ML080380433: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:February 12, 2008 | {{#Wiki_filter:February 12, 2008 Mr. Kevin T. Walsh Vice President of Operations Entergy Operations, Inc. | ||
17265 River Road Killona, LA 70057-3093 | |||
Mr. Kevin T. Walsh Vice President of Operations Entergy Operations, Inc. | |||
17265 River Road Killona, LA 70057-3093 | |||
==SUBJECT:== | ==SUBJECT:== | ||
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION ON LICENSE AMENDMENT REQUEST (LAR) NPF-38-271 TO SUPPORT NEXT GENERATION FUEL (TAC NO. MD6299) | WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION ON LICENSE AMENDMENT REQUEST (LAR) NPF-38-271 TO SUPPORT NEXT GENERATION FUEL (TAC NO. MD6299) | ||
==Dear Mr. Walsh:== | ==Dear Mr. Walsh:== | ||
By letter dated August 2, 2007, Entergy Operations, Inc., submitted an application requesting an amendment to Waterford Steam Electric Station, Unit 3 Technical Specifications (TS) 6.9.1.11.1, Core Operating Limits, TS 3.5.1, Safety Injection Tanks, and TS 3.6.1.5, Containment Air Temperature. | By letter dated August 2, 2007, Entergy Operations, Inc., submitted an application requesting an amendment to Waterford Steam Electric Station, Unit 3 Technical Specifications (TS) 6.9.1.11.1, Core Operating Limits, TS 3.5.1, Safety Injection Tanks, and TS 3.6.1.5, Containment Air Temperature. | ||
After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information outlined in the enclosure is needed to complete the review. Please provide the additional information requested within 30 days of the receipt of this letter. | |||
After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information outlined in the enclosure is needed to complete the review. Please provide the additional information requested within 30 days of the receipt of this letter. | If you have any questions, please contact me at (301) 415-1480. | ||
Sincerely, | |||
If you have any questions, please contact me at (301) 415-1480. | /RA/ | ||
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 Enclosure cc w/encl: See next page | |||
Sincerely, | |||
/RA/ | |||
N. Kalyanam, Project Manager | |||
Docket No. 50-382 Enclosure | |||
cc w/encl: See next page | |||
ML080380433 *No major change from Staff provided RAI OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DSS/SRXB* NRR/LPL4/BC NAME NKalyanam JBurkhardt GCranston THiltz DATE 2/11/08 2/11/08 1/31/08 2/12/08 | |||
Waterford Steam Electric Station, Unit 3 (November 2007) cc: | |||
Senior Vice President Entergy Nuclear Operations Mr. Timothy Pflieger P.O. Box 31995 Environmental Scientist - Supervisor Jackson, MS 39286-1995 REP&R-CAP-SPOC Louisiana Department of Environmental Senior Vice President and COO Quality Entergy Operations, Inc. P.O. Box 4312 P.O. Box 31995 Baton Rouge, LA 70821-4312 Jackson, MS 39286-1995 Parish President Council Vice President, Operations Support St. Charles Parish Entergy Services, Inc. P.O. Box 302 P.O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Chairman Site Vice President Louisiana Public Services Commission Waterford Steam Electric Station, Unit 3 P.O. Box 91154 Entergy Operations, Inc. Baton Rouge, LA 70825-1697 17265 River Road Killona, LA 70057-3093 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer General Manager, Plant Operations Office of Environmental Services Waterford Steam Electric Station, Unit 3 Northwestern State University Entergy Operations, Inc. Russell Hall, Room 201 17265 River Road Natchitoches, LA 71497 Killona, LA 70057-3093 Resident Inspector Director, Nuclear Safety & Licensing Waterford NPS Entergy Services, Inc. P.O. Box 822 440 Hamilton Avenue Killona, LA 70057-0751 White Plains, NY 10601 Regional Administrator, Region IV Director, Nuclear Safety Assurance U.S. Nuclear Regulatory Commission Entergy Operations, Inc. 611 Ryan Plaza Drive, Suite 400 17265 River Road Arlington, TX 76011 Killona, LA 70057-3093 Senior Manager, Nuclear Safety | |||
& Licensing Entergy Services, Inc. | |||
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc. | |||
17265 River Road Killona, LA 70057-3093 | |||
P.O. Box 31995 Jackson, MS | |||
Quality P.O. Box 4312 Baton Rouge, LA | |||
Parish President Council | |||
St. Charles Parish P.O. Box 302 Hahnville, LA | |||
Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services | |||
Northwestern State University | |||
Resident Inspector | |||
Waterford NPS P.O. Box 822 | |||
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 | |||
REQUEST FOR ADDITIONAL INFORMATION WATERFORD STEAM ELECTRIC STATION, UNIT 3 USE OF NEXT GENERATION FUEL TAC NO. MD6299 | REQUEST FOR ADDITIONAL INFORMATION WATERFORD STEAM ELECTRIC STATION, UNIT 3 USE OF NEXT GENERATION FUEL TAC NO. MD6299 | ||
: 1. For the proposed change to add items 15, 16, 17, 18, and 19 (five references) to core operating limit report Technical Specifications 6.9.1.11.1, please explain the connection or relationship between or among the referenced approved methodologies used. There | : 1. For the proposed change to add items 15, 16, 17, 18, and 19 (five references) to core operating limit report Technical Specifications 6.9.1.11.1, please explain the connection or relationship between or among the referenced approved methodologies used. There are, for example, three moderator temperature coefficient methods, four axial shape index methods, three linear heat rate methods, etc. The justification is needed because the application of these methodologies is planned for the coming cycle and many approved methodologies are proposed to support the same cycle-specific parameter. | ||
are, for example, three moderator temperature coefficient methods, four axial shape index methods, three linear heat rate methods, etc. The justification is needed because the application of these methodologies is planned for the coming cycle and many approved methodologies are proposed to support the same cycle-specific parameter. | |||
: 2. Please provide the technical basis to justify that 72.8 percent is the conservative maximum allowable safety-injection tank level.}} | : 2. Please provide the technical basis to justify that 72.8 percent is the conservative maximum allowable safety-injection tank level.}} | ||
Revision as of 19:45, 14 November 2019
| ML080380433 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/12/2008 |
| From: | Kalyanam N NRC/NRR/ADRO/DORL/LPLIV |
| To: | Walsh K Entergy Operations |
| Kalyanam N, NRR/DORL/LPL4, 415-1480 | |
| References | |
| TAC MD6299 | |
| Download: ML080380433 (4) | |
Text
February 12, 2008 Mr. Kevin T. Walsh Vice President of Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION ON LICENSE AMENDMENT REQUEST (LAR) NPF-38-271 TO SUPPORT NEXT GENERATION FUEL (TAC NO. MD6299)
Dear Mr. Walsh:
By letter dated August 2, 2007, Entergy Operations, Inc., submitted an application requesting an amendment to Waterford Steam Electric Station, Unit 3 Technical Specifications (TS) 6.9.1.11.1, Core Operating Limits, TS 3.5.1, Safety Injection Tanks, and TS 3.6.1.5, Containment Air Temperature.
After reviewing your request, the Nuclear Regulatory Commission staff has determined that additional information outlined in the enclosure is needed to complete the review. Please provide the additional information requested within 30 days of the receipt of this letter.
If you have any questions, please contact me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 Enclosure cc w/encl: See next page
ML080380433 *No major change from Staff provided RAI OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DSS/SRXB* NRR/LPL4/BC NAME NKalyanam JBurkhardt GCranston THiltz DATE 2/11/08 2/11/08 1/31/08 2/12/08
Waterford Steam Electric Station, Unit 3 (November 2007) cc:
Senior Vice President Entergy Nuclear Operations Mr. Timothy Pflieger P.O. Box 31995 Environmental Scientist - Supervisor Jackson, MS 39286-1995 REP&R-CAP-SPOC Louisiana Department of Environmental Senior Vice President and COO Quality Entergy Operations, Inc. P.O. Box 4312 P.O. Box 31995 Baton Rouge, LA 70821-4312 Jackson, MS 39286-1995 Parish President Council Vice President, Operations Support St. Charles Parish Entergy Services, Inc. P.O. Box 302 P.O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Chairman Site Vice President Louisiana Public Services Commission Waterford Steam Electric Station, Unit 3 P.O. Box 91154 Entergy Operations, Inc. Baton Rouge, LA 70825-1697 17265 River Road Killona, LA 70057-3093 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer General Manager, Plant Operations Office of Environmental Services Waterford Steam Electric Station, Unit 3 Northwestern State University Entergy Operations, Inc. Russell Hall, Room 201 17265 River Road Natchitoches, LA 71497 Killona, LA 70057-3093 Resident Inspector Director, Nuclear Safety & Licensing Waterford NPS Entergy Services, Inc. P.O. Box 822 440 Hamilton Avenue Killona, LA 70057-0751 White Plains, NY 10601 Regional Administrator, Region IV Director, Nuclear Safety Assurance U.S. Nuclear Regulatory Commission Entergy Operations, Inc. 611 Ryan Plaza Drive, Suite 400 17265 River Road Arlington, TX 76011 Killona, LA 70057-3093 Senior Manager, Nuclear Safety
& Licensing Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093
REQUEST FOR ADDITIONAL INFORMATION WATERFORD STEAM ELECTRIC STATION, UNIT 3 USE OF NEXT GENERATION FUEL TAC NO. MD6299
- 1. For the proposed change to add items 15, 16, 17, 18, and 19 (five references) to core operating limit report Technical Specifications 6.9.1.11.1, please explain the connection or relationship between or among the referenced approved methodologies used. There are, for example, three moderator temperature coefficient methods, four axial shape index methods, three linear heat rate methods, etc. The justification is needed because the application of these methodologies is planned for the coming cycle and many approved methodologies are proposed to support the same cycle-specific parameter.
- 2. Please provide the technical basis to justify that 72.8 percent is the conservative maximum allowable safety-injection tank level.