011 Diesel Generator Frequency 8/9/11 Issue a complete revision F
- 11. ASME III to XI transition 8/12/11 When does ISI program begin with partial plant N-3? Eng/Helms Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation.
- 12. ACRS Topics 10/5/11 Cyber Security,
- 13. SSER 22/23 Open Items Response 8/15/11 7/22 is the target date for the next SSER update. The expanded HH list and its status is covered periodically.
internal Telecom to be set up on degraded voltage - item 30 telecom
Page 4 of 4 No. Description Status Additional Comments Resp Org/Person
- 14. Transient Analysis issues ENG/Koontz WEC/Morgan Boron dilution RAI response Week of Question on RG revision and modes 3, 4, & 5 ...
8/29/11 to FSAR is clear as to why modes 1, 2, & 6 are limiting discuss
- 15. FSAR A105 8/15/11 Cut-off date of 8/5/11 for change requests. Lic/Stockton
- 17. Develop list of planned License 1. 9/1/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. 8/15/11 baskets, cyber security, physical security, PAD (Bryan)
Requests (Crouch) 3. TBD 4.0
- 2. Request Rod Drop deviation - place in A105
- 3. NRR to review current exemptions
- 18. Verify Tech Spec Setpoints match calcs 9/1/11 2 SSD remaining to be issued. Eng/Hilmes (Bryan)
TS certification TBD
- 19. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/
Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)
- 20. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
- 21. Submit final as-constructed FSAR 7/1/12 Licensing/
figures Stockton
- 0. Discretionary Actions
- 1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch)
- 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Crouch) Related information on GSI 194 may need input
- 4. Letter to notify NRC when Vital Area 11/1/11 Security Plan Update - Boundary to be restored by Lic/Crouch Boundary returned to original location 9/30/11
Waiting for NRC concurrence. Webber ISI/Tinley