IR 05000341/2007404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled. June 28, 2007Mr. Jack M. DavisSenior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166SUBJECT:FERMI POWER PLANT, UNIT 2NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007404(DRS)
{{#Wiki_filter:une 28, 2007
 
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007404(DRS)


==Dear Mr. Davis:==
==Dear Mr. Davis:==
On May 18, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 18, 2007, with Mr. J. Plona and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and the conditions of your license.
On May 18, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 18, 2007, with Mr. J. Plona and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.
 
EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: 5 Nuclear Regulatory Commission review required before public Enclosure contains Safeguards Information. Upon release. separation, this page is decontrolled.
 
G. Hansen, RIII/DRS/PSB Name and organization of person making determination.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This report documents one finding of very low security significance (i.e., Green as determinedby the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.EXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5  Nuclear Regulatory Commission review required before publicrelease.G. Hansen, RIII/DRS/PSB  Name and organization of person making determination.
Date of determination: 6/13/07 NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of this violation, and because it was entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2.


Date of determination: 6/13/07 Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.J. Davis-2-NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section VI.A.1 ofthe NRC Enforcement Policy because of the very low security significance of this violation, and because it was entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2.The finding was NRC-identified.
The finding was NRC-identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.J. Davis-3-Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
Enclosure contains Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/Eric Duncan, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-341License No. NPF-43Nonpublic Enclosure: Inspection Report 05000341/2007404(DRS) w/Attachment: Supplemental Information ( )cc w/encl ( )
/RA/
:D. Riffle, NSIR/DSO/DDSOM. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Michigancc w/o encl ( )
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2007404(DRS)
:J. Plona, Vice President, Nuclear GenerationK. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management DivisionSEE PREVIOUS CONCURRENCESDOCUMENT NAME: C:\FileNet\ML071840401.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGHansen:co DAL forCLipaDFunk ERD forEDuncanDATE06/22/07 06/28/0706/22/0706/28/0706/28/07OFFICIAL RECORD COPY Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.J. Davis-3-Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.
w/Attachment: Supplemental Information ( )
cc w/encl ( ):
D. Riffle, NSIR/DSO/DDSO M. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Michigan cc w/o encl ( ):
J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division Enclosure contains Safeguards Information. Upon separation, this page is decontrolled.
 
SEE PREVIOUS CONCURRENCES DOCUMENT NAME: C:\FileNet\ML071840401.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII  RIII  RIII NAME GHansen:co DAL for  CLipa  DFunk ERD for  EDuncan 06/22/07 06/28/07  06/28/07 DATE 06/22/07 06/28/07 OFFICIAL RECORD COPY Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/Eric Duncan, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-341License No. NPF-43Nonpublic Enclosure: Inspection Report 05000341/2007404(DRS) w/Attachment: Supplemental Information ( )cc w/encl ( )
/RA/
:D. Riffle, NSIR/DSO/DDSOM. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Michigancc w/o encl ( )
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2007404(DRS)
:J. Plona, Vice President, Nuclear GenerationK. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.Letter to Jack from Eric Duncan dated June 28, 2007.SUBJECT:FERMI POWER PLANT, UNIT 2NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007404(DRS)ADAMS Distribution: w/out encl ( )TEBLXR1 AXM8 RidsNrrDirsIrib GEG KGO RMM3 CAA1 LSL (electronic IR's only)
w/Attachment: Supplemental Information ( )
C. Pederson, DRS (hard copy - IR's only)
cc w/encl ( ):
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov
D. Riffle, NSIR/DSO/DDSO M. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Michigan cc w/o encl ( ):
J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division Enclosure contains Safeguards Information. Upon separation, this page is decontrolled. Letter to Jack from Eric Duncan dated June 28, 2007.
 
SUBJECT: FERMI POWER PLANT, UNIT 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007404(DRS)
ADAMS Distribution: w/out encl ( )
TEB LXR1 AXM8 RidsNrrDirsIrib GEG KGO RMM3 CAA1 LSL (electronic IRs only)
C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov Enclosure contains Safeguards Information. Upon separation, this page is decontrolled.
}}
}}

Revision as of 04:52, 23 November 2019

IR 05000341-07-404(DRS); 05/14/2007 - 05/18/2007; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection - Cover Letter
ML071840401
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/28/2007
From: Eric Duncan
Plant Support Branch II
To: Jennifer Davis
Detroit Edison
References
IR-07-404
Download: ML071840401 (5)


Text

une 28, 2007

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007404(DRS)

Dear Mr. Davis:

On May 18, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 18, 2007, with Mr. J. Plona and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before public Enclosure contains Safeguards Information. Upon release. separation, this page is decontrolled.

G. Hansen, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 6/13/07 NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of this violation, and because it was entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2.

The finding was NRC-identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Enclosure contains Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2007404(DRS)

w/Attachment: Supplemental Information ( )

cc w/encl ( ):

D. Riffle, NSIR/DSO/DDSO M. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Michigan cc w/o encl ( ):

J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division Enclosure contains Safeguards Information. Upon separation, this page is decontrolled.

SEE PREVIOUS CONCURRENCES DOCUMENT NAME: C:\FileNet\ML071840401.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME GHansen:co DAL for CLipa DFunk ERD for EDuncan 06/22/07 06/28/07 06/28/07 DATE 06/22/07 06/28/07 OFFICIAL RECORD COPY Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2007404(DRS)

w/Attachment: Supplemental Information ( )

cc w/encl ( ):

D. Riffle, NSIR/DSO/DDSO M. Layton, NSIR/DSP/MTWSB State Liaison Officer, State of Michigan cc w/o encl ( ):

J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division Enclosure contains Safeguards Information. Upon separation, this page is decontrolled. Letter to Jack from Eric Duncan dated June 28, 2007.

SUBJECT: FERMI POWER PLANT, UNIT 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007404(DRS)

ADAMS Distribution: w/out encl ( )

TEB LXR1 AXM8 RidsNrrDirsIrib GEG KGO RMM3 CAA1 LSL (electronic IRs only)

C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov Enclosure contains Safeguards Information. Upon separation, this page is decontrolled.