{{#Wiki_filter:September 12, | {{#Wiki_filter:September 12, 2007 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 | ||
==SUBJECT:== | ==SUBJECT:== | ||
OCONEE NUCLEAR STATION, UNIT 2 - COMPLETION OF ACTIONS | OCONEE NUCLEAR STATION, UNIT 2 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-022 (TAC NO. MD4166) | ||
==Dear Mr. Hamilton:== | ==Dear Mr. Hamilton:== | ||
On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued | On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-022 (ML070790113) regarding dissimilar metal welds in the pressurizers at Oconee Nuclear Generating Station, Units 2 and 3. This letter acknowledges receipt of your letter dated May 29, 2007 (ML071560504) informing the NRC of actions taken at Oconee Unit 2 in response to this CAL. | ||
In your letter, you informed the NRC that the mitigative repairs for Oconee Unit 2, as listed on of your commitment letter dated January 31, 2007 (ML070390049), as supplemented on February 22, 2007 (ML070600169), had been completed during the 2EOC22 refueling outage. Thus, the actions required to satisfy the CAL for Unit 2 were complete. | |||
Based on your letter, the NRC staff concluded that all the commitments listed in the CAL and supporting commitment letters have been met for Oconee Unit 2. With respect to Oconee Unit 2, no further response is required regarding the CAL and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. This action closes TAC No. MD4166. | |||
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility. | |||
Since the CAL addressed Oconee Units 2 and 3, it will remain open until all CAL commitments pertaining to Oconee Unit 3 are complete. TAC No. MD4167 for Unit 3 will also remain open. | |||
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). | |||
B. Hamilton In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html. | |||
Sincerely, | |||
/RA/ | |||
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-270 cc: See next page | |||
Resources 3825 Barrett Dr. | ML072130497 OFFICE DCI/CPNB DCI/CPNB LPL2-1/PM LPL2-1/LA LPL2-1/BC Lead Eng NAME TLupold TChan LOlshan:nc MOBrien EMarinos DATE 8 21/07 8/21/07 8/29/07 8/20/07 8/21/07 OFFICE DCI/D DRP/D, RGN2 DORL/D NAME MEvans CCasto CHaney DATE 8/23/07 9/11/07 9/12/07 | ||
Raleigh, NC | |||
Oconee Nuclear Station, Units 1, 2, and 3 cc: | |||
Mr. Bruce H. Hamilton Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr. | |||
Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St. | |||
Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr. | |||
Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr. | |||
Suite 705 Mr. Charles Brinkman Rosslyn, VA 22209 Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport 12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation Ms. Kathryn B. Nolan ON03RC Senior Counsel 7800 Rochester Highway Duke Energy Carolinas, LLC Seneca, SC 29672 526 South Church Street - EC07H Charlotte, NC 28202}} | |||
Revision as of 04:00, 23 November 2019
| ML072130497 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/12/2007 |
| From: | Olshan L NRC/NRR/ADRO/DORL/LPLII-1 |
| To: | Brandi Hamilton Duke Power Co |
| Olshan L N, NRR/DORL, 415-1419 | |
| References | |
| TAC MD4166, NRR-07-022 | |
| Download: ML072130497 (4) | |
Text
September 12, 2007 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
OCONEE NUCLEAR STATION, UNIT 2 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-022 (TAC NO. MD4166)
Dear Mr. Hamilton:
On March 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-022 (ML070790113) regarding dissimilar metal welds in the pressurizers at Oconee Nuclear Generating Station, Units 2 and 3. This letter acknowledges receipt of your letter dated May 29, 2007 (ML071560504) informing the NRC of actions taken at Oconee Unit 2 in response to this CAL.
In your letter, you informed the NRC that the mitigative repairs for Oconee Unit 2, as listed on of your commitment letter dated January 31, 2007 (ML070390049), as supplemented on February 22, 2007 (ML070600169), had been completed during the 2EOC22 refueling outage. Thus, the actions required to satisfy the CAL for Unit 2 were complete.
Based on your letter, the NRC staff concluded that all the commitments listed in the CAL and supporting commitment letters have been met for Oconee Unit 2. With respect to Oconee Unit 2, no further response is required regarding the CAL and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. This action closes TAC No. MD4166.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Since the CAL addressed Oconee Units 2 and 3, it will remain open until all CAL commitments pertaining to Oconee Unit 3 are complete. TAC No. MD4167 for Unit 3 will also remain open.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
B. Hamilton In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-270 cc: See next page
ML072130497 OFFICE DCI/CPNB DCI/CPNB LPL2-1/PM LPL2-1/LA LPL2-1/BC Lead Eng NAME TLupold TChan LOlshan:nc MOBrien EMarinos DATE 8 21/07 8/21/07 8/29/07 8/20/07 8/21/07 OFFICE DCI/D DRP/D, RGN2 DORL/D NAME MEvans CCasto CHaney DATE 8/23/07 9/11/07 9/12/07
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.
Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St.
Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.
Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.
Suite 705 Mr. Charles Brinkman Rosslyn, VA 22209 Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport 12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation Ms. Kathryn B. Nolan ON03RC Senior Counsel 7800 Rochester Highway Duke Energy Carolinas, LLC Seneca, SC 29672 526 South Church Street - EC07H Charlotte, NC 28202