{{#Wiki_filter:Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 February 20, 2009 10 CFR 26. | {{#Wiki_filter:Entergy Nuclear Operations, Inc. | ||
DPR-20 Fitness for Dutv Program Performance Report | Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 February 20, 2009 10 CFR 26.717(e) | ||
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Program Performance Report | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with 10 CFR 26. | |||
Laurie A. Lahti Licensing Manager Palisades Nuclear Plant Enclosures (2) CC Administrator, Region Ill, USMRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ENCLOSURE 1 PALISADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE | In accordance with 10 CFR 26.717(e), Entergy Nuclear Operations, Inc. is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1, 2008, through December 31, 2008. | ||
Enclosures 1 and 2 summarize the test results at the PNP. | |||
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments. | |||
Laurie A. Lahti Licensing Manager Palisades Nuclear Plant Enclosures (2) | |||
CC Administrator, Region Ill, USMRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC | |||
ENCLOSURE 1 PALISADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE | |||
==SUMMARY== | ==SUMMARY== | ||
July 1 through December 31,2008 1. MANAGEMENT | |||
July 1 through December 31,2008 | |||
: 1. MANAGEMENT | |||
==SUMMARY== | ==SUMMARY== | ||
A. RANDOM TESTING During this reporting period, a total of 210 random tests were conducted with the following results: Donor Group Random Tests Results Employees | A. RANDOM TESTING During this reporting period, a total of 210 random tests were conducted with the following results: | ||
C. FOR CAUSUPOST-ACCIDENT TESTING Four post-accident tests and one for cause test were administered during the reporting period. | Donor Group Random Tests Results Employees Random testing identified one positive drug result and one positive alcohol result. | ||
The results of the five tests were negative. | Contractors Random testing identified no positive drug/alcohol results. | ||
D. FOLLOW-UP TESTING One individual tested positive for alcohol during follow-up testing. The individual's site access was terminated for a minimum of three years. Page 1 of 2 E. APPEALS The appeals process was initiated once during this reporting period. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered one fitness for duty event that required reporting in accordance with 10 CFR 26.73 when a contract supervisor tested positive for alcohol during follow-up testing. | One licensee employee tested positive for amphetamines, and one licensee employee tested positive for alcohol during random testing. Both employees were denied access to the site for a minimum of 14 days and were given a mandatory referral to the Employee Assistance Program. The employees have been returned to work and placed in a "follow-up" testing program. | ||
Page 2 of 2 ENCLOSURE 2 PALISADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,2008 Entergy Nuclear Operations, Inc. | The percentage of random tests conducted during the period was 23%. The percentage of random tests conducted for 2008 was 54%. | ||
Company Palisades Nuclear Plant Location | B. PRE-ACCESS TESTING A total of 178 pre-access tests were conducted during this reporting period. | ||
Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 / Cocaine 300 / 150 Phencyclidine 25 / 25 / Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04 / *Any detectable amount for situa | C. FOR CAUSUPOST-ACCIDENT TESTING Four post-accident tests and one for cause test were administered during the reporting period. The results of the five tests were negative. | ||
#Positive | D. FOLLOW-UP TESTING One individual tested positive for alcohol during follow-up testing. The individual's site access was terminated for a minimum of three years. | ||
--- --- --- --- --- --- | Page 1 of 2 | ||
E. APPEALS The appeals process was initiated once during this reporting period. | |||
REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered one fitness for duty event that required reporting in accordance with 10 CFR 26.73 when a contract supervisor tested positive for alcohol during follow-up testing. | |||
Page 2 of 2 | |||
ENCLOSURE 2 PALISADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,2008 Entergy Nuclear Operations, Inc. c Company 6 Months Ending Palisades Nuclear Plant Location 269-764-2565 Phone (~ncludeAreacode) | |||
Mike Nock Contact Name Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 / | |||
Cocaine 300 / 150 Phencyclidine 25 / 25 / | |||
Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04 / | |||
*Any detectable amount for situa :ions other than random. | |||
Long-Term Short-Term Testing Results Licensee Contractor Contractor Personnel Employees Personnel Average Number With Unescorted Access | |||
#Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access --- --- | |||
51 0 127 0 FOR Post- 0 0 --- --- 4 0 CAUSE Accident Observed 1 0 --- --- 0 0 Behavior Random 135 2 --- --- 75 0 FoIIow-UP 19 0 --- --- 16 1 Other 0 0 --- --- 0 0 TOTAL 206 2 - - 222 1 Page 1 of 2 | |||
Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees 1 1 Long-Term Contractors Short-Term Contractors 1 Total 1 2 3 Page 2 of 2}} | |||
Revision as of 08:46, 14 November 2019
| ML090510660 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/20/2009 |
| From: | Lahti L Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML090510660 (5) | |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 February 20, 2009 10 CFR 26.717(e)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Program Performance Report
Dear Sir or Madam:
In accordance with 10 CFR 26.717(e), Entergy Nuclear Operations, Inc. is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1, 2008, through December 31, 2008.
Enclosures 1 and 2 summarize the test results at the PNP.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Laurie A. Lahti Licensing Manager Palisades Nuclear Plant Enclosures (2)
CC Administrator, Region Ill, USMRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ENCLOSURE 1 PALISADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE
SUMMARY
July 1 through December 31,2008
- 1. MANAGEMENT
SUMMARY
A. RANDOM TESTING During this reporting period, a total of 210 random tests were conducted with the following results:
Donor Group Random Tests Results Employees Random testing identified one positive drug result and one positive alcohol result.
Contractors Random testing identified no positive drug/alcohol results.
One licensee employee tested positive for amphetamines, and one licensee employee tested positive for alcohol during random testing. Both employees were denied access to the site for a minimum of 14 days and were given a mandatory referral to the Employee Assistance Program. The employees have been returned to work and placed in a "follow-up" testing program.
The percentage of random tests conducted during the period was 23%. The percentage of random tests conducted for 2008 was 54%.
B. PRE-ACCESS TESTING A total of 178 pre-access tests were conducted during this reporting period.
C. FOR CAUSUPOST-ACCIDENT TESTING Four post-accident tests and one for cause test were administered during the reporting period. The results of the five tests were negative.
D. FOLLOW-UP TESTING One individual tested positive for alcohol during follow-up testing. The individual's site access was terminated for a minimum of three years.
Page 1 of 2
E. APPEALS The appeals process was initiated once during this reporting period.
REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered one fitness for duty event that required reporting in accordance with 10 CFR 26.73 when a contract supervisor tested positive for alcohol during follow-up testing.
Page 2 of 2
ENCLOSURE 2 PALISADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31,2008 Entergy Nuclear Operations, Inc. c Company 6 Months Ending Palisades Nuclear Plant Location 269-764-2565 Phone (~ncludeAreacode)
Mike Nock Contact Name Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 /
Cocaine 300 / 150 Phencyclidine 25 / 25 /
Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04 /
- Any detectable amount for situa :ions other than random.
Long-Term Short-Term Testing Results Licensee Contractor Contractor Personnel Employees Personnel Average Number With Unescorted Access
- Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access --- ---
51 0 127 0 FOR Post- 0 0 --- --- 4 0 CAUSE Accident Observed 1 0 --- --- 0 0 Behavior Random 135 2 --- --- 75 0 FoIIow-UP 19 0 --- --- 16 1 Other 0 0 --- --- 0 0 TOTAL 206 2 - - 222 1 Page 1 of 2
Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees 1 1 Long-Term Contractors Short-Term Contractors 1 Total 1 2 3 Page 2 of 2