{{#Wiki_filter:July 26, 2006 Enclosure Contains Safeguards Information.When Separated from enclosure, this
{{#Wiki_filter:uly 26, 2006


document is not Safeguards Information.
==SUBJECT:==
 
PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2006008
Mr. Michael Balduzzi Site Vice President
 
Entergy Nuclear Operations, Inc.
 
Pilgrim Nuclear Power Station
 
600 Rocky Hill Road
 
Plymouth, MA 02360-5508SUBJECT:PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2006008


==Dear Mr. Balduzzi:==
==Dear Mr. Balduzzi:==
On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more
On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on June 16, 2006, with Mr. Fred Marcussen, Security Manager, and other members of your staff.
 
of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The
 
enclosed report documents the inspection results, which were discussed on June 16, 2006, with
 
Mr. Fred Marcussen, Security Manager, and other members of your staff.
 
The inspection examined activities conducted under y our license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed
 
personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE____/RA/___________ DATE:_07/26/06
_ M. Balduzzi2 No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY:
Energy Act, Safeguards Information is subject to NAME/TITLE: Raymond K. Lorson, Chief civil and criminal penalties  ORGANIZATION: RI/DRS/PSB1 BASIS: DG-SG-1:_(300) Physical Protection Program SIGNATURE____/RA/___________ DATE:_07/26/06_ No findings of significance were identified.


available for public inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
 
document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.


Sincerely,
Sincerely,
/RA/Raymond K. Lorson, Chief Plant Support Branch 1
/RA/
 
Raymond K. Lorson, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-293 License Nos. DPR-35 Enclosure: NRC Inspection Report No. 05000293/2006008 (CONTAINS (SGI)
Division of Reactor SafetyDocket Nos.50-293License Nos.DPR-35Enclosure:NRC Inspection Report No. 05000293/2006008 (CONTAINS (SGI)
cc w/encl; w/SGI F. Marcussen, Manager - Nuclear Security C. McCombs, Director, Massachusetts Emergency Management Agency cc w/o encl w/o SGI:
cc w/encl; w/SGI F. Marcussen, Manager - Nuclear Security C. McCombs, Director, Massachusetts Emergency Management Agency cc w/o encl w/o SGI
G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
: G. J. Taylor, Chief Executive Officer, Entergy Operations
 
M. Kansler, President, Entergy Nuclear Operations, Inc.
 
J. T. Herron, Senior Vice President and Chief Operating Officer
 
C. Schwarz, Vice-President, Operations Support
 
S. J. Bethay, Director, Nuclear Safety Assurance
 
O. Limpias, Vice President, Engineering
 
J. F. McCann, Director, Licensing
 
C. D. Faison, Manager, Licensing


M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.


B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, In
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
}}
}}

Revision as of 15:55, 23 November 2019

IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection
ML062070396
Person / Time
Site: Pilgrim
Issue date: 07/26/2006
From: Ray Lorson
Plant Support Branch 1
To: Balduzzi M
Entergy Nuclear Operations
References
IR-06-008
Download: ML062070396 (4)


Text

uly 26, 2006

SUBJECT:

PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2006008

Dear Mr. Balduzzi:

On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on June 16, 2006, with Mr. Fred Marcussen, Security Manager, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY:

Energy Act, Safeguards Information is subject to NAME/TITLE: Raymond K. Lorson, Chief civil and criminal penalties ORGANIZATION: RI/DRS/PSB1 BASIS: DG-SG-1:_(300) Physical Protection Program SIGNATURE____/RA/___________ DATE:_07/26/06_ No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Raymond K. Lorson, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-293 License Nos. DPR-35 Enclosure: NRC Inspection Report No. 05000293/2006008 (CONTAINS (SGI)

cc w/encl; w/SGI F. Marcussen, Manager - Nuclear Security C. McCombs, Director, Massachusetts Emergency Management Agency cc w/o encl w/o SGI:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.