IR 05000219/2013007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 58: Line 58:


{{a|1R21}}
{{a|1R21}}
==1R21 Component Design Bases Inspection==
==1R21 Component Design Bases Inspection
 
==OTHER ACTIVITIES====


==OTHER ACTIVITIES==
..........................................................................................................15
..........................................................................................................15



Revision as of 08:47, 17 November 2019

IR 05000219-13-007, September 9 to October 24, 2013, Oyster Creek Generating Station, NRC Component Design Bases
ML13325A089
Person / Time
Site: Oyster Creek
Issue date: 11/19/2013
From: Paul Krohn
Engineering Region 1 Branch 2
To: Pacilio M
Exelon Nuclear
Krohn P
References
IR-13-007
Download: ML13325A089 (30)


Text

UNITED STATES ovember 19, 2013

SUBJECT:

OYSTER CREEK GENERATING STATION - NRC COMPONENT DESIGN BASES INSPECTION REPORT 05000219/2013007

Dear Mr. Pacilio:

On September 23, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of an inspection at the Oyster Creek Generating Station. Inspection activities continued remotely from the NRC office until October 9, 2013. Additional onsite inspection activities were completed on October 23 and 24, 2013. The enclosed inspection report documents the inspection results, which were discussed on October 24, 2013, with Mr. R. Peak, Oyster Creek Plant Manager, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

In conducting the inspection, the team examined the adequacy of selected components and operator actions to mitigate postulated transients, initiating events, and design basis accidents.

The inspection involved field walkdowns, examination of selected procedures, calculations and records, and interviews with station personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for the public inspection in the NRC Public Docket Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Paul G. Krohn, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-219 License No. DPR-16

Enclosure:

Inspection Report No. 05000219/2013007 w/Attachment: Supplemental Information

REGION I==

Docket No.: 50-219 License No.: DPR-16 Report No.: 05000219/2013007 Licensee: Exelon Nuclear Facility: Oyster Creek Generating Station Location: Forked River, New Jersey Dates: September 9 to October 24, 2013 Inspectors: S. Pindale, Senior Reactor Inspector, Division of Reactor Safety (DRS)

Team Leader J. Schoppy, Senior Reactor Inspector, DRS D. Kern, Senior Reactor Inspector, DRS J. Patel, Reactor Inspector, DRS C. Baron, NRC Mechanical Contractor G. Nicely, NRC Electrical Contractor Approved by: Paul G. Krohn, Chief Engineering Branch 2 Division of Reactor Safety i Enclosure

Table of Contents

SUMMARY OF FINDINGS

......................................................................................................... iii

REPORT DETAILS

REACTOR SAFETY

........................................................................................................... 1

==1R21 Component Design Bases Inspection

OTHER ACTIVITIES==

..........................................................................................................15

4OA2 Identification and Resolution of Problems .............................................................15

4OA6 Meetings, including Exit ........................................................................................15

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

.................................................................................................. A-1

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED ....................................................... A-1

LIST OF DOCUMENTS REVIEWED

...................................................................................... A-2