ML081280003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 9, 2008  
{{#Wiki_filter:May 9, 2008 Vice President, Operations Entergy Operations, Inc.
 
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093  


==SUBJECT:==
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVIEW OF THE 180-DAY STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 14TH REFUELING OUTAGE - (TAC NO. MD5950)  
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVIEW OF THE 180-DAY STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 14TH REFUELING OUTAGE - (TAC NO. MD5950)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


By letter dated June 21, 2007 ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML071730476), Entergy Operations, Inc. (the licensee) submitted information, pursuant to Technical Specification (TS) 6.9.1.5, summarizing the scope, methods, and results of the Fall 2006 steam generator (SG) tube inspections (during Refueling Outage 14) at Waterford Steam Electric Station, Unit 3 (Waterford 3). Additional details of these inspections are documented in a conference call summary dated February 7, 2007 (ADAMS Accession No. ML070520209).  
By letter dated June 21, 2007 ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML071730476), Entergy Operations, Inc. (the licensee) submitted information, pursuant to Technical Specification (TS) 6.9.1.5, summarizing the scope, methods, and results of the Fall 2006 steam generator (SG) tube inspections (during Refueling Outage 14) at Waterford Steam Electric Station, Unit 3 (Waterford 3). Additional details of these inspections are documented in a conference call summary dated February 7, 2007 (ADAMS Accession No. ML070520209).
 
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensee's June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensee's efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.  
Sincerely,
 
                                            /RA/
Sincerely,  
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page
 
/RA/  
 
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket No. 50-382  
 
cc w/encl: See next page
 
ML070520209).
 
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensee's June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensee's efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available. Sincerely,
/RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket No. 50-382
 
cc w/encl:  See next page
 
DISTRIBUTION
:  PUBLIC    LPLIV Reading  RidsNrrDorlDpr RidsNrrDorlLpl4  RidsNrrPMNKalyanam RidsNrrLAGLappert RidsOgcRp    RidsRgn4MailCenter  RidsNrrDciCsgb JAdams, EDO RIV  RidsAcrsAcnwMailCenter
 
ADAMS Accession No. ML081280003  *Concurrence via memorandum OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DCI/CSGB NRR/LPL4/BC NAME NKalyanam GLappert AHiser* THiltz DATE 5/7/08 5/7/08 5/5/08 5/9/08 Waterford Steam Electric Station, Unit 3      (2/25/08)
 
cc:
 
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Manager, Nuclear Safety
& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Vice President
  & Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS  39286-1995
 
Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Manager, Licensing Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA  70057-3093
 
Mr. Timothy Pflieger Environmental Scientist - Supervisor REP&R-CAP-SPOC Louisiana Department of Environmental Quality P.O. Box 4312 Baton Rouge, LA  70821-4312
 
Parish President Council St. Charles Parish P.O. Box 302 Hahnville, LA  70057
 
Chairman Louisiana Public Services Commission P.O. Box 91154 Baton Rouge, LA  70825-1697
 
Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA  71497


Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70057-0751
ML070520209).
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.
Sincerely,
                                            /RA/
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page DISTRIBUTION:
PUBLIC                                LPLIV Reading                RidsNrrDorlDpr RidsNrrDorlLpl4                      RidsNrrPMNKalyanam          RidsNrrLAGLappert RidsOgcRp                            RidsRgn4MailCenter          RidsNrrDciCsgb JAdams, EDO RIV                      RidsAcrsAcnwMailCenter ADAMS Accession No. ML081280003                      *Concurrence via memorandum OFFICE          NRR/LPL4/PM        NRR/LPL4/LA         NRR/DCI/CSGB      NRR/LPL4/BC NAME            NKalyanam          GLappert            AHiser*          THiltz DATE            5/7/08            5/7/08              5/5/08            5/9/08


Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011}}
Waterford Steam Electric Station, Unit 3                              (2/25/08) cc:
Mr. Timothy Pflieger Senior Vice President                    Environmental Scientist - Supervisor Entergy Nuclear Operations              REP&R-CAP-SPOC P.O. Box 31995                          Louisiana Department of Environmental Jackson, MS 39286-1995                    Quality P.O. Box 4312 Vice President, Oversight                Baton Rouge, LA 70821-4312 Entergy Nuclear Operations P.O. Box 31995                          Parish President Council Jackson, MS 39286-1995                  St. Charles Parish P.O. Box 302 Senior Manager, Nuclear Safety          Hahnville, LA 70057
& Licensing Entergy Nuclear Operations              Chairman P.O. Box 31995                          Louisiana Public Services Commission Jackson, MS 39286-1995                  P.O. Box 91154 Baton Rouge, LA 70825-1697 Senior Vice President
  & Chief Operating Officer              Mr. Richard Penrod, Senior Environmental Entergy Operations, Inc.                  Scientist/State Liaison Officer P.O. Box 31995                          Office of Environmental Services Jackson, MS 39286-1995                  Northwestern State University Russell Hall, Room 201 Associate General Counsel                Natchitoches, LA 71497 Entergy Nuclear Operations P.O. Box 31995                          Resident Inspector Jackson, MS 39286-1995                  Waterford NPS P.O. Box 822 Manager, Licensing                      Killona, LA 70057-0751 Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 Regional Administrator, Region IV 17265 River Road                        U.S. Nuclear Regulatory Commission Killona, LA 70057-3093                  611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011}}

Revision as of 17:04, 14 November 2019

Review of the 180-Day Steam Generator Tube Inspection Report for the 14th Refueling Outage
ML081280003
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/09/2008
From: Kalyanam N
NRC/NRR/ADRO/DORL/LPLIV
To:
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC MD5950
Download: ML081280003 (3)


Text

May 9, 2008 Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REVIEW OF THE 180-DAY STEAM GENERATOR TUBE INSPECTION REPORT FOR THE 14TH REFUELING OUTAGE - (TAC NO. MD5950)

Dear Sir or Madam:

By letter dated June 21, 2007 ((Agencywide Documents Access and Management System (ADAMS) Accession No. ML071730476), Entergy Operations, Inc. (the licensee) submitted information, pursuant to Technical Specification (TS) 6.9.1.5, summarizing the scope, methods, and results of the Fall 2006 steam generator (SG) tube inspections (during Refueling Outage 14) at Waterford Steam Electric Station, Unit 3 (Waterford 3). Additional details of these inspections are documented in a conference call summary dated February 7, 2007 (ADAMS Accession No. ML070520209).

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page

ML070520209).

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees June 21, 2007 report and concludes that the licensee provided the information required by their TS. The NRC staff review of this report did not identify any new technical issues that warrant follow-up action. The NRC staff will continue to monitor the licensees efforts to manage the damaged batwing supports and to ensure that no significant consequential damage of the SG tubing is occurring. The licensee met with the NRC staff on February 12, 2008 (ADAMS Accession No. ML080510251) to discuss the status of its batwing management program and their plans for inspecting the batwings and tubes during the spring 2008 refueling outage. In addition, the licensee will brief the NRC staff by phone on the inspection results when the results become available.

Sincerely,

/RA/

N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLIV Reading RidsNrrDorlDpr RidsNrrDorlLpl4 RidsNrrPMNKalyanam RidsNrrLAGLappert RidsOgcRp RidsRgn4MailCenter RidsNrrDciCsgb JAdams, EDO RIV RidsAcrsAcnwMailCenter ADAMS Accession No. ML081280003 *Concurrence via memorandum OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DCI/CSGB NRR/LPL4/BC NAME NKalyanam GLappert AHiser* THiltz DATE 5/7/08 5/7/08 5/5/08 5/9/08

Waterford Steam Electric Station, Unit 3 (2/25/08) cc:

Mr. Timothy Pflieger Senior Vice President Environmental Scientist - Supervisor Entergy Nuclear Operations REP&R-CAP-SPOC P.O. Box 31995 Louisiana Department of Environmental Jackson, MS 39286-1995 Quality P.O. Box 4312 Vice President, Oversight Baton Rouge, LA 70821-4312 Entergy Nuclear Operations P.O. Box 31995 Parish President Council Jackson, MS 39286-1995 St. Charles Parish P.O. Box 302 Senior Manager, Nuclear Safety Hahnville, LA 70057

& Licensing Entergy Nuclear Operations Chairman P.O. Box 31995 Louisiana Public Services Commission Jackson, MS 39286-1995 P.O. Box 91154 Baton Rouge, LA 70825-1697 Senior Vice President

& Chief Operating Officer Mr. Richard Penrod, Senior Environmental Entergy Operations, Inc. Scientist/State Liaison Officer P.O. Box 31995 Office of Environmental Services Jackson, MS 39286-1995 Northwestern State University Russell Hall, Room 201 Associate General Counsel Natchitoches, LA 71497 Entergy Nuclear Operations P.O. Box 31995 Resident Inspector Jackson, MS 39286-1995 Waterford NPS P.O. Box 822 Manager, Licensing Killona, LA 70057-0751 Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 Regional Administrator, Region IV 17265 River Road U.S. Nuclear Regulatory Commission Killona, LA 70057-3093 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011