{{#Wiki_filter:MN No. 09-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING  
{{#Wiki_filter:MN No. 09-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING April 8, 2009 Licensee:            Dominion Nuclear Connecticut, Inc.
Facility:            Millstone Power Station Docket No.            50-336 and 50-423 Date and Time:        April 23, 2009 at 3:00 p.m.
Location:            Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Purpose:              To discuss NRCs assessment of the safety performance of the Millstone Power Station for calendar year 2008 and the role of the NRC in ensuring safe plant operations.
NRC Attendees:        R. Bellamy, Chief, Projects Branch 6, Region I S. Shaffer, Senior Resident Inspector J. Krafty, Resident Inspector B. Haagensen, Resident Inspector C. Sanders, Project Manager, Nuclear Reactor Regulation Licensee Attendees: A. J. Jordan, Site Vice President L. Morris, Plant Manager R. Griffin, Director, Nuclear Station Safety and Licensing R. MacManus, Director, Nuclear Engineering R. Barron, Manager of Nuclear Oversight Department Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Meeting Contact:      Dr. Ronald Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.


April 8, 2009 Licensee: Dominion Nuclear Connecticut, Inc.  
2 The NRCs Annual Assessment letter for the Millstone Power Station can be located in ADAMS with Accession Number ML090630229. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090980084. The NRC slides for the meeting can be located in ADAMS with Accession Number ML090980064. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRCs Annual Assessment process and the safety performance of the Millstone Power Station can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by NRC personnel at this meeting should be made known by April 17, 2009, via telephone to the NRC meeting contact.
Approved by: __/RA/__      _______________
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects cc w/ encl:
J. Price, Vice President, Engineering, Dominion Fleet A. Jordan, Site Vice President, Millstone Station C. Funderburk, Director, Nuclear Licensing and Operations Support L. Morris, Plant Manager, Millstone Station W. Barton, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Chair, NEAC P. Rathbun, Vice-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, Citizens Awareness Network (CAN)
P. Eddy, Electric Division, Department of Public Service, State of New York F. Murray, President and CEO, New York State Energy Research and Development Authority A. Peterson, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.


Facility:  Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 23, 2009 at 3:00 p.m.
3 Agenda NRCs Annual Assessment Meeting Millstone Power Station April 23, 2009 3:00 - 5:00 pm Introduction ............................................................................................. NRC (5 minutes)
 
Review of Reactor Oversight Process .................................................... NRC (10 minutes)
Location:  Waterford Town Hall    15 Rope Ferry Road    Waterford, CT 06385 Purpose:  To discuss NRC's assessment of the safety performance of the Millstone Power Station for calendar year 2008 and the role of the NRC in ensuring safe plant operations.
NRC Attendees: R. Bellamy, Chief, Projects Branch 6, Region I S. Shaffer, Senior Resident Inspector    J. Krafty, Resident Inspector    B. Haagensen, Resident Inspector    C. Sanders, Project Manager, Nuclear Reactor Regulation Licensee Attendees: A. J. Jordan, Site Vice President L. Morris, Plant Manager R. Griffin, Director, Nuclear Station Safety and Licensing R. MacManus, Director, Nuclear Engineering R. Barron, Manager of Nuclear Oversight Department
 
Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Meeting Contact: Dr. Ronald Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.
 
2  The NRC's Annual Assessment letter for the Millstone Power Station can be located in ADAMS with Accession Number ML090630229. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090980084. The NRC slides for the meeting can be located in ADAMS with Accession Number ML090980064. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html
. Additional information relative to the NRC's Annual Assessment process and the safety performance of the Millstone Power Station can be found on the NRC's web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC
=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 17, 2009, via  telephone to the NRC meeting contact.
Approved by: __/RA/__        _______________
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects cc w/ encl
: J. Price, Vice President, Engineering, Dominion Fleet A. Jordan, Site Vice President, Millstone Station C. Funderburk, Director, Nuclear Licensing and Operations Support L. Morris, Plant Manager, Millstone Station W. Barton, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Chair, NEAC P. Rathbun, Vice-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) R. Bassilakis, Citizens Awareness Network (CAN) P. Eddy, Electric Division, Department of Public Service, State of New York F. Murray, President and CEO, New York State Energy Research and Development Authority A. Peterson, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.
3   Agenda NRC's Annual Assessment Meeting Millstone Power Station April 23, 2009 3:00 - 5:00 pm Introduction  
............................................................................................. NRC (5 minutes)
Review of Reactor Oversight Process  
.................................................... NRC (10 minutes)
Discussion of Millstone Power Station Performance ............................... NRC (10 minutes)
Discussion of Millstone Power Station Performance ............................... NRC (10 minutes)
Dominion's Response and Remarks ............................................... Dominion (25 minutes)
Dominions Response and Remarks ............................................... Dominion (25 minutes)
Closing Remarks ...................................................................................... NRC (5 minutes)
Closing Remarks ...................................................................................... NRC (5 minutes)
 
Short Break ...................................................................................................... (5 minutes)
Short Break ...................................................................................................... (5 minutes)
NRC to address public questions ....................... NRC/Members of the Public (as needed)
NRC to address public questions ....................... NRC/Members of the Public (as needed)


2 The NRC's Annual Assessment letter for the Millstone Power Station can be located in ADAMS with Accession Number ML090630229. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090980084. The NRC slides for the meeting can be located in ADAMS with Accession Number ML090980064. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html
2 The NRCs Annual Assessment letter for the Millstone Power Station can be located in ADAMS with Accession Number ML090630229. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090980084. The NRC slides for the meeting can be located in ADAMS with Accession Number ML090980064. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.
. Additional information relative to the NRC's Annual Assessment process and the safety performance of the Millstone Power Station can be found on the NRC's web site at:
Additional information relative to the NRCs Annual Assessment process and the safety performance of the Millstone Power Station can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by NRC personnel at this meeting should be made known by April 17, 2009, via telephone to the NRC meeting contact.
Attendance by NRC personnel at this meeting should be made known by April 17, 2009, via telephone to the NRC meeting contact.
 
Approved by: ____/RA/                   _______________
Approved by: ____/RA/       _______________
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution:
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects  
See next page SUNSI Review Complete:                   RRR               (Reviewers Initials)
 
DOCUMENT: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\MILLSTONE\MS AA MEETING NOTICE ROP 9.DOC ML090980084 After declaring this document An Official Agency Record it will be released to the Public.
Distribution:   See next page  
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE                 RI/DRP                           RI/DRP NAME                   SBarber/SB                         RBellamy/RRR DATE                   04/08 /09                         04/ 08 /09 OFFICIAL RECORD COPY
 
SUNSI Review Complete:   RRR             (Reviewer's Initials) DOCUMENT: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\MILLSTONE\MS AA MEETING NOTICE ROP 9.DOC ML090980084 After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure  
" N" = No copy                                                                                                     OFFICE RI/DRP   RI/DRP   NAME SBarber/SB RBellamy/RRR DATE 04/08 /09 04/ 08 /09 OFFICIAL RECORD COPY  
 
3  Distribution: (Via E-Mail): Executive Director for Operations, OEDO                                                                            (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OEDO                                                    (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR                                                            (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR                                                (RIDSNRROD)  Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO        (RIDSNRRADRO) Director, Division of Inspection and Regional Supprt, NRR/DIRS                                          (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL                                            (RIDSNRRDORL)  Project Directorate I-1 (PD1-2), NRR                                                                                    (RIDSNRRDORILpl 1-2) Asst. General Counsel Materials Litigation and Enforcement, OGC                                      (RIDSOGCMAILCENTER)
 
S. Collins, RA  M. Dapas, DRA  D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP C. Newport, DRP S. Shaffer, SRI B. Haagensen, RI J. Krafty, RI C. Kowalyshyn, OA S. Campbell, RI OEDO M. Kowal, NRR R. Nelson, NRR C. Sanders, NRR, PM D. Roberts, DRS


P. Wilson, DRS D. Screnci, PAO N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO R. Barkley, ORA G. Matakas, ORA K. Heater, DRP C. O'Daniell, ORA K. Gallagher, DRS T. Haverkamp, DNMS L. Larche, DRM PMNS Region I Receptionist ROPreports@nrc.gov   Region I Docket Room (w/concurrences)}}
3 Distribution: (Via E-Mail):
Executive Director for Operations, OEDO                                              (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO                                (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR                                  (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR                            (RIDSNRROD)
Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO    (RIDSNRRADRO)
Director, Division of Inspection and Regional Supprt, NRR/DIRS                        (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL                          (RIDSNRRDORL)
Project Directorate I-1 (PD1-2), NRR                                                  (RIDSNRRDORILpl 1-2)
Asst. General Counsel Materials Litigation and Enforcement, OGC                      (RIDSOGCMAILCENTER)
S. Collins, RA                                                P. Wilson, DRS M. Dapas, DRA                                                  D. Screnci, PAO D. Lew, DRP                                                    N. Sheehan, PAO J. Clifford, DRP                                              N. McNamara, SLO R. Bellamy, DRP                                                D. Tifft, SLO S. Barber, DRP                                                R. Barkley, ORA C. Newport, DRP                                                G. Matakas, ORA S. Shaffer, SRI                                                K. Heater, DRP B. Haagensen, RI                                              C. ODaniell, ORA J. Krafty, RI                                                  K. Gallagher, DRS C. Kowalyshyn, OA                                              T. Haverkamp, DNMS S. Campbell, RI OEDO                                          L. Larche, DRM M. Kowal, NRR                                                  PMNS R. Nelson, NRR                                                Region I Receptionist C. Sanders, NRR, PM                                            ROPreports@nrc.gov D. Roberts, DRS                                                Region I Docket Room (w/concurrences)}}

Revision as of 07:18, 14 November 2019

04/23/2009 Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. Regarding the Safety Performance of the Millstone Power Station for Calendar Year 2008
ML090980084
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/08/2009
From: Ronald Bellamy
NRC/RGN-I/DRP/PB6
To:
BELLAMY RR
References
FOIA/PA-2011-0115
Download: ML090980084 (5)


Text

MN No.09-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING April 8, 2009 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 23, 2009 at 3:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Purpose: To discuss NRCs assessment of the safety performance of the Millstone Power Station for calendar year 2008 and the role of the NRC in ensuring safe plant operations.

NRC Attendees: R. Bellamy, Chief, Projects Branch 6, Region I S. Shaffer, Senior Resident Inspector J. Krafty, Resident Inspector B. Haagensen, Resident Inspector C. Sanders, Project Manager, Nuclear Reactor Regulation Licensee Attendees: A. J. Jordan, Site Vice President L. Morris, Plant Manager R. Griffin, Director, Nuclear Station Safety and Licensing R. MacManus, Director, Nuclear Engineering R. Barron, Manager of Nuclear Oversight Department Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Meeting Contact: Dr. Ronald Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamy@nrc.gov.

2 The NRCs Annual Assessment letter for the Millstone Power Station can be located in ADAMS with Accession Number ML090630229. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090980084. The NRC slides for the meeting can be located in ADAMS with Accession Number ML090980064. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of the Millstone Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by April 17, 2009, via telephone to the NRC meeting contact.

Approved by: __/RA/__ _______________

Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects cc w/ encl:

J. Price, Vice President, Engineering, Dominion Fleet A. Jordan, Site Vice President, Millstone Station C. Funderburk, Director, Nuclear Licensing and Operations Support L. Morris, Plant Manager, Millstone Station W. Barton, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Chair, NEAC P. Rathbun, Vice-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, Citizens Awareness Network (CAN)

P. Eddy, Electric Division, Department of Public Service, State of New York F. Murray, President and CEO, New York State Energy Research and Development Authority A. Peterson, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.

3 Agenda NRCs Annual Assessment Meeting Millstone Power Station April 23, 2009 3:00 - 5:00 pm Introduction ............................................................................................. NRC (5 minutes)

Review of Reactor Oversight Process .................................................... NRC (10 minutes)

Discussion of Millstone Power Station Performance ............................... NRC (10 minutes)

Dominions Response and Remarks ............................................... Dominion (25 minutes)

Closing Remarks ...................................................................................... NRC (5 minutes)

Short Break ...................................................................................................... (5 minutes)

NRC to address public questions ....................... NRC/Members of the Public (as needed)

2 The NRCs Annual Assessment letter for the Millstone Power Station can be located in ADAMS with Accession Number ML090630229. This meeting notice with the enclosed agenda can be located in ADAMS with Accession Number ML090980084. The NRC slides for the meeting can be located in ADAMS with Accession Number ML090980064. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of the Millstone Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC=s Policy Statement, AEnhancing Public Participation in NRC Meetings,@ effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by April 17, 2009, via telephone to the NRC meeting contact.

Approved by: ____/RA/ _______________

Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution:

See next page SUNSI Review Complete: RRR (Reviewers Initials)

DOCUMENT: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\MILLSTONE\MS AA MEETING NOTICE ROP 9.DOC ML090980084 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME SBarber/SB RBellamy/RRR DATE 04/08 /09 04/ 08 /09 OFFICIAL RECORD COPY

3 Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1-2), NRR (RIDSNRRDORILpl 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA P. Wilson, DRS M. Dapas, DRA D. Screnci, PAO D. Lew, DRP N. Sheehan, PAO J. Clifford, DRP N. McNamara, SLO R. Bellamy, DRP D. Tifft, SLO S. Barber, DRP R. Barkley, ORA C. Newport, DRP G. Matakas, ORA S. Shaffer, SRI K. Heater, DRP B. Haagensen, RI C. ODaniell, ORA J. Krafty, RI K. Gallagher, DRS C. Kowalyshyn, OA T. Haverkamp, DNMS S. Campbell, RI OEDO L. Larche, DRM M. Kowal, NRR PMNS R. Nelson, NRR Region I Receptionist C. Sanders, NRR, PM ROPreports@nrc.gov D. Roberts, DRS Region I Docket Room (w/concurrences)