NRC Generic Letter 1984-08: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/04/1984
| issue date = 04/04/1984
| title = NRC Generic Letter 1984-008, Interim Procedures for NRC Management of Plant-Specific Backfitting
| title = NRC Generic Letter 1984-008, Interim Procedures for NRC Management of Plant-Specific Backfitting
| author name = Eisenhut D G
| author name = Eisenhut D
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
{{#Wiki_filter:.W. }1* ,, I; I ..CQApril 4, 1984 sTO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATINGLICENSES, AND HOLDERS OF CONSTRUCTION PERMITSGentlemen:SUBJECT: INTERIM PROCEDURES FOR NRC MANAGEMENT OFPLANT-SPECIFIC BACKFITTING (Generic Letter 84-08)This letter is to advise you that the Commission has recently approved a planfor management of plant-specific backfitting issues. The Commission hasdirected the staff to seek public comment regarding the plan. This plan and theinterim procedures will be published in the Federal Register. Until publiccomments are received and the plan for management of plant-specific backfittingissues is finalized, the staff intends to use the enclosed procedures asinterim guidance. These enclosures are:1. Draft NRC Manual Chapter-0514, NRC Program for Management of Plant-Specific Backfitting of Operating Reactors.The manual chapter identifies the general coverage, objectives,responsibilities and authorities, and basic requirements of plant-specific backfitting. Subchapters 031 and 032 are particularly important.2. Procedure for Management of Plant-Specific Backfitting ofOperating Reactors Resulting from Licensing Activities.This procedure was developed to fulfill the intent of Subchapter031 of Chapter 0514 identified above. Backfitting issues whicharise from NRR will follow these interim procedures.3. Procedure for Management of Plant-Specific Backfitting of OperatingPower Reactors Resulting from Inspection and Enforcement Activites.This procedure was developed to fulfill the intent of Subchapter032 of Chapter 0514 identified above. Backfitting issues whicharise from IE will follow these interim procedures.The plan for managing plant-specific backfitting for OL applicants and CPholders will follow the procedures for operating reactors until finalprocedures are developed.This letter is for information only and has no reporting requirement.Sincerely,.840404G2S&CF 2Fff.ex-a C.f; enolzEnclosures:As statedORAB:DL*PTremblay:dm03/28/84criginal pe l WrelG. ie t6W'rrell G. Eisenhut, DirectorDivision of LicensingOffice of Nuclear Reactor Regulation*PREVIOUS IC:ORAB:DL*GHolahan03/28/84CONCURRENCE SEE DATEr ,j AD/SA:DL*s 0 I..,FMiragliani/3 /84 03/28/84035684t6010,-11
{{#Wiki_filter:CQ
:\-%-10 ,.UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, D. C. 20555April 4, 1984TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATINGLICENSES, AND HOLDERS OF CONSTRUCTION PERMITSGentlemen:SUBJECT: INTERIM PROCEDURES FOR NRC MANAGEMENT OFPLANT-SPECIFIC BACKFITTING (Generic Letter 84-08)This letter is to advise you that the Commission has recently approved a planfor management of plant-specific backfitting issues. The Commission hasdirected the staff to seek public comment regarding the plan. This plan and theinterim procedures will be published in the Federal Register. Until publiccomments are received and the plan for management of plant-specific backfittingissues is finalized, the staff intends to use the enclosed procedures asinterim guidance. These enclosures are:1. Draft NRC Manual Chapter-0514, NRC Program for Management of Plant-Specific Backfitting of Operating Reactors.The manual chapter identifies the general coverage, objectives,responsibilities and authorities, and basic reauirements of plant-specific backfitting. Subchapters 031 and 032 are particularly important.2. Procedure for Mananement of Plant-Specific Backfitting ofOperating Reactors Resulting from Licensing Activities.This procedure was developed to fulfill the intent of Subchapter031 of Chapter 0514 identified above. Backfitting issues whicharise from NRR will follow these interim procedures.3. Procedure for Management of Plant-Specific Backfitting of OperatingPower Reactors Resulting from Inspection and Enforcement Activites.This procedure was developed to fulfill the intent of Subchapter032 of Chapter 0514 identified above. Backfitting issues whicharise from TE will follow these interim procedures.The plan for managing plant-specific backfitting for OL applicants and CPholders will follow the procedures for operating reactors until finalprocedures are developed.This letter is for information only and has no reporting requirement.\Sincerely.Darrell G. E senhut,Division of icensingOffice of Nuclear Reactor&ReulationEnclosures:As stated v?W~oLI d _ J
  .   W.   }
APR -1 '984Enclosure 1DRAFT MANUAL CHAPTERU.S. NUCLEAR REGULATORY COMMISSIONNRC MANUALVolume: 0000 General AdministrationPart: 0500 Health and SafetyCHAPTER 0514 NRC PROGRAM FOR MANAGEMENT OF PLANT-SPECIFICBACKFITTING OF OPERATING POWER REACTORS0514-01 COVERAGEThis chapter defines the objectives, authorities, and responsibilities andestablishes basic requirements for actions to be taken in instances wherethe NRC staff imposes new plant-specific requirements on a power reactorlicensee. This practice is commonly referred to as "backfitting" and occurswhen the NRC staff takes a new position or changes its interpretation of anexisting position with respect to a power reactor licensee.05 14-02 OBJECTIVESIt is the overall objective of this program to assure that backfitting ofoperating power reactors is documented, justified and that NRC seniormanagement is responsible for the proper implementation of that program.The objectives of this program are to eliminate or remove any unnecessaryburdens placed on licensees, reduce the exposure of workers to radiationin implementing some of these requirements, and conserve NRC resourceswhile at the same time not reducing the levels of protection of publichealth and safety. The program should assure to the extent possible thatrequirements to be issued will in fact contribute effectively to the healthand safety of the public and the common defense and security, and lead toutilization of both NRC and licensee resources in as optimal a fashion aspossible.
;
    1* ,,
          I
                I
                  ..                                         April 4, 1984       s TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING
                LICENSES, AND HOLDERS OF CONSTRUCTION PERMITS
                Gentlemen:
                SUBJECT:     INTERIM PROCEDURES FOR NRC MANAGEMENT OF
                              PLANT-SPECIFIC BACKFITTING (Generic Letter 84-08)
                This letter is to advise you that the Commission has recently approved a plan for management of plant-specific backfitting issues. The Commission has directed the staff to seek public comment regarding the plan. This plan and the interim procedures will be published in the Federal Register. Until public comments are received and the plan for management of plant-specific backfitting issues is finalized, the staff intends to use the enclosed procedures as interim guidance. These enclosures are:
                1.   Draft NRC Manual Chapter-0514, NRC Program for Management of Plant- Specific Backfitting of Operating Reactors.


'1-IAPR -1 1984-2-0514-03 RESPONSIBILITIES AND AUTHORITIES031 The Director, Office of Nuclear Reactor Regulation (NRR) shall develop,maintain, and implement an overall procedure for managing plant-specificbackfitting resulting from licensing activities in accordance with thisManual Chapter. The Director, NRR, shall consult and coordinate withthe Director of the Office of Inspection and Enforcement, and the RegionalAdministrators as appropriate to develop resolutions of proposed plant-specific backfitting on operating reactor licensees that originate withinthose offices other than NRR. The Director, NRR, has the authority tomake any final determination on plant-specific backfitting resulting fromlicensing activities. The Director, NRR, is responsible for assuringthat each licensee is officially informed of the existence and structureof the NRC program described in this Manual Chapter. New licensees shallbe informed at the time of issuance of the operating license. Changesin the Manual Chapter or related procedures shall also be described tolicensees.032 The Director, Office of Inspection and Enforcement shall develop, main-tain and implement an overall procedure for managing plant-specificbackfitting resulting from inspection and enforcement activities inaccordance with this Manual Chapter. The Director, IE, shall consult andcoordinate with appropriate Regional Administrators to develop resolu-tions of proposed plant-specific backfitting on operating reactorlicensees where such backfitting is determined to result from inspectionand enforcement activities and does not involve a modification to anoperating license. The Director, IE, has the authority to make anyfinal determination related to such plant-specific backfitting resultingfrom and involving inspection and enforcement activities.033 The Director, Office of Nuclear Materials Safety and Safeguards, shallconsult and coordinate with the Director, Office of Nuclear ReactorRegulation, to identify proposed plant-specific backfits for a powerreactor licensee that may be required in the areas of safeguards andsecurity. The Director, NMSS, shall assure Office staff performance inaccordance with this Manual Chapter.034 The Regional Administrator of each Region shall consult and coordinatewith the Directors of the Offices of Nuclear Reactor Regulation andInspection and Enforcement on proposed plant-specific backfittinc issuesfor power reactor licensees that involve the Region. Each RegionalAdministrator shall assure Region Office staff performance in accordancewith this Manual Chapter.
The manual chapter identifies the general coverage, objectives, responsibilities and authorities, and basic requirements of plant- specific backfitting. Subchapters 031 and 032 are particularly important.


APR -; 1r34-3-0514-04 BASIC REQUIREMENTS041 Identifying RequirementsThe NRC staff is to provide a description of any new staff-proposedrequirement. The description shall state how the proposal would improveplant safety and must be approved by the appropriate levels of manage-ment, as specified in the procedures called for by this chapter (0514-031 and -032), before it is formally transmitted. to the licensee. Suchproposals are usually recommended by NRR, NMSS, IE and the Regions forlicensing activities and by IE and the Regions for inspection andenforcement activities.042 Appeal ProcessA licensee may choose to appeal a new staff-proposed requirement to NRCstaff management to request that the proposed new requirement be with-drawn or modified. Licensees may appeal licensing requirements to theDirector, Division of Licensing in NRR. The final decision of the NRCstaff on appeals of licensing requirements will be made by the Director,NRR, irrespective of the source of the recommended requirement. Appealsof inspection and enforcement requirements shall be directed to theRegional Administrator. The final decision of the NRC staff on appealsof inspection and enforcement requirements will be made by the Director,IE. A summary of all appeal meetings shall be prepared and placed inthe appropriate Public Document Rooms. During the appeal process, con-sideration should be given to why the proposed requirement is needed toachieve or maintain an acceptable level of safety.043 Cost-Benefit AnalysisIf, after use of the appeal process, the licensee notifies the staff inwriting that it objects to a new staff-proposed requirement, the staffmust assess the costs and benefits of the proposed requirement. Thecosts-benefit analysis will consider, to the extent practical andapplicable, the information required by the Committee for the Review ofGeneric Requirements (CRGR) in its review of proposed new generic re-auirements. The required information as derived from Section IV.B. ofthe CRGR Charter is presented below:a. The proposed requirement as it was sent out to the licensee.b. Draft staff papers or other underlying staff documents supportingthe requirement.c. A brief description of each of the anticipated steps that thelicensee must carry out in order to complete the requirementshould include:(1) Are there separate short-term and long-term requirements?
2.   Procedure for Management of Plant-Specific Backfitting of Operating Reactors Resulting from Licensing Activities.
*AP~ *- de-4-(2) Is it the definitive, comprehensive position on the subjector is it the first of a series of requirements to be issuedin the future?(3) How does this requirement affect other requirements? Doesthis requirement mean that other items or systems or prioranalysis need to be reassessed?(4) Is it only computation? Or does it require or may it entailengineering design of a new system or modification of anyexisting systems?(5) What plant conditions are needed to install, conduct pre-operational tests and declare operable?(6) Is plant shutdown necessary? How long?(7) Does design need NRC approval?(8) Does it require new equipment? Is it available for purchasein sufficient quantity by the affected licensee or must suchequipment be designed? What is the lead time for availability?(9) May it be used upon installation or does it need staff approvalbefore use? Does it need technical specification chancesbefore use?d. The following information should be provided by the staff, wherepractical:(1) A risk reduction assessment performed using a data base andmethodology commonly accepted within NRC (for example, similarto that outlined in SECY 83-221). A qualitative assessment ofthe benefits should be made in lieu of a quantitative assess-ment in cases where it would provide more meaningful insights.(2) An assessment of costs to NRC, an assessment of costs tolicensees, including resulting occupational dose increase ordecrease, added plant and operational complexity, and totalfinancial costs.(3) A position as to whether the requirement implements existingregulations or goes beyond them.(4) The proposed method of implementation, alone with the con-currence (and any comments) of OELD, on the method pro osed.e. The following information should be provided:
APR -i 19845-.(1) The basis for requiring or permitting implementation by agiven date or on a particular schedule, including sufficientinformation to demonstrate that the schedules are realisticand provide sufficient time for in-depth engineering, eval-uation, design, procurement, installation, testing, devel-opment of operating procedures, and training of operators.(2) Schedule for staff actions involved in completion of therequirement (based on hypothesized effective date of approval).(3) Prioritization of the proposed requirement considered in lightof major safety-related activities underway at the affectedfacility. The priority of the requirement shall be approvedby both the Director of Licensing and the appropriate RegionalAdministrator and shall be incorporated into a single prioriti-zation plan for each facility maintained by the facility projectmanager and available to the licensee. Prioritization guidanceand direction shall be provided from time to time by the EDO asnecessary.(4) For a proposed requirement involving reports and/or record-keeping, a statement of why such reporting or recordkeeping isnecessary.044 Implementation of RequirementsA staff-proposed requirement may be issued prior to satisfying theprocedural steps involving the appeal process and the cost-benefitanalysis, provided the appropriate Office Director determines thatprompt imposition of the requirement is necessary to protect thepublic health and safety or the common defense and security. Otherwise,staff-proposed requirements will not be imposed, and plant operationwill not be disrupted during the appeal process, and, if the licenseeobjects in writing, until after the cost-benefit assessment is completedand a final determination has been made by the Director, NRR, or theDirector, IE, as appropriate, that the requirement should be imposed.045 Recordkeeping and ReportingEach plant-specific backfit requirement will be administrativelymanaged, within the Headquarters office or Region office, using arecordkeeping system that provides for retrieval at any time ofcurrent status, planned and accomplished schedules, and ultimatedisposition. Office systems shall be compatible with an overall NRCdata base managed by NRR and accessible to appropriate NRC managers.The systems shall provide access to all documentation issued or re-ceived by the NRC staff, including requests, position statements andsummary reports.


APR6046 ExceptionsNothing in this Manual Chapter shall be interpreted as requiring thestaff to make plant-specific assessments for requirements that have beenreviewed by the CRGR and approved by the EDO unless the EDO determinesthat significant plant-specific issues were not considered during theCRGR review.047 References1. Memorandum dated June 22, 1983, Samuel J. Chilk, Secretary, toWilliam J. Dircks, Executive Director for Operations, COMSECY-83-3.2. Charter of the Committee to Review Generic Requirements, datedJune 16, 1982.0514-05 DEFINITION051 Staff-Proposed RequirementFor purposes of this Chapter, a new staff-proposed requirement includesall those mechanisms used bv the NRC staff to set forth regulatory posi-tions requesting compliance by an OL holder that involve, with respectto that OL holder: (a) a new interpretation or a change in an existinginterpretation of the rules or regulations; or (b) a new staff positionor a change in an exrsting staff position as set forth in, for example,Safety Evaluation Reports, Standard Review Plans, Regulatory Guides,Branch Technical Positions, Inspection Reports, Temporary Instructions,Inspection Manual Chapters, and official letters.
This procedure was developed to fulfill the intent of Subchapter
                      031 of Chapter 0514 identified above. Backfitting issues which arise from NRR will follow these interim procedures.


}}
3.    Procedure for Management of Plant-Specific Backfitting of Operating Power Reactors Resulting from Inspection and Enforcement Activites.
 
This procedure was developed to fulfill the intent of Subchapter
                      032 of Chapter 0514 identified above. Backfitting issues which arise from IE will follow these interim procedures.
 
The plan for managing plant-specific backfitting for OL applicants and CP
                holders will follow the procedures for operating reactors until final procedures are developed.
 
This letter is for information only and has no reporting requirement.
 
Sincerely, criginal      pel W
              .840404G2S&                                          relG.  ie      t
                                                              6W'rrell G. Eisenhut, Director CF      2Fff.
 
ex-aC.f; enolz Division of Licensing Office of Nuclear Reactor Regulation
                                                                                                      6 Enclosures:
                As stated              *PREVIOUS ICONCURRENCE SEE DATE                          10, 0
                ORAB:DL*
                PTremblay:dm C:ORAB:DL*
                                        GHolahan r
                                                                0
                                                                    ,j    AD/SA:DL*
                                                              I..,FMiraglia s                            t
                                                                                                  -11
                03/28/84                03/28/84        ni/3 /84          03/28/84    035684
 
:
                          \-%-1
        0    ,.UNITED                      STATES
                          NUCLEAR REGULATORY COMMISSION
                                  WASHINGTON, D. C. 20555 April 4, 1984 TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING
  LICENSES, AND HOLDERS OF CONSTRUCTION PERMITS
  Gentlemen:
  SUBJECT:    INTERIM PROCEDURES FOR NRC MANAGEMENT OF
              PLANT-SPECIFIC BACKFITTING (Generic Letter 84-08)
  This letter is to advise you that the Commission has recently approved a plan for management of plant-specific backfitting issues. The Commission has directed the staff to seek public comment regarding the plan. This plan and the interim procedures will be published in the Federal Register. Until public comments are received and the plan for management of plant-specific backfitting issues is finalized, the staff intends to use the enclosed procedures as interim guidance. These enclosures are:
  1.    Draft NRC Manual Chapter-0514, NRC Program for Management of Plant- Specific Backfitting of Operating Reactors.
 
The manual chapter identifies the general coverage, objectives, responsibilities and authorities, and basic reauirements of plant- specific backfitting. Subchapters 031 and 032 are particularly important.
 
2.    Procedure for Mananement of Plant-Specific Backfitting of Operating Reactors Resulting from Licensing Activities.
 
This procedure was developed to fulfill the intent of Subchapter
        031 of Chapter 0514 identified above. Backfitting issues which arise from NRR will follow these interim procedures.
 
3.    Procedure for Management of Plant-Specific Backfitting of Operating Power Reactors Resulting from Inspection and Enforcement Activites.
 
This procedure was developed to fulfill the intent of Subchapter
        032 of Chapter 0514 identified above. Backfitting issues which arise from TE will follow these interim procedures.
 
The plan for managing plant-specific backfitting for OL applicants and CP
  holders will follow the procedures for operating reactors until final procedures are developed.
 
This letter is for information only and has no reporting requirement.
 
\Sincerely.
 
Darrell G. E senhut, Division of icensing Office of Nuclear Reactor&Reulation Enclosures:
  As stated                                                            v?
                        W~oLI                            d                _ J
 
APR - 1 '984 Enclosure 1 DRAFT MANUAL CHAPTER
                        U.S. NUCLEAR REGULATORY COMMISSION
                                    NRC MANUAL
Volume:  0000  General Administration Part:    0500  Health and Safety CHAPTER 0514 NRC PROGRAM FOR MANAGEMENT OF PLANT-SPECIFIC
                    BACKFITTING OF OPERATING POWER REACTORS
0514-01  COVERAGE
This chapter defines the objectives, authorities, and responsibilities and establishes basic requirements for actions to be taken in instances where the NRC staff imposes new plant-specific requirements on a power reactor licensee. This practice is commonly referred to as "backfitting" and occurs when the NRC staff takes a new position or changes its interpretation of an existing position with respect to a power reactor licensee.
 
05 14-02  OBJECTIVES
It is the overall objective of this program to assure that backfitting of operating power reactors is documented, justified and that NRC senior management is responsible for the proper implementation of that program.
 
The objectives of this program are to eliminate or remove any unnecessary burdens placed on licensees, reduce the exposure of workers to radiation in implementing some of these requirements, and conserve NRC resources while at the same time not reducing the levels of protection of public health and safety. The program should assure to the extent possible that requirements to be issued will in fact contribute effectively to the health and safety of the public and the common defense and security, and lead to utilization of both NRC and licensee resources in as optimal a fashion as possible.
 
'1-I            APR - 1 1984
                                        -2-
0514-03  RESPONSIBILITIES AND AUTHORITIES
031  The Director, Office of Nuclear Reactor Regulation (NRR) shall develop, maintain, and implement an overall procedure for managing plant-specific backfitting resulting from licensing activities in accordance with this Manual Chapter. The Director, NRR, shall consult and coordinate with the Director of the Office of Inspection and Enforcement, and the Regional Administrators as appropriate to develop resolutions of proposed plant- specific backfitting on operating reactor licensees that originate within those offices other than NRR. The Director, NRR, has the authority to make any final determination on plant-specific backfitting resulting from licensing activities. The Director, NRR, is responsible for assuring that each licensee is officially informed of the existence and structure of the NRC program described in this Manual Chapter. New licensees shall be informed at the time of issuance of the operating license. Changes in the Manual Chapter or related procedures shall also be described to licensees.
 
032  The Director, Office of Inspection and Enforcement shall develop, main- tain and implement an overall procedure for managing plant-specific backfitting resulting from inspection and enforcement activities in accordance with this Manual Chapter. The Director, IE, shall consult and coordinate with appropriate Regional Administrators to develop resolu- tions of proposed plant-specific backfitting on operating reactor licensees where such backfitting is determined to result from inspection and enforcement activities and does not involve a modification to an operating license. The Director, IE, has the authority to make any final determination related to such plant-specific backfitting resulting from and involving inspection and enforcement activities.
 
033  The Director, Office of Nuclear Materials Safety and Safeguards, shall consult and coordinate with the Director, Office of Nuclear Reactor Regulation, to identify proposed plant-specific backfits for a power reactor licensee that may be required in the areas of safeguards and security. The Director, NMSS, shall assure Office staff performance in accordance with this Manual Chapter.
 
034 The Regional Administrator of each Region shall consult and coordinate with the Directors of the Offices of Nuclear Reactor Regulation and Inspection and Enforcement on proposed plant-specific backfittinc issues for power reactor licensees that involve the Region. Each Regional Administrator shall assure Region Office staff performance in accordance with this Manual Chapter.
 
APR - ; 1r34
                                        -3-
0514-04 BASIC REQUIREMENTS
041  Identifying Requirements The NRC staff is to provide a description of any new staff-proposed requirement. The description shall state how the proposal would improve plant safety and must be approved by the appropriate levels of manage- ment, as specified in the procedures called for by this chapter (0514-
      031 and -032), before it is formally transmitted. to the licensee. Such proposals are usually recommended by NRR, NMSS, IE and the Regions for licensing activities and by IE and the Regions for inspection and enforcement activities.
 
042  Appeal Process A licensee may choose to appeal a new staff-proposed requirement to NRC
      staff management to request that the proposed new requirement be with- drawn or modified. Licensees may appeal licensing requirements to the Director, Division of Licensing in NRR. The final decision of the NRC
      staff on appeals of licensing requirements will be made by the Director, NRR, irrespective of the source of the recommended requirement. Appeals of inspection and enforcement requirements shall be directed to the Regional Administrator. The final decision of the NRC staff on appeals of inspection and enforcement requirements will be made by the Director, IE. A summary of all appeal meetings shall be prepared and placed in the appropriate Public Document Rooms. During the appeal process, con- sideration should be given to why the proposed requirement is needed to achieve or maintain an acceptable level of safety.
 
043  Cost-Benefit Analysis If, after use of the appeal process, the licensee notifies the staff in writing that it objects to a new staff-proposed requirement, the staff must assess the costs and benefits of the proposed requirement. The costs-benefit analysis will consider, to the extent practical and applicable, the information required by the Committee for the Review of Generic Requirements (CRGR) in its review of proposed new generic re- auirements. The required information as derived from Section IV.B. of the CRGR Charter is presented below:
    a.    The proposed requirement as it was sent out to the licensee.
 
b.    Draft staff papers or other underlying staff documents supporting the requirement.
 
c.    A brief description of each of the anticipated steps that the licensee must carry out in order to complete the requirement should include:
          (1) Are there separate short-term and long-term requirements?
 
*AP~*- de
                              -4-
    (2) Is it the definitive, comprehensive position on the subject or is it the first of a series of requirements to be issued in the future?
    (3) How does this requirement affect other requirements? Does this requirement mean that other items or systems or prior analysis need to be reassessed?
    (4) Is it only computation? Or does it require or may it entail engineering design of a new system or modification of any existing systems?
    (5) What plant conditions are needed to install, conduct pre- operational tests and declare operable?
    (6) Is plant shutdown necessary?  How long?
    (7) Does design need NRC approval?
  (8) Does it require new equipment? Is it available for purchase in sufficient quantity by the affected licensee or must such equipment be designed? What is the lead time for availability?
  (9) May it be used upon installation or does it need staff approval before use? Does it need technical specification chances before use?
d. The following information should be provided by the staff, where practical:
  (1) A risk reduction assessment performed using a data base and methodology commonly accepted within NRC (for example, similar to that outlined in SECY 83-221). A qualitative assessment of the benefits should be made in lieu of a quantitative assess- ment in cases where it would provide more meaningful insights.
 
(2) An assessment of costs to NRC, an assessment of costs to licensees, including resulting occupational dose increase or decrease, added plant and operational complexity, and total financial costs.
 
(3) A position as to whether the requirement implements existing regulations or goes beyond them.
 
(4) The proposed method of implementation, alone with the con- currence (and any comments) of OELD, on the method pro osed.
 
e. The following information should be provided:
 
APR - i 1984
                                        5-.
          (1) The basis for requiring or permitting implementation by a given date or on a particular schedule, including sufficient information to demonstrate that the schedules are realistic and provide sufficient time for in-depth engineering, eval- uation, design, procurement, installation, testing, devel- opment of operating procedures, and training of operators.
 
(2) Schedule for staff actions involved in completion of the requirement (based on hypothesized effective date of approval).
          (3) Prioritization of the proposed requirement considered in light of major safety-related activities underway at the affected facility. The priority of the requirement shall be approved by both the Director of Licensing and the appropriate Regional Administrator and shall be incorporated into a single prioriti- zation plan for each facility maintained by the facility project manager and available to the licensee. Prioritization guidance and direction shall be provided from time to time by the EDO as necessary.
 
(4) For a proposed requirement involving reports and/or record- keeping, a statement of why such reporting or recordkeeping is necessary.
 
044  Implementation of Requirements A staff-proposed requirement may be issued prior to satisfying the procedural steps involving the appeal process and the cost-benefit analysis, provided the appropriate Office Director determines that prompt imposition of the requirement is necessary to protect the public health and safety or the common defense and security. Otherwise, staff-proposed requirements will not be imposed, and plant operation will not be disrupted during the appeal process, and, if the licensee objects in writing, until after the cost-benefit assessment is completed and a final determination has been made by the Director, NRR, or the Director, IE, as appropriate, that the requirement should be imposed.
 
045 Recordkeeping and Reporting Each plant-specific backfit requirement will be administratively managed, within the Headquarters office or Region office, using a recordkeeping system that provides for retrieval at any time of current status, planned and accomplished schedules, and ultimate disposition. Office systems shall be compatible with an overall NRC
    data base managed by NRR and accessible to appropriate NRC managers.
 
The systems shall provide access to all documentation issued or re- ceived by the NRC staff, including requests, position statements and summary reports.
 
APR
                                        6
046  Exceptions Nothing in this Manual Chapter shall be interpreted as requiring the staff to make plant-specific assessments for requirements that have been reviewed by the CRGR and approved by the EDO unless the EDO determines that significant plant-specific issues were not considered during the CRGR review.
 
047  References
      1.  Memorandum dated June 22, 1983, Samuel J. Chilk, Secretary, to William J. Dircks, Executive Director for Operations, COMSECY-83-3.
 
2.    Charter of the Committee to Review Generic Requirements, dated June 16, 1982.
 
0514-05    DEFINITION
051  Staff-Proposed Requirement For purposes of this Chapter, a new staff-proposed requirement includes all those mechanisms used bv the NRC staff to set forth regulatory posi- tions requesting compliance by an OL holder that involve, with respect to that OL holder: (a) a new interpretation or a change in an existing interpretation of the rules or regulations; or (b) a new staff position or a change in an exrsting staff position as set forth in, for example, Safety Evaluation Reports, Standard Review Plans, Regulatory Guides, Branch Technical Positions, Inspection Reports, Temporary Instructions, Inspection Manual Chapters, and official letters.}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 02:16, 24 November 2019

NRC Generic Letter 1984-008, Interim Procedures for NRC Management of Plant-Specific Backfitting
ML031210378
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill, Crane
Issue date: 04/04/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-84-008, NUDOCS 8404040256
Download: ML031210378 (8)


CQ

. W. }

1* ,,

I

I

.. April 4, 1984 s TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING

LICENSES, AND HOLDERS OF CONSTRUCTION PERMITS

Gentlemen:

SUBJECT: INTERIM PROCEDURES FOR NRC MANAGEMENT OF

PLANT-SPECIFIC BACKFITTING (Generic Letter 84-08)

This letter is to advise you that the Commission has recently approved a plan for management of plant-specific backfitting issues. The Commission has directed the staff to seek public comment regarding the plan. This plan and the interim procedures will be published in the Federal Register. Until public comments are received and the plan for management of plant-specific backfitting issues is finalized, the staff intends to use the enclosed procedures as interim guidance. These enclosures are:

1. Draft NRC Manual Chapter-0514, NRC Program for Management of Plant- Specific Backfitting of Operating Reactors.

The manual chapter identifies the general coverage, objectives, responsibilities and authorities, and basic requirements of plant- specific backfitting. Subchapters 031 and 032 are particularly important.

2. Procedure for Management of Plant-Specific Backfitting of Operating Reactors Resulting from Licensing Activities.

This procedure was developed to fulfill the intent of Subchapter

031 of Chapter 0514 identified above. Backfitting issues which arise from NRR will follow these interim procedures.

3. Procedure for Management of Plant-Specific Backfitting of Operating Power Reactors Resulting from Inspection and Enforcement Activites.

This procedure was developed to fulfill the intent of Subchapter

032 of Chapter 0514 identified above. Backfitting issues which arise from IE will follow these interim procedures.

The plan for managing plant-specific backfitting for OL applicants and CP

holders will follow the procedures for operating reactors until final procedures are developed.

This letter is for information only and has no reporting requirement.

Sincerely, criginal pel W

.840404G2S& relG. ie t

6W'rrell G. Eisenhut, Director CF 2Fff.

ex-aC.f; enolz Division of Licensing Office of Nuclear Reactor Regulation

6 Enclosures:

As stated *PREVIOUS ICONCURRENCE SEE DATE 10, 0

ORAB:DL*

PTremblay:dm C:ORAB:DL*

GHolahan r

0

,j AD/SA:DL*

I..,FMiraglia s t

-11

03/28/84 03/28/84 ni/3 /84 03/28/84 035684

\-%-1

0 ,.UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 April 4, 1984 TO ALL LICENSEES OF OPERATING REACTORS, APPLICANTS FOR OPERATING

LICENSES, AND HOLDERS OF CONSTRUCTION PERMITS

Gentlemen:

SUBJECT: INTERIM PROCEDURES FOR NRC MANAGEMENT OF

PLANT-SPECIFIC BACKFITTING (Generic Letter 84-08)

This letter is to advise you that the Commission has recently approved a plan for management of plant-specific backfitting issues. The Commission has directed the staff to seek public comment regarding the plan. This plan and the interim procedures will be published in the Federal Register. Until public comments are received and the plan for management of plant-specific backfitting issues is finalized, the staff intends to use the enclosed procedures as interim guidance. These enclosures are:

1. Draft NRC Manual Chapter-0514, NRC Program for Management of Plant- Specific Backfitting of Operating Reactors.

The manual chapter identifies the general coverage, objectives, responsibilities and authorities, and basic reauirements of plant- specific backfitting. Subchapters 031 and 032 are particularly important.

2. Procedure for Mananement of Plant-Specific Backfitting of Operating Reactors Resulting from Licensing Activities.

This procedure was developed to fulfill the intent of Subchapter

031 of Chapter 0514 identified above. Backfitting issues which arise from NRR will follow these interim procedures.

3. Procedure for Management of Plant-Specific Backfitting of Operating Power Reactors Resulting from Inspection and Enforcement Activites.

This procedure was developed to fulfill the intent of Subchapter

032 of Chapter 0514 identified above. Backfitting issues which arise from TE will follow these interim procedures.

The plan for managing plant-specific backfitting for OL applicants and CP

holders will follow the procedures for operating reactors until final procedures are developed.

This letter is for information only and has no reporting requirement.

\Sincerely.

Darrell G. E senhut, Division of icensing Office of Nuclear Reactor&Reulation Enclosures:

As stated v?

W~oLI d _ J

APR - 1 '984 Enclosure 1 DRAFT MANUAL CHAPTER

U.S. NUCLEAR REGULATORY COMMISSION

NRC MANUAL

Volume: 0000 General Administration Part: 0500 Health and Safety CHAPTER 0514 NRC PROGRAM FOR MANAGEMENT OF PLANT-SPECIFIC

BACKFITTING OF OPERATING POWER REACTORS

0514-01 COVERAGE

This chapter defines the objectives, authorities, and responsibilities and establishes basic requirements for actions to be taken in instances where the NRC staff imposes new plant-specific requirements on a power reactor licensee. This practice is commonly referred to as "backfitting" and occurs when the NRC staff takes a new position or changes its interpretation of an existing position with respect to a power reactor licensee.

05 14-02 OBJECTIVES

It is the overall objective of this program to assure that backfitting of operating power reactors is documented, justified and that NRC senior management is responsible for the proper implementation of that program.

The objectives of this program are to eliminate or remove any unnecessary burdens placed on licensees, reduce the exposure of workers to radiation in implementing some of these requirements, and conserve NRC resources while at the same time not reducing the levels of protection of public health and safety. The program should assure to the extent possible that requirements to be issued will in fact contribute effectively to the health and safety of the public and the common defense and security, and lead to utilization of both NRC and licensee resources in as optimal a fashion as possible.

'1-I APR - 1 1984

-2-

0514-03 RESPONSIBILITIES AND AUTHORITIES

031 The Director, Office of Nuclear Reactor Regulation (NRR) shall develop, maintain, and implement an overall procedure for managing plant-specific backfitting resulting from licensing activities in accordance with this Manual Chapter. The Director, NRR, shall consult and coordinate with the Director of the Office of Inspection and Enforcement, and the Regional Administrators as appropriate to develop resolutions of proposed plant- specific backfitting on operating reactor licensees that originate within those offices other than NRR. The Director, NRR, has the authority to make any final determination on plant-specific backfitting resulting from licensing activities. The Director, NRR, is responsible for assuring that each licensee is officially informed of the existence and structure of the NRC program described in this Manual Chapter. New licensees shall be informed at the time of issuance of the operating license. Changes in the Manual Chapter or related procedures shall also be described to licensees.

032 The Director, Office of Inspection and Enforcement shall develop, main- tain and implement an overall procedure for managing plant-specific backfitting resulting from inspection and enforcement activities in accordance with this Manual Chapter. The Director, IE, shall consult and coordinate with appropriate Regional Administrators to develop resolu- tions of proposed plant-specific backfitting on operating reactor licensees where such backfitting is determined to result from inspection and enforcement activities and does not involve a modification to an operating license. The Director, IE, has the authority to make any final determination related to such plant-specific backfitting resulting from and involving inspection and enforcement activities.

033 The Director, Office of Nuclear Materials Safety and Safeguards, shall consult and coordinate with the Director, Office of Nuclear Reactor Regulation, to identify proposed plant-specific backfits for a power reactor licensee that may be required in the areas of safeguards and security. The Director, NMSS, shall assure Office staff performance in accordance with this Manual Chapter.

034 The Regional Administrator of each Region shall consult and coordinate with the Directors of the Offices of Nuclear Reactor Regulation and Inspection and Enforcement on proposed plant-specific backfittinc issues for power reactor licensees that involve the Region. Each Regional Administrator shall assure Region Office staff performance in accordance with this Manual Chapter.

APR - ; 1r34

-3-

0514-04 BASIC REQUIREMENTS

041 Identifying Requirements The NRC staff is to provide a description of any new staff-proposed requirement. The description shall state how the proposal would improve plant safety and must be approved by the appropriate levels of manage- ment, as specified in the procedures called for by this chapter (0514-

031 and -032), before it is formally transmitted. to the licensee. Such proposals are usually recommended by NRR, NMSS, IE and the Regions for licensing activities and by IE and the Regions for inspection and enforcement activities.

042 Appeal Process A licensee may choose to appeal a new staff-proposed requirement to NRC

staff management to request that the proposed new requirement be with- drawn or modified. Licensees may appeal licensing requirements to the Director, Division of Licensing in NRR. The final decision of the NRC

staff on appeals of licensing requirements will be made by the Director, NRR, irrespective of the source of the recommended requirement. Appeals of inspection and enforcement requirements shall be directed to the Regional Administrator. The final decision of the NRC staff on appeals of inspection and enforcement requirements will be made by the Director, IE. A summary of all appeal meetings shall be prepared and placed in the appropriate Public Document Rooms. During the appeal process, con- sideration should be given to why the proposed requirement is needed to achieve or maintain an acceptable level of safety.

043 Cost-Benefit Analysis If, after use of the appeal process, the licensee notifies the staff in writing that it objects to a new staff-proposed requirement, the staff must assess the costs and benefits of the proposed requirement. The costs-benefit analysis will consider, to the extent practical and applicable, the information required by the Committee for the Review of Generic Requirements (CRGR) in its review of proposed new generic re- auirements. The required information as derived from Section IV.B. of the CRGR Charter is presented below:

a. The proposed requirement as it was sent out to the licensee.

b. Draft staff papers or other underlying staff documents supporting the requirement.

c. A brief description of each of the anticipated steps that the licensee must carry out in order to complete the requirement should include:

(1) Are there separate short-term and long-term requirements?

  • AP~*- de

-4-

(2) Is it the definitive, comprehensive position on the subject or is it the first of a series of requirements to be issued in the future?

(3) How does this requirement affect other requirements? Does this requirement mean that other items or systems or prior analysis need to be reassessed?

(4) Is it only computation? Or does it require or may it entail engineering design of a new system or modification of any existing systems?

(5) What plant conditions are needed to install, conduct pre- operational tests and declare operable?

(6) Is plant shutdown necessary? How long?

(7) Does design need NRC approval?

(8) Does it require new equipment? Is it available for purchase in sufficient quantity by the affected licensee or must such equipment be designed? What is the lead time for availability?

(9) May it be used upon installation or does it need staff approval before use? Does it need technical specification chances before use?

d. The following information should be provided by the staff, where practical:

(1) A risk reduction assessment performed using a data base and methodology commonly accepted within NRC (for example, similar to that outlined in SECY 83-221). A qualitative assessment of the benefits should be made in lieu of a quantitative assess- ment in cases where it would provide more meaningful insights.

(2) An assessment of costs to NRC, an assessment of costs to licensees, including resulting occupational dose increase or decrease, added plant and operational complexity, and total financial costs.

(3) A position as to whether the requirement implements existing regulations or goes beyond them.

(4) The proposed method of implementation, alone with the con- currence (and any comments) of OELD, on the method pro osed.

e. The following information should be provided:

APR - i 1984

5-.

(1) The basis for requiring or permitting implementation by a given date or on a particular schedule, including sufficient information to demonstrate that the schedules are realistic and provide sufficient time for in-depth engineering, eval- uation, design, procurement, installation, testing, devel- opment of operating procedures, and training of operators.

(2) Schedule for staff actions involved in completion of the requirement (based on hypothesized effective date of approval).

(3) Prioritization of the proposed requirement considered in light of major safety-related activities underway at the affected facility. The priority of the requirement shall be approved by both the Director of Licensing and the appropriate Regional Administrator and shall be incorporated into a single prioriti- zation plan for each facility maintained by the facility project manager and available to the licensee. Prioritization guidance and direction shall be provided from time to time by the EDO as necessary.

(4) For a proposed requirement involving reports and/or record- keeping, a statement of why such reporting or recordkeeping is necessary.

044 Implementation of Requirements A staff-proposed requirement may be issued prior to satisfying the procedural steps involving the appeal process and the cost-benefit analysis, provided the appropriate Office Director determines that prompt imposition of the requirement is necessary to protect the public health and safety or the common defense and security. Otherwise, staff-proposed requirements will not be imposed, and plant operation will not be disrupted during the appeal process, and, if the licensee objects in writing, until after the cost-benefit assessment is completed and a final determination has been made by the Director, NRR, or the Director, IE, as appropriate, that the requirement should be imposed.

045 Recordkeeping and Reporting Each plant-specific backfit requirement will be administratively managed, within the Headquarters office or Region office, using a recordkeeping system that provides for retrieval at any time of current status, planned and accomplished schedules, and ultimate disposition. Office systems shall be compatible with an overall NRC

data base managed by NRR and accessible to appropriate NRC managers.

The systems shall provide access to all documentation issued or re- ceived by the NRC staff, including requests, position statements and summary reports.

APR

6

046 Exceptions Nothing in this Manual Chapter shall be interpreted as requiring the staff to make plant-specific assessments for requirements that have been reviewed by the CRGR and approved by the EDO unless the EDO determines that significant plant-specific issues were not considered during the CRGR review.

047 References

1. Memorandum dated June 22, 1983, Samuel J. Chilk, Secretary, to William J. Dircks, Executive Director for Operations, COMSECY-83-3.

2. Charter of the Committee to Review Generic Requirements, dated June 16, 1982.

0514-05 DEFINITION

051 Staff-Proposed Requirement For purposes of this Chapter, a new staff-proposed requirement includes all those mechanisms used bv the NRC staff to set forth regulatory posi- tions requesting compliance by an OL holder that involve, with respect to that OL holder: (a) a new interpretation or a change in an existing interpretation of the rules or regulations; or (b) a new staff position or a change in an exrsting staff position as set forth in, for example, Safety Evaluation Reports, Standard Review Plans, Regulatory Guides, Branch Technical Positions, Inspection Reports, Temporary Instructions, Inspection Manual Chapters, and official letters.

Template:GL-Nav