{{#Wiki_filter:°> UNITED STATES NUCLEAR REGULATORY  
{{#Wiki_filter:°>                         UNITED STATES
COMMISSION
                  NUCLEAR REGULATORY COMMISSION
WASHINGTON, D. C. 20555 July 3, 1986 TO: ALL NON-POWER  
                          WASHINGTON, D. C. 20555 July 3, 1986 TO:         ALL NON-POWER REACTOR LICENSEES AUTHORIZED TO USE HEU FUEL
REACTOR LICENSEES  
SUBJECT:   CRITERIA FOR UNIQUE  
AUTHORIZED  
TO USE HEU FUEL SUBJECT: CRITERIA FOR UNIQUE  


==PURPOSE==
==PURPOSE==
EXEMPTION  
EXEMPTION FROM CONVERSION FROM THE
FROM CONVERSION  
            USE OF HEU FUEL (GENERIC LETTER 86-12)
FROM THE USE OF HEU FUEL (GENERIC LETTER 86-12)10 CFR 50.64 (51 FR 6514) provides for a "unique purpose" exemption from the requirement to convert from the use of high enriched uranium (HEU) fuel, provided the licensee presents a Justification that is accepted by the Commission.
                                                                                from
10 CFR 50.64 (51 FR 6514) provides for a "unique purpose" exemption         (HEU)  fuel, the requirement to convert from the use of         high enriched uranium that is accepted  by  the provided the licensee presents a Justification                         acceptable Commission. Amended 10 CFR 50.2 gives broad definitions for for those unique purposes. This letter provides        more  specific  guidance licensees who believe they might qualify for such an exemption.


Amended 10 CFR 50.2 gives broad definitions for acceptable unique purposes.
or The definition states that a unique purpose means a project, program,          the  use commercial activity that cannot be reasonably        accomplished  without of the  following  four  purposes:
of HEU fuel, and may include one or more
1)    A specific experiment, program, or commercial activity (typicallyand long-term) that significantly serves the U.S. national interest cannot be accomplished without the use of HEU fuel;
                                                                                      of
2)    Reactor physics or reactor development based explicitly on the use HEU fuels;
3)    Research projects based on neutron flux levels or spectra attainable only with HEU fuel; or intended
4)    A reactor core of special design that could not perform its function without using HEU fuel.


This letter provides more specific guidance for those licensees who believe they might qualify for such an exemption.
might qualify The definition provides guidance to licensees who believe they that best for a unique purpose exemption to develop a basis for exemption                 that the fits each unique situation, and which would provide a Justification      necessarily Commission could find acceptable. These four purposes are notexemption.


The definition states that a unique purpose means a project, program, or commercial activity that cannot be reasonably accomplished without the use of HEU fuel, and may include one or more of the following four purposes: 1) A specific experiment, program, or commercial activity (typically long-term)
the only ones that might form the basis for a unique purpose                   10 CFR
that significantly serves the U.S. national interest and cannot be accomplished without the use of HEU fuel;2) Reactor physics or reactor development based explicitly on the use of HEU fuels;3) Research projects based on neutron flux levels or spectra attainable only with HEU fuel; or 4) A reactor core of special design that could not perform its intended function without using HEU fuel.The definition provides guidance to licensees who believe they might qualify for a unique purpose exemption to develop a basis for exemption that best fits each unique situation, and which would provide a Justification that the Commission could find acceptable.
  However, the following discussion relates to the four given in the
 
  50.2 definition.
These four purposes are not necessarily the only ones that might form the basis for a unique purpose exemption.
 
However, the following discussion relates to the four given in the 10 CFR 50.2 definition.


==Purpose==
==Purpose==
number 1 is intended to relate primarily to technical activities closely coupled to the national interest, which might include preeminence in a specific field of research or assurance of a domestic supply of some essential product of reactor operation.
number 1 is intended to relate primarily to technical activities preeminence closely coupled to the national interest, which might include               of some supply in a specific field of research or assurance of a domestic in the definition essential product of reactor operation. This was included                          (NRC)
  of "unique purpose" to help provide the Nuclear Regulatory Commission wide latitude of discretion like the standards in 10 CFR          50.41.


This was included in the definition of "unique purpose" to help provide the Nuclear Regulatory Commission (NRC)wide latitude of discretion like the standards in 10 CFR 50.41.8607030269 ZA D7I LTIZ  
ZA
-2 -Of the four purposes identified, it is intended that numbers (2) and (4) provide opportunity to perform new reactor projects whose objectives were to learn about or develop reactor concepts for which parameters of HEU were a necessary component.
                                                                  8607030269               D7I
                                                                                      LTIZ


Examples might be a unique compact reactor heat source, a compact pulsing reactor with minimal distortion of fast neutron spectra, or a comparison of HEU and low enriched uranium (LEU) operating cores for assessing the potential for conversions of non-power reactor cores.
- 2 -
Of the four purposes identified, it is intended that numbers (2) and
(4) provide opportunity to perform new reactor projects whose objectives were to learn about or develop reactor concepts for which parameters of HEU were a necessary component. Examples might be a unique compact reactor heat source, a compact pulsing reactor with minimal distortion of fast neutron spectra, or a comparison of HEU and low enriched uranium (LEU) operating cores for assessing the potential for conversions of non-power reactor cores.


==Purpose==
==Purpose==
Line 49: Line 55:


==Purpose==
==Purpose==
number 4 might also pertain to a non-power reactor that was designed and is operated to take maximum advantage of the unique characteristics of HEU fuel and where the substitution of any available LEU fuel could not be made without major facility modification to accommodate such things as a larger core, different coolant systems, or major changes in its primary mode of operation.
number 4 might also pertain to a non-power reactor that was designed and is operated to take maximum advantage of the unique characteristics of HEU fuel and where the substitution of any available LEU
 
fuel could not be made without major facility modification to accommodate such things as a larger core, different coolant systems, or major changes in its primary mode of operation. An example would be a core with specific physical size limits that currently uses near-maximum uranium density in its fuel.
An example would be a core with specific physical size limits that currently uses near-maximum uranium density in its fuel.An application for exemption from conversion from HEU fuel must be submitted to the Director, Office of Nuclear Reactor Regulation, in accordance with the schedule given in the published regulation.
 
The application should specify the date when acceptable LEU or medium enriched uranium (MEU) fuel is expected to be available, and a conversion schedule provided where appropriate.


The NRC expects that only very few licensees will qualify for exemption.
An application for exemption from conversion from HEU fuel must be submitted to the Director, Office of Nuclear Reactor Regulation, in accordance with the schedule given in the published regulation. The application should specify the date when acceptable LEU or medium enriched uranium (MEU) fuel is expected to be available, and a conversion schedule provided where appropriate. The NRC expects that only very few licensees will qualify for exemption. The following are examples of items which should be considered and developed in detail, as appropriate, in any application for exemption:
      (1) Identification and outline of the program
      (2) Explanation of the value of the program and any special experiments to the U.S. national interests
      (3) Discussion of how the achievement of significant and competitive results is dependent on such factors as the following:
            (a neutron fluence (e.g., power level and operating schedule)
              b neutron flux density (e.g., power level, core size)
              c neutron spectra d signal-to-noise ratio in the experimental results e) operating and refueling schedule for the reactor f) operating costs (g) waste management
      (4) Discussion of program accomplishment with available LEU fuels, and specification of LEU fuel characteristics required to permit continuation of the programs with no significant decrement in accomplishment.


The following are examples of items which should be considered and developed in detail, as appropriate, in any application for exemption:
- 3 -
(1) Identification and outline of the program (2) Explanation of the value of the program and any special experiments to the U.S. national interests (3) Discussion of how the achievement of significant and competitive results is dependent on such factors as the following: (a neutron fluence (e.g., power level and operating schedule)b neutron flux density (e.g., power level, core size)c neutron spectra d signal-to-noise ratio in the experimental results e) operating and refueling schedule for the reactor f) operating costs (g) waste management
This letter is for guidance only in interpreting 10 CFR 50.64. No response or action is necessary other than that required by the regulation to apply for a unique purpose exemption.
(4) Discussion of program accomplishment with available LEU fuels, and specification of LEU fuel characteristics required to permit continuation of the programs with no significant decrement in accomplishment.


-3 -This letter is for guidance only in interpreting
Questions should be addressed to Mr. Robert E. Carter at (301) 492-8206.
10 CFR 50.64. No response or action is necessary other than that required by the regulation to apply for a unique purpose exemption.


Questions should be addressed to Mr. Robert E. Carter at (301) 492-8206.Original signed by Prank J, Kiregl8A Frank J. Miraglia, Director Division of PWR Licensing-B
Original signed by Prank J, Kiregl8A
                                    Frank J. Miraglia, Director Division of PWR Licensing-B
DISTRIBUTION:
DISTRIBUTION:
Central File-NRC PDRs Local PDR SSPD Reading PNoonan RCarter DTondi HBerkow OELD FMiraglia HYoung, ER, DO*SEE PREVIOUS DPWRL-B:SSPD*
Central File- NRC PDRs Local PDR
PNoonan 06/19/86)E V, 01¢0 /s CONCURRENCE  
SSPD Reading PNoonan RCarter DTondi HBerkow OELD
SHEET DPWRL-B:SSPD*  
FMiraglia HYoung, ER, DO
DPWRL-B:SSPD*
              )E   V, 01¢0/s
RCarter:ac DTondi 06/19/86 06/20/86 DPWRL-B:SSPD*
*SEE PREVIOUS CONCURRENCE SHEET
HBerkow 06/20/86 OELD*TDorian 06/24/86}}
DPWRL-B:SSPD* DPWRL-B:SSPD* DPWRL-B:SSPD*      DPWRL-B:SSPD* OELD*
PNoonan        RCarter:ac     DTondi           HBerkow      TDorian
06/19/86       06/19/86      06/20/86         06/20/86     06/24/86}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 02:49, 24 November 2019

NRC Generic Letter 1986-012: Criteria for Unique Purpose Exemption from Conversion from the Use of HEU Fuel
ML031150243
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Clinch River, Crane
Issue date: 07/03/1986
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
References
GL-86-012, NUDOCS 8607030269
Download: ML031150243 (3)


°> UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 July 3, 1986 TO: ALL NON-POWER REACTOR LICENSEES AUTHORIZED TO USE HEU FUEL

SUBJECT: CRITERIA FOR UNIQUE

PURPOSE

EXEMPTION FROM CONVERSION FROM THE

USE OF HEU FUEL (GENERIC LETTER 86-12)

from

10 CFR 50.64 (51 FR 6514) provides for a "unique purpose" exemption (HEU) fuel, the requirement to convert from the use of high enriched uranium that is accepted by the provided the licensee presents a Justification acceptable Commission. Amended 10 CFR 50.2 gives broad definitions for for those unique purposes. This letter provides more specific guidance licensees who believe they might qualify for such an exemption.

or The definition states that a unique purpose means a project, program, the use commercial activity that cannot be reasonably accomplished without of the following four purposes:

of HEU fuel, and may include one or more

1) A specific experiment, program, or commercial activity (typicallyand long-term) that significantly serves the U.S. national interest cannot be accomplished without the use of HEU fuel;

of

2) Reactor physics or reactor development based explicitly on the use HEU fuels;

3) Research projects based on neutron flux levels or spectra attainable only with HEU fuel; or intended

4) A reactor core of special design that could not perform its function without using HEU fuel.

might qualify The definition provides guidance to licensees who believe they that best for a unique purpose exemption to develop a basis for exemption that the fits each unique situation, and which would provide a Justification necessarily Commission could find acceptable. These four purposes are notexemption.

the only ones that might form the basis for a unique purpose 10 CFR

However, the following discussion relates to the four given in the

50.2 definition.

Purpose

number 1 is intended to relate primarily to technical activities preeminence closely coupled to the national interest, which might include of some supply in a specific field of research or assurance of a domestic in the definition essential product of reactor operation. This was included (NRC)

of "unique purpose" to help provide the Nuclear Regulatory Commission wide latitude of discretion like the standards in 10 CFR 50.41.

ZA

8607030269 D7I

LTIZ

- 2 -

Of the four purposes identified, it is intended that numbers (2) and

(4) provide opportunity to perform new reactor projects whose objectives were to learn about or develop reactor concepts for which parameters of HEU were a necessary component. Examples might be a unique compact reactor heat source, a compact pulsing reactor with minimal distortion of fast neutron spectra, or a comparison of HEU and low enriched uranium (LEU) operating cores for assessing the potential for conversions of non-power reactor cores.

Purpose

number 3 is intended to provide the opportunity to continue using HEU fuel if converting to available LEU fuel would change neutron flux densities or spectra, or other essential radiation parameters, so that the fundamental reason for conducting the reactor-based program would be lost, or irreparably compromised.

Purpose

number 4 might also pertain to a non-power reactor that was designed and is operated to take maximum advantage of the unique characteristics of HEU fuel and where the substitution of any available LEU

fuel could not be made without major facility modification to accommodate such things as a larger core, different coolant systems, or major changes in its primary mode of operation. An example would be a core with specific physical size limits that currently uses near-maximum uranium density in its fuel.

An application for exemption from conversion from HEU fuel must be submitted to the Director, Office of Nuclear Reactor Regulation, in accordance with the schedule given in the published regulation. The application should specify the date when acceptable LEU or medium enriched uranium (MEU) fuel is expected to be available, and a conversion schedule provided where appropriate. The NRC expects that only very few licensees will qualify for exemption. The following are examples of items which should be considered and developed in detail, as appropriate, in any application for exemption:

(1) Identification and outline of the program

(2) Explanation of the value of the program and any special experiments to the U.S. national interests

(3) Discussion of how the achievement of significant and competitive results is dependent on such factors as the following:

(a neutron fluence (e.g., power level and operating schedule)

b neutron flux density (e.g., power level, core size)

c neutron spectra d signal-to-noise ratio in the experimental results e) operating and refueling schedule for the reactor f) operating costs (g) waste management

(4) Discussion of program accomplishment with available LEU fuels, and specification of LEU fuel characteristics required to permit continuation of the programs with no significant decrement in accomplishment.

- 3 -

This letter is for guidance only in interpreting 10 CFR 50.64. No response or action is necessary other than that required by the regulation to apply for a unique purpose exemption.

Questions should be addressed to Mr. Robert E. Carter at (301) 492-8206.

Original signed by Prank J, Kiregl8A

Frank J. Miraglia, Director Division of PWR Licensing-B

DISTRIBUTION:

Central File- NRC PDRs Local PDR

SSPD Reading PNoonan RCarter DTondi HBerkow OELD

FMiraglia HYoung, ER, DO

)E V, 01¢0/s

  • SEE PREVIOUS CONCURRENCE SHEET

DPWRL-B:SSPD* DPWRL-B:SSPD* DPWRL-B:SSPD* DPWRL-B:SSPD* OELD*

PNoonan RCarter:ac DTondi HBerkow TDorian

06/19/86 06/19/86 06/20/86 06/20/86 06/24/86

Template:GL-Nav