{{#Wiki_filter:Nqqgle -FW: MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS I_Page 1 i X Jw F__a__ \-- 7. e _=:_= mu-FW: MOvORN WEL U -rrrP _s5_- __DATE -JAUAYR 3,200 AT 1600 HOUR S Pa__g vv._._ _.=e 1 -.._. -=-From: "Croulet, Donald" <dcroule @ entergy.com>
{{#Wiki_filter:IXJq.Ies  Nqqgle - FW: MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS                                               _Page 1 i-_
To: "Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90@entergy.com>,"Bowman, Greg " <GBowm9O0cc--exsO3.prod.entergy.com>, "Janicki, John" <JJanick&#xa9;entergy.com>,"'James Noggle"' <JDN@nrc.gov>, "'Timothy Rice"' <tbrice0gw.dec.state.ny.us>
        \-- 7.e _=:_=MOvORN Jw F__a__                mu-FW:       WEL U _s5_-       __DATE3,200 AT 1600 HOUR S
Date: 1/4/06 8:49AM  
                                                      -JAUAYR
                                                        -rrrP                                                            Pa__g 1 vv._-_
From:             "Croulet, Donald" <dcroule @entergy.com>
To:               "Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90@entergy.com>,
                "Bowman, Greg " <GBowm9O0cc--exsO3.prod.entergy.com>, "Janicki, John" <JJanick&#xa9;entergy.com>,
                "'James Noggle"' <JDN@nrc.gov>, "'Timothy Rice"' <tbrice0gw.dec.state.ny.us>
Date:             1/4/06 8:49AM


==Subject:==
==Subject:==
FW: MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS From: Sachatello, Ronald Sent: Tuesday, January 03, 2006 4:32 PM To: Leach, Don; Hinrichs, Gary; Morin, Kenneth; Rutkoske, Michael; Jones, T. R.; Skonieczny, John;McMullin, Kathy; Peters, James; Wilson, Daniel; Gray, Dara; Loope, Dennis; Drake, Richard; Nuta, Dragos A; Deeds, Paul; Bode, Paul M.; English, Christopher; Kulaga, Joe; Croulet, Donald; Vogle, Robert;Durfee, Michael; Lavera, Ron; Santis, Hank; Thiery, Al; Evers, Bob; Daniele, John C.; Burns, Thomas;Colville, Howard J.; Colville, Richard Cc: Axelson, William L; Mayer, Don; Sachatello, Ronald  
FW: MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS From: Sachatello, Ronald Sent: Tuesday, January 03, 2006 4:32 PM To: Leach, Don; Hinrichs, Gary; Morin, Kenneth; Rutkoske, Michael; Jones, T. R.; Skonieczny, John; McMullin, Kathy; Peters, James; Wilson, Daniel; Gray, Dara; Loope, Dennis; Drake, Richard; Nuta, Dragos A; Deeds, Paul; Bode, Paul M.; English, Christopher; Kulaga, Joe; Croulet, Donald; Vogle, Robert; Durfee, Michael; Lavera, Ron; Santis, Hank; Thiery, Al; Evers, Bob; Daniele, John C.; Burns, Thomas; Colville, Howard J.; Colville, Richard Cc: Axelson, William L; Mayer, Don; Sachatello, Ronald


==Subject:==
==Subject:==
MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS<<MONITORING WELL'STATUS.doc>>  
MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS
..'f * , #i MONITORING WELL STATUS (Jan 3, 2006-1600 hours)Well Number MW-111 MW-30 MW-31 MW-32 MW-33 MW-34 MW-35 MW-36 MW-37 MW-38 Location Status Transformer Yard U-2 SFB MOB side walk U-2 SFB Alley Way Transformer Yard Transformer Yard Transformer Yard U-2 Turbine Bldg U-2 Turbine Bldg South U-3 Boundary Baseline Sample PT Developed well Adding casings to reach 80'e&Well Installed Drilled approximately 15'Well installed Well installed Well installed Relocated drill location Relocated drill location Well in service Next Samples Step Taken Current result 212,000 pCi/l (12/30/05)
                <<MONITORING WELL'STATUS.doc>>                                                                   . .'
Raw Water: Packer test Water: Sampled 12/30/05 Drill next 185' to final depth (i.e. -120 el)Sampled water 12/30/05 Sampled water 12/30/05 Sampled water 12/30/05 Set up equipment to drill well Set up equipment to drill well Continue periodic sampling Sample Result (Highest Historical Value)302,000 pCi/l (11/04/05 399,000 pCi/l (11/23/05) 600,000 pCi/l (11/24/05) 4,060 pCi/l (12/30/05) 220,000 pCi/i (12/30/05) 147,000 pCi/l (12/30/05) 80,500 pCi/l (12/30/05) 985 pCi/l (12/08/05)
f*   , #i
Storm Drains: NOTE: Jim Peters to baseline sample various yard storm drain man holes this week (near U-2 RWST, in front of U-2 cafeteria, in front of U-2 Security Command Post, etc)Next emphasis will be to concentrate on MW-48. This location is south of MW-38, and represents the most southerly sample point.MW-48 will be drilled with the track mounted gas powered drill machine, whereas MW-36 and MW-37 in the Turbine Bldg will use an electric drilling machine (thus multiple MW areas will be drilled at same time).The next steps for MW-48 will be to get the engineering paper work in place. jack hammer the pavement, and begin vacuum truck soil excavation so as to be ready for drilling machine when it completes MW-32.
 
RECENT TREND INFORMATION: (Activity in pCi/L)MONITORING WELLS: DATE: MW-30: 11/24/05 12/08/05 12/19/05 12/30/05 600,000 (ONLY SAMPLE TO DATE)MW-31: 4061 MW-32: STILL DRILLING MW-33: 199,000 220,000 MW-34: 121,000 147,000 MW-35: 76,000 80,500 MW-ill: 192,000 212,000 MW-38: 985 STORM DRAINS (SAMPLES TAKEN DURING 12/16-12/21/05)
MONITORING WELL STATUS                               (Jan 3, 2006-1600 hours)
MH-1 MH-2 MH-3 MH-4 MH-4A MH-5 MH-6 MH-7 MH-8 NO WATER 651 2,330 4,370 2,730 6,920 12,200 5,340 4,510 MH-9 MH-10 MH-17 MH-18 MH-19 atI 2,140 2,940 1,710 854 1,810}}
Well         Location                      Status                        Next                          Samples            Sample Result Number                                                                     Step                          Taken              (Highest Historical Value)
MW-111       Transformer Yard               Baseline Sample PT             Current result 212,000 pCi/l (12/30/05)         302,000 pCi/l (11/04/05 MW-30        U-2 SFB                        Developed well                                              Raw Water:        399,000 pCi/l (11/23/05)
Adding casings to reach 80'e&                                Packer test Water: 600,000 pCi/l (11/24/05)
MW-31        MOB side walk                  Well Installed                  Sampled 12/30/05                                  4,060 pCi/l (12/30/05)
MW-32        U-2 SFB Alley Way              Drilled approximately 15'        Drill next 185' to final depth (i.e. -120 el)
MW-33        Transformer Yard              Well installed                  Sampled water 12/30/05                        220,000 pCi/i (12/30/05)
MW-34        Transformer Yard              Well installed                  Sampled water 12/30/05                        147,000 pCi/l (12/30/05)
MW-35        Transformer Yard              Well installed                  Sampled water 12/30/05                          80,500 pCi/l (12/30/05)
MW-36        U-2 Turbine Bldg              Relocated drill location        Set up equipment to drill well MW-37        U-2 Turbine Bldg              Relocated drill location        Set up equipment to drill well MW-38        South U-3 Boundary            Well in service                  Continue periodic sampling                    985 pCi/l (12/08/05)
Storm Drains:       Jim Peters to baseline sample various yard storm drain man holes this week (near U-2 RWST, in front of U-2 cafeteria, in front of U-2 Security Command Post, etc)
NOTE:                Next emphasis will be to concentrate on MW-48. This location is south of MW-38, and represents the most southerly sample point.
MW-48 will be drilled with the track mounted gas powered drill machine, whereas MW-36 and MW-37 in the Turbine Bldg will use an electric drilling machine (thus multiple MW areas will be drilled at same time).
The next steps for MW-48 will be to get the engineering paper work in place. jack hammer the pavement, and begin vacuum truck soil excavation so as to be ready for drilling machine when it completes MW-32.
 
RECENT TREND INFORMATION:
(Activity in pCi/L)
MONITORING WELLS:
DATE:   11/24/05             12/08/05                 12/19/05       12/30/05 MW-30:  600,000 (ONLY SAMPLE TO DATE)
MW-31:                                                               4061 MW-32: STILL DRILLING MW-33:                                                 199,000       220,000 MW-34:                                                 121,000       147,000 MW-35:                                                 76,000         80,500 MW-ill:                                               192,000       212,000 MW-38:                         985 atI STORM DRAINS         (SAMPLES TAKEN DURING 12/16-12/21/05)
MH-1                 NO WATER              MH-9              2,140 MH-2                    651                MH-10            2,940 MH-3                  2,330                MH-17            1,710 MH-4                  4,370                MH-18              854 MH-4A                  2,730                MH-19            1,810 MH-5                  6,920 MH-6                  12,200 MH-7                  5,340 MH-8                  4,510}}

Revision as of 20:05, 23 November 2019

E-mail from D. Croulet of Entergy to Various, Regarding Monitoring Well Update - January 3, 2006 at 1600 Hours
ML061000629
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/04/2006
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
NRC/RGN-I/DRS/PSB2
References
FOIA/PA-2006-0081
Download: ML061000629 (3)


Text

IXJq.Ies Nqqgle - FW: MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS _Page 1 i-_

\-- 7.e _=:_=MOvORN Jw F__a__ mu-FW: WEL U _s5_- __DATE3,200 AT 1600 HOUR S

-JAUAYR

-rrrP Pa__g 1 vv._-_

From: "Croulet, Donald" <dcroule @entergy.com>

To: "Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90@entergy.com>,

"Bowman, Greg " <GBowm9O0cc--exsO3.prod.entergy.com>, "Janicki, John" <JJanick©entergy.com>,

"'James Noggle"' <JDN@nrc.gov>, "'Timothy Rice"' <tbrice0gw.dec.state.ny.us>

Date: 1/4/06 8:49AM

Subject:

FW: MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS From: Sachatello, Ronald Sent: Tuesday, January 03, 2006 4:32 PM To: Leach, Don; Hinrichs, Gary; Morin, Kenneth; Rutkoske, Michael; Jones, T. R.; Skonieczny, John; McMullin, Kathy; Peters, James; Wilson, Daniel; Gray, Dara; Loope, Dennis; Drake, Richard; Nuta, Dragos A; Deeds, Paul; Bode, Paul M.; English, Christopher; Kulaga, Joe; Croulet, Donald; Vogle, Robert; Durfee, Michael; Lavera, Ron; Santis, Hank; Thiery, Al; Evers, Bob; Daniele, John C.; Burns, Thomas; Colville, Howard J.; Colville, Richard Cc: Axelson, William L; Mayer, Don; Sachatello, Ronald

Subject:

MONITORING WELL UPDATE-JANUARY 3,2006 AT 1600 HOURS

<<MONITORING WELL'STATUS.doc>> . .'

f* , #i

MONITORING WELL STATUS (Jan 3, 2006-1600 hours)

Well Location Status Next Samples Sample Result Number Step Taken (Highest Historical Value)

MW-111 Transformer Yard Baseline Sample PT Current result 212,000 pCi/l (12/30/05) 302,000 pCi/l (11/04/05 MW-30 U-2 SFB Developed well Raw Water: 399,000 pCi/l (11/23/05)

Adding casings to reach 80'e& Packer test Water: 600,000 pCi/l (11/24/05)

MW-31 MOB side walk Well Installed Sampled 12/30/05 4,060 pCi/l (12/30/05)

MW-32 U-2 SFB Alley Way Drilled approximately 15' Drill next 185' to final depth (i.e. -120 el)

MW-33 Transformer Yard Well installed Sampled water 12/30/05 220,000 pCi/i (12/30/05)

MW-34 Transformer Yard Well installed Sampled water 12/30/05 147,000 pCi/l (12/30/05)

MW-35 Transformer Yard Well installed Sampled water 12/30/05 80,500 pCi/l (12/30/05)

MW-36 U-2 Turbine Bldg Relocated drill location Set up equipment to drill well MW-37 U-2 Turbine Bldg Relocated drill location Set up equipment to drill well MW-38 South U-3 Boundary Well in service Continue periodic sampling 985 pCi/l (12/08/05)

Storm Drains: Jim Peters to baseline sample various yard storm drain man holes this week (near U-2 RWST, in front of U-2 cafeteria, in front of U-2 Security Command Post, etc)

NOTE: Next emphasis will be to concentrate on MW-48. This location is south of MW-38, and represents the most southerly sample point.

MW-48 will be drilled with the track mounted gas powered drill machine, whereas MW-36 and MW-37 in the Turbine Bldg will use an electric drilling machine (thus multiple MW areas will be drilled at same time).

The next steps for MW-48 will be to get the engineering paper work in place. jack hammer the pavement, and begin vacuum truck soil excavation so as to be ready for drilling machine when it completes MW-32.

RECENT TREND INFORMATION:

(Activity in pCi/L)

MONITORING WELLS:

DATE: 11/24/05 12/08/05 12/19/05 12/30/05 MW-30: 600,000 (ONLY SAMPLE TO DATE)

MW-31: 4061 MW-32: STILL DRILLING MW-33: 199,000 220,000 MW-34: 121,000 147,000 MW-35: 76,000 80,500 MW-ill: 192,000 212,000 MW-38: 985 atI STORM DRAINS (SAMPLES TAKEN DURING 12/16-12/21/05)