{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125           September 1, 2009  
{{#Wiki_filter:UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 September 1, 2009 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
 
Rick A. Muench, President and
 
Chief Executive Officer  
 
Wolf Creek Nuclear Operating Corporation  
 
P.O. Box 411  
 
Burlington, KS 66839  


==SUBJECT:==
==SUBJECT:==
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - WOLF CREEK GENERATING STATION  
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - WOLF CREEK GENERATING STATION


==Dear Mr. Muench:==
==Dear Mr. Muench:==


On August 4, 2009, the NRC staff completed its performance review of the Wolf Creek Generating Staion. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this  
On August 4, 2009, the NRC staff completed its performance review of the Wolf Creek Generating Staion. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only -- Security Information" will include the security cornerstone review and resultant inspection plan.
period and our plans for future inspections at your facility.  
Plant performance for the most recent quarter at the Wolf Creek Generating Station was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).
 
Our midcycle assessment letter dated September 2, 2008, identified a substantive crosscutting issue in the area of human performance associated with instances of failure to have complete, accurate, and up-to-date documentation, procedures, and/or work packages within the resources component [H.2(c)]. The basis for identifying the substantive crosscutting issue was five findings, which composed a theme in this area. Our end-of-cycle assessment letter dated March 4, 2009, sustained this substantive crosscutting issue. During that assessment period, the number of findings increased to six findings related to the theme. During a public meeting with the NRC on October 21, 2008, you informed us that you had completed a root cause analysis of your human performance issues and provided details on your Human Performance Initiative Plan and your Maintenance Work Package Quality Initiative Plan, which you were using to address human performance issues. Additionally, during a public meeting with the NRC on July 1, 2009, you further informed us of additional initiatives taken as corrective actions in accordance with your improvement plan. We have observed a decrease in the number of human performance related findings which relate to having complete, accurate, and up-to-date documentation, procedures, and/or work packages [H.2(c)]. During this assessment period, only two findings were identified with this common theme, none coming in the last half of the assessment period. As a result of your implemented corrective actions and in light of fewer human performance related findings with this common theme, this substantive crosscutting issue is closed.
This performance review and enclosed inspection plan do not include security information. A  
 
separate letter designated and marked as "Official Use Only -- Security Information" will include  
 
the security cornerstone review and resultant inspection plan.  
 
Plant performance for the most recent quarter at the Wolf Creek Generating Station was within  
 
the Licensee Response column of the NRC
=s Action Matrix, based on all inspection findings being classified as having very low safety signi ficance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).  
 
Our midcycle assessment letter dated September 2, 2008, identified a substantive crosscutting  
 
issue in the area of human performance associated with instances of failure to have complete, accurate, and up-to-date documentation, procedures, and/or work packages within the  
 
resources component [H.2(c)]. The basis for identifying the substantive crosscutting issue was  
 
five findings, which composed a theme in this area. Our end-of-cycle assessment letter dated  
 
March 4, 2009, sustained this substantive crosscutting issue. During that assessment period, the number of findings increased to six findings related to the theme. During a public meeting with the NRC on October 21, 2008, you informed us that you had completed a root cause analysis of your human performance issues and provided details on your Human Performance Initiative Plan and your Maintenance Work Package Quality Initiative Plan, which you were  
 
using to address human performance issues. Additionally, during a public meeting with the  
 
NRC on July 1, 2009, you further informed us of additional initiatives taken as corrective actions  
 
in accordance with your improvement plan.
We have observed a decrease in the number of human performance related findings which relate to having complete, accurate, and up-to-date  
 
documentation, procedures, and/or work packages [H.2(c)]. During this assessment period, only two findings were identified with this common theme, none coming in the last half of the  
 
assessment period. As a result of your impl emented corrective actions and in light of fewer human performance related findings with this common theme, this substantive crosscutting
 
issue is closed.
 
Wolf Creek Nuclear Operating Corp. At the 2008 midcycle and end-of-cycle assessments, a theme for an inadequate threshold for
 
identifying problems [P.1 (a)] was identified as part of a substantive crosscutting issue in
 
problem identification and resolution. In our 2008 assessment letters, we stated that this theme
 
would remain open until we determined that your corrective actions had been effective. During
 
public meetings with the NRC on October 21, 2008, and July 1, 2009, you informed us that you
 
had taken corrective action to improve your th reshold for reporting issues. These corrective actions have resulted in an increase in the number of condition reports and work requests your
 
staff has generated. We also noted this specific improvement by observing there was only one
 
finding in the most recent end-of-cycle assessment and two findings in the current assessment
 
related to the theme of failure to have an adequate threshold for identifying problems. Finally, we also have observed a declining trend in the number of NRC identified issues, from over 30 NRC identified findings in each of the previous two assessment periods to 18 in the current assessment period. Your corrective actions hav e shown an improving trend; therefore, this substantive crosscutting theme associated with a low enough threshold for identifying problems
[P.1 (a)] is closed.
 
At the 2008 midcycle and end-of-cycle assessments, a theme associated with the thoroughness
 
of problem evaluation [P.1(c)] was also identified as part of a substantive crosscutting issue in
 
problem identification and resolution based on seven and eight related findings, respectively. In
 
both the 2008 midcycle and end-of-cycle assessment letters, we stated that this new
 
substantive crosscutting issue would remain open until we determined that your corrective
 
actions had been effective. During public meetings with the NRC on October 21, 2008, and July
 
1, 2009, you informed us that you had completed a root cause analysis for noted deficiencies
 
related to problem identification and resolution.
You also informed us that you had implemented significant changes in improving the quality of problem evaluation, including root cause evaluator training, conducting a management alignment seminar, and increasing management
 
oversight of problem evaluation. We have noted through recent inspection efforts, including a
 
focused baseline inspection of the residual heat removal system, that you have shown some
 
improvement in this area; however, we did not observe sustained improvement over the entire assessment period. We continue to identify findings associated with this theme including four
 
Green findings associated with this theme identified during this assessment period. Therefore, the substantive crosscutting theme associated with the thoroughness of problem evaluation
[P.1(c)] will remain open pending further demonstrat ion of the effectiveness of your corrective actions.
Finally, at the 2008 midcycle and end-of-cycle assessments, a theme associated with the
 
appropriateness of corrective actions [P.1 (d)] was also identified as part of a substantive
 
crosscutting issue in problem identification and resolution based on seven and eight related
 
findings, respectively. In both the 2008 midcycle and end-of-cycle assessment letter, we stated
 
that this new substantive crosscutting issue would remain open until we determined that your
 
corrective actions had been effective. During public meetings with the NRC on October 21, 2008 and July 1, 2009, you informed us that you had completed a root cause analysis for noted
 
deficiencies related to problem identification and resolution and implemented corrective actions.
 
These actions appear to have been effective, since there were only two findings related to the
 
theme of failing to employ effective corrective actions, with none coming in the last three
 
quarters of the assessment period. Therefore, the substantive crosscutting theme associated
 
with the appropriateness of corrective actions [P.1 (d)] is closed.  
 
The substantive crosscutting issue in problem identification and resolution will remain open, based solely on a theme associated with the thoroughness of problem evaluation [P.1(c)]. This Wolf Creek Nuclear Operating Corp. substantive crosscutting issue will remain open until we determine, through our inspections, that
 
corrective actions implemented in accordance wi th your improvement plan have resulted in improved performance in this area. Of note, th is is the third consecutive assessment with a substantive crosscutting area in problem identification and resolution with this common theme. 
 
NRC Manual Chapter 0305, "Operating Reactor Assessm ent Program," states, that "In the third consecutive assessment letter identifying the same substantive crosscutting issue with the
 
same crosscutting aspect, the regional office would typically request that the licensee perform
 
an assessment of safety culture. The regional office could conclude a safety culture
 
assessment is not warranted if the licensee has made reasonable progress in addressing the
 
issue but has not yet met the specific closure criteria for the issue."  We note that, although you
 
have not met our criteria for closing this crosscutting theme, you have made reasonable progress in addressing this issue. As such, we have concluded that a safety culture assessment is not warranted at this time. However, we do request that you schedule a public meeting to discuss your continued progress in addressing this area before our next end-of-cycle
 
assessment. We are also evaluating potential changes to the inspection program in the
 
radiation safety cornerstone. Consequently, some specific inspection procedures and the
 
inspection schedule may be revised for 2010.
 
The enclosed inspection plan details the inspections, less those related to physical protection
 
scheduled through December 31, 2010. The inspection plan is provided to allow for the
 
resolution of any scheduling conflicts and personnel availability issues well in advance of
 
inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and
 
continuous nature. The inspections in the last nine months of the inspection plan are tentative
 
and may be revised at the end-of-cycle review. 
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Avail able Records (PARS) component of NRC's document


system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Wolf Creek Nuclear Operating Corp.          At the 2008 midcycle and end-of-cycle assessments, a theme for an inadequate threshold for identifying problems [P.1 (a)] was identified as part of a substantive crosscutting issue in problem identification and resolution. In our 2008 assessment letters, we stated that this theme would remain open until we determined that your corrective actions had been effective. During public meetings with the NRC on October 21, 2008, and July 1, 2009, you informed us that you had taken corrective action to improve your threshold for reporting issues. These corrective actions have resulted in an increase in the number of condition reports and work requests your staff has generated. We also noted this specific improvement by observing there was only one finding in the most recent end-of-cycle assessment and two findings in the current assessment related to the theme of failure to have an adequate threshold for identifying problems. Finally, we also have observed a declining trend in the number of NRC identified issues, from over 30 NRC identified findings in each of the previous two assessment periods to 18 in the current assessment period. Your corrective actions have shown an improving trend; therefore, this substantive crosscutting theme associated with a low enough threshold for identifying problems
[P.1 (a)] is closed.
At the 2008 midcycle and end-of-cycle assessments, a theme associated with the thoroughness of problem evaluation [P.1(c)] was also identified as part of a substantive crosscutting issue in problem identification and resolution based on seven and eight related findings, respectively. In both the 2008 midcycle and end-of-cycle assessment letters, we stated that this new substantive crosscutting issue would remain open until we determined that your corrective actions had been effective. During public meetings with the NRC on October 21, 2008, and July 1, 2009, you informed us that you had completed a root cause analysis for noted deficiencies related to problem identification and resolution. You also informed us that you had implemented significant changes in improving the quality of problem evaluation, including root cause evaluator training, conducting a management alignment seminar, and increasing management oversight of problem evaluation. We have noted through recent inspection efforts, including a focused baseline inspection of the residual heat removal system, that you have shown some improvement in this area; however, we did not observe sustained improvement over the entire assessment period. We continue to identify findings associated with this theme including four Green findings associated with this theme identified during this assessment period. Therefore, the substantive crosscutting theme associated with the thoroughness of problem evaluation
[P.1(c)] will remain open pending further demonstration of the effectiveness of your corrective actions.
Finally, at the 2008 midcycle and end-of-cycle assessments, a theme associated with the appropriateness of corrective actions [P.1 (d)] was also identified as part of a substantive crosscutting issue in problem identification and resolution based on seven and eight related findings, respectively. In both the 2008 midcycle and end-of-cycle assessment letter, we stated that this new substantive crosscutting issue would remain open until we determined that your corrective actions had been effective. During public meetings with the NRC on October 21, 2008 and July 1, 2009, you informed us that you had completed a root cause analysis for noted deficiencies related to problem identification and resolution and implemented corrective actions.
These actions appear to have been effective, since there were only two findings related to the theme of failing to employ effective corrective actions, with none coming in the last three quarters of the assessment period. Therefore, the substantive crosscutting theme associated with the appropriateness of corrective actions [P.1 (d)] is closed.
The substantive crosscutting issue in problem identification and resolution will remain open, based solely on a theme associated with the thoroughness of problem evaluation [P.1(c)]. This


If circumstances arise which cause us to change the inspection plan, we will contact you to  
Wolf Creek Nuclear Operating Corp.          substantive crosscutting issue will remain open until we determine, through our inspections, that corrective actions implemented in accordance with your improvement plan have resulted in improved performance in this area. Of note, this is the third consecutive assessment with a substantive crosscutting area in problem identification and resolution with this common theme.
NRC Manual Chapter 0305, Operating Reactor Assessment Program, states, that In the third consecutive assessment letter identifying the same substantive crosscutting issue with the same crosscutting aspect, the regional office would typically request that the licensee perform an assessment of safety culture. The regional office could conclude a safety culture assessment is not warranted if the licensee has made reasonable progress in addressing the issue but has not yet met the specific closure criteria for the issue. We note that, although you have not met our criteria for closing this crosscutting theme, you have made reasonable progress in addressing this issue. As such, we have concluded that a safety culture assessment is not warranted at this time. However, we do request that you schedule a public meeting to discuss your continued progress in addressing this area before our next end-of-cycle assessment. We are also evaluating potential changes to the inspection program in the radiation safety cornerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                              /RA/
Dwight D. Chamberlain, Director Division of Reactor Projects Docket: 50-482 License: NPF-42


discuss the change as soon as possible. Please contact me at 817-860-8141 with any
Wolf Creek Nuclear Operating Corp.    
 
questions you may have regarding this letter or the inspection plan.
 
Sincerely,          /RA/  Dwight D. Chamberlain, Director Division of Reactor Projects Docket:  50-482
 
License:  NPF-42
 
Wolf Creek Nuclear Operating Corp.  


==Enclosure:==
==Enclosure:==


Wolf Creek Inspection Activity Plan  
Wolf Creek Inspection Activity Plan cc w/
 
cc w/


==Enclosure:==
==Enclosure:==


Vice President Operations/Plant Manager  
Vice President Operations/Plant Manager     Attorney General Wolf Creek Nuclear Operating Corporation   120 S.W. 10th Avenue, 2nd Floor P.O. Box 411                               Topeka, KS 66612-1597 Burlington, KS 66839 County Clerk Jay Silberg, Esq.                           Coffey County Courthouse Pillsbury Winthrop Shaw Pittman LLP         110 South 6th Street 2300 N Street, NW                           Burlington, KS 66839 Washington, DC 20037 Chief, Radiation and Asbestos Supervisor Licensing                         Control Section Wolf Creek Nuclear Operating Corporation   Bureau of Air and Radiation P.O. Box 411                               Kansas Department of Health and Burlington, KS 66839                         Environment 1000 SW Jackson, Suite 310 Chief Engineer                              Topeka, KS 66612-1366 Utilities Division Kansas Corporation Commission              Chief, Technological Hazards 1500 SW Arrowhead Road                        Branch Topeka, KS 66604-4027                      FEMA, Region VII 9221 Ward Parkway Office of the Governor                      Suite 300 State of Kansas                            Kansas City, MO 64114-3372 Topeka, KS 66612-1590
 
Wolf Creek Nuclear Operating Corporation  
 
P.O. Box 411  
 
Burlington, KS 66839  
 
Jay Silberg, Esq.  
 
Pillsbury Winthrop Shaw Pittman LLP  
 
2300 N Street, NW Washington, DC 20037  
 
Supervisor Licensing  
 
Wolf Creek Nuclear Operating Corporation  
 
P.O. Box 411  
 
Burlington, KS  66839
 
Chief Engineer
 
Utilities Division
 
Kansas Corporation Commission
 
1500 SW Arrowhead Road
 
Topeka, KS  66604-4027
 
Office of the Governor
 
State of Kansas
 
Topeka, KS  66612-1590 Attorney General
 
120 S.W. 10th Avenue, 2nd Floor
 
Topeka, KS  66612-1597
 
County Clerk Coffey County Courthouse 110 South 6th Street
 
Burlington, KS 66839  
 
Chief, Radiation and Asbestos
 
Control Section
 
Bureau of Air and Radiation
 
Kansas Department of Health and
 
Environment  
 
1000 SW Jackson, Suite 310  
 
Topeka, KS 66612-1366  
 
Chief, Technological Hazards  
 
Branch  
 
FEMA, Region VII  
 
9221 Ward Parkway  
 
Suite 300  
 
Kansas City, MO 64114-3372
 
Wolf Creek Nuclear Operating Corp. 5 Electronic distribution by RIV:
 
Regional Administrator (Elmo.Collins@nrc.gov)
 
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
 
DRP Director (Dwight.Chamberlain@nrc.gov)
 
DRP Deputy Director (Anton.Vegel@nrc.goV)
 
DRP Director (Roy.Caniano@nrc.gov)
 
DRP Deputy Director (Troy.Pruett@nrc.gov)
 
Branch Chief, DRP (Vincent.Gaddy@nrc.gov)
 
Senior Project Engineer, DRP (Rick.Deese@nrc.gov)
 
Senior Resident Inspector (Chris.Long@nrc.gov)
 
Resident Inspector (Charles.Peabody@nrc.gov)


Wolf Creek Nuclear Operating Corp.          5 Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.goV)
DRP Director (Roy.Caniano@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Branch Chief, DRP (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP (Rick.Deese@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lucy.Owen@nrc.gov)
DRA Secretary (Judy.Kilcrease@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov)
OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov)
OEDO, TRPS (Tamara.Bloomer@nrc.gov)
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)
Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)
NRR Project Manager (Balwant.Singal@nrc.gov)
RidsNrrDirslpab (Resource@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROP Reports File located: R:\EOC and Midcycle\Midcycle Assessment Letters\2009\WC.doc SUNSI Rev Compl.          Yes No ADAMS              Yes No      Reviewer Initials    VGG Publicly Avail            Yes No Sensitive          Yes No      Sens. Type Initials  VGG RIV:SPE/DRP/PBB C:DRP/PBB                D:DRS          D:DRP RWDeese                VGGaddy          RJCaniano      DDChamberlain
/RA/                    /RA/              /RA/            /RA/
8/18/09                8/19/09            8/20/09        8/24/09 OFFICIAL RECORD COPY                                T=Telephone      E=E-mail      F=Fax


Regional State Liaison Officer (Bill.Maier@nrc.gov)
Wolf Creek Nuclear Operating Corp. 6 Page 1 of 2                                                                              Wolf Creek 08/17/2009    14:27:55                                                          Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit          Planned Dates                                                                                                No. of Staff Number        Start      End      Inspection Activity                                                          Title        on Site EXAM          - INITIAL EXAM                                                                      3 1          08/31/2009  09/04/2009      X02419              INITIAL EXAM-WC (8/2009)
EB1-08        - INSERVICE INSPECTION                                                              3 1          10/10/2009  10/30/2009  IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds 1          10/10/2009  10/30/2009  IP 7111108P            Inservice Inspection Activities - PWR RP-ORS3      - OCCUPATIONAL RADIATION SAFETY - ALARA                                              1 1          10/19/2009  10/23/2009  IP 7112101              Access Control to Radiologically Significant Areas 1          10/19/2009  10/23/2009  IP 7112102              ALARA Planning and Controls 1          10/19/2009  10/23/2009  IP 71151                Performance Indicator Verification RP-ORS4      - OCCUPATIONAL RADIATION SAFETY - ACCESS                                            1 1          10/19/2009  10/23/2009  IP 7112101              Access Control to Radiologically Significant Areas 1          10/19/2009  10/23/2009  IP 7112102              ALARA Planning and Controls 1          10/19/2009  10/23/2009  IP 71151                Performance Indicator Verification RP-ORS1      - OCCUPATIONAL RADIATION SAFETY - ALARA                                              1 1          03/15/2010  03/19/2010  IP 7112101              Access Control to Radiologically Significant Areas 1          03/15/2010  03/19/2010  IP 7112102              ALARA Planning and Controls 1          03/15/2010  03/19/2010  IP 71151-OR01          Occupational Exposure Control Effectiveness 1          03/15/2010  03/19/2010  IP 71151-PR01          RETS/ODCM Radiological Effluent EP-1          - BIENNIAL EP PROGRAM INSPECTION                                                    1 1          04/12/2010  04/16/2010  IP 7111402              Alert and Notification System Testing 1          04/12/2010  04/16/2010  IP 7111403              Emergency Response Organization Augmentation Testing 1          04/12/2010  04/16/2010  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          04/12/2010  04/16/2010  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          04/12/2010  04/16/2010  IP 71151-EP01          Drill/Exercise Performance 1          04/12/2010  04/16/2010  IP 71151-EP02          ERO Drill Participation 1          04/12/2010  04/16/2010  IP 71151-EP03          Alert & Notification System RP-ORS1      - OCCUPATIONAL RADIATION SAFETY-ACRSA                                                1 1          05/10/2010  05/14/2010  IP 7112101              Access Control to Radiologically Significant Areas 1          05/10/2010  05/14/2010  IP 7112102              ALARA Planning and Controls 1          05/10/2010  05/14/2010  IP 71151                Performance Indicator Verification PSB2-52B      - BIENNIAL PI&R                                                                      4 1          07/12/2010  07/16/2010  IP 71152B              Identification and Resolution of Problems 1          07/26/2010  07/30/2010  IP 71152B              Identification and Resolution of Problems EB1-21        - COMPONENT DESIGN BASIS INSPECTION                                                  6 1          09/07/2010  09/10/2010  IP 7111121              Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.


RA Secretary (Lucy.Owen@nrc.gov)
Page 2 of 2                                                                             Wolf Creek 08/17/2009     14:27:55                                                         Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                                             No. of Staff Number         Start     End     Inspection Activity                                                             Title                                   on Site EB1-21       - COMPONENT DESIGN BASIS INSPECTION                                                                               6 1         09/20/2010   10/01/2010   IP 7111121              Component Design Bases Inspection BRQ           - OPERATOR REQUAL INSP                                                                                           2 1         10/04/2010   10/08/2010   IP 7111111B            Licensed Operator Requalification Program RP TEAM       - RADIATION SAFETY TEAM INSPECTION                                                                               4 1         10/18/2010  10/22/2010  IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 1          10/18/2010   10/22/2010   IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1          10/18/2010   10/22/2010   IP 7112202              Radioactive Material Processing and Transportation 1          10/18/2010   10/22/2010   IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1          10/18/2010   10/22/2010   IP 7113011              Material Control and Accounting (MC&A)
 
EB2-07T       - TRIENNIAL HEAT SINK PERFORMANCE                                                                                 1 1         10/25/2010   10/29/2010   IP 7111107T            Heat Sink Performance EXAM         - INITIAL EXAM                                                                                                   4 1         11/08/2010   11/12/2010     X02451              INITIAL EXAM -WC (11/2010) 1          12/06/2010   12/17/2010     X02451              INITIAL EXAM -WC (11/2010)
DRA Secretary (Judy.Kilcrease@nrc.gov)
This report does not include INPO and OUTAGE activities.
 
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
 
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)
 
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)
 
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
 
Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov)
 
OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov)
 
OEDO, TRPS (Tamara.Bloomer@nrc.gov)
 
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)
 
Director, DORL, NRR (Joseph Giitter@nrc.gov)
 
Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)
 
Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)
 
NRR Project Manager (Balwant.Singal@nrc.gov)
 
RidsNrrDirslpab (Resource@nrc.gov)
 
Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROP Reports
 
File located:  R:\EOC and Midcycle\Midcycle Assessment Letters\2009\WC.doc SUNSI Rev Compl. Yes  No ADAMS  Yes  No Reviewer Initials VGG Publicly Avail  Yes  No Sensitive  Yes  No Sens. Type Initials VGG RIV:SPE/DRP/PBB C:DRP/PBB D:DRS D:DRP  RWDeese VGGaddy RJCaniano DDChamberlain
/RA/ /RA/ /RA/ /RA/  8/18/09 8/19/09 8/20/09 8/24/09  OFFICIAL RECORD COPY    T=Telephone          E=E-mail        F=Fax Wolf Creek Nuclear Operating Corp. 6
 
Inspection / Activity Plan Page 1 of 2 08/17/2009 14:27:55 Report 22 09/01/2009
-12/31/2010 Unit Number Planned Dates Start          End Inspection Activity Title No. of Staff on Site Wolf Creek EXAM-INITIAL EXAM 3 1    INITIAL EXAM-WC (8/2009)
X02419 08/31/2009 09/04/2009 EB1-08-INSERVICE INSPECTION 3 1    IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/10/2009 10/30/2009 1    IP Inservice Inspection Activities - PWR 7111108P 10/10/2009 10/30/2009 RP-ORS3-OCCUPATIONAL RADIATION SAFETY - ALARA 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 10/19/2009 10/23/2009 1    IP A LARA Planning and Controls 7112102 10/19/2009 10/23/2009 1    IP Performance Indicator Verification 71151 10/19/2009 10/23/2009 RP-ORS4-OCCUPATIONAL RADIATION SAFETY - ACCESS 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 10/19/2009 10/23/2009 1    IP A LARA Planning and Controls 7112102 10/19/2009 10/23/2009 1    IP Performance Indicator Verification 71151 10/19/2009 10/23/2009 RP-ORS1-OCCUPATIONAL RADIATION SAFETY - ALARA 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 03/15/2010 03/19/2010 1    IP A LARA Planning and Controls 7112102 03/15/2010 03/19/2010 1    IP Occupational Exposure Control Effectiveness 71151-OR01 03/15/2010 03/19/2010 1    IP RETS/ODCM Radiological Effluent 71151-PR01 03/15/2010 03/19/2010 EP-1-BIENNIAL EP PROGRAM INSPECTION 1 1    IP A lert and Notification System Testing 7111402 04/12/2010 04/16/2010 1    IP Emergency Response Organization Augmentation Testing 7111403 04/12/2010 04/16/2010 1    IP Emergency Action Level and Emergency Plan Changes 7111404 04/12/2010 04/16/2010 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/12/2010 04/16/2010 1    IP Drill/Exercise Performance 71151-EP01 04/12/2010 04/16/2010 1    IP ERO Drill Participation 71151-EP02 04/12/2010 04/16/2010 1    IP A lert & Notification System 71151-EP03 04/12/2010 04/16/2010 RP-ORS1-OCCUPATIONAL RADIATION SAFETY-ACRSA 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 1    IP A LARA Planning and Controls 7112102 05/10/2010 05/14/2010 1    IP Performance Indicator Verification 71151 05/10/2010 05/14/2010 PSB2-52B-BIENNIAL PI&R 4 1    IP Identification and Resolution of Problems 71152B 07/12/2010 07/16/2010 1    IP Identification and Resolution of Problems 71152B 07/26/2010 07/30/2010 EB1-21-COMPONENT DESIGN BASIS INSPECTION 6 1    IP Component Design Bases Inspection 7111121 09/07/2010 09/10/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 08/17/2009 14:27:55 Report 22 09/01/2009
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Wolf Creek EB1-21-COMPONENT DESIGN BASIS INSPECTION 6 1     IP Component Design Bases Inspection 7111121 09/20/2010 10/01/2010 BRQ-OPERATOR REQUAL INSP 2 1     IP Licensed Operator Requalification Program 7111111B 10/04/2010 10/08/2010 RP TEAM-RADIATION SAFETY TEAM INSPECTION 4 1     IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 10/18/2010 10/22/2010 1    IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 10/18/2010 10/22/2010 1    IP Radioactive Material Processing and Transportation 7112202 10/18/2010 10/22/2010 1    IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 10/18/2010 10/22/2010 1    IP Material Control and Accounting (MC&A) 7113011 10/18/2010 10/22/2010 EB2-07T-TRIENNIAL HEAT SINK PERFORMANCE 1 1     IP Heat Sink Performance 7111107T 10/25/2010 10/29/2010 EXAM-INITIAL EXAM 4 1     INITIAL EXAM -WC (11/2010)
X02451 11/08/2010 11/12/2010 1    INITIAL EXAM -WC (11/2010)
X02451 12/06/2010 12/17/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Revision as of 02:52, 14 November 2019

09/01/2009 Wolf Creek 2009 Midcycle Assessment
ML092400145
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/01/2009
From: Chamberlain D
NRC/RGN-IV/DRP
To: Muench R
Wolf Creek
References
Download: ML092400145 (7)


Text

UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 September 1, 2009 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - WOLF CREEK GENERATING STATION

Dear Mr. Muench:

On August 4, 2009, the NRC staff completed its performance review of the Wolf Creek Generating Staion. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008 through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only -- Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at the Wolf Creek Generating Station was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).

Our midcycle assessment letter dated September 2, 2008, identified a substantive crosscutting issue in the area of human performance associated with instances of failure to have complete, accurate, and up-to-date documentation, procedures, and/or work packages within the resources component H.2(c). The basis for identifying the substantive crosscutting issue was five findings, which composed a theme in this area. Our end-of-cycle assessment letter dated March 4, 2009, sustained this substantive crosscutting issue. During that assessment period, the number of findings increased to six findings related to the theme. During a public meeting with the NRC on October 21, 2008, you informed us that you had completed a root cause analysis of your human performance issues and provided details on your Human Performance Initiative Plan and your Maintenance Work Package Quality Initiative Plan, which you were using to address human performance issues. Additionally, during a public meeting with the NRC on July 1, 2009, you further informed us of additional initiatives taken as corrective actions in accordance with your improvement plan. We have observed a decrease in the number of human performance related findings which relate to having complete, accurate, and up-to-date documentation, procedures, and/or work packages H.2(c). During this assessment period, only two findings were identified with this common theme, none coming in the last half of the assessment period. As a result of your implemented corrective actions and in light of fewer human performance related findings with this common theme, this substantive crosscutting issue is closed.

Wolf Creek Nuclear Operating Corp. At the 2008 midcycle and end-of-cycle assessments, a theme for an inadequate threshold for identifying problems [P.1 (a)] was identified as part of a substantive crosscutting issue in problem identification and resolution. In our 2008 assessment letters, we stated that this theme would remain open until we determined that your corrective actions had been effective. During public meetings with the NRC on October 21, 2008, and July 1, 2009, you informed us that you had taken corrective action to improve your threshold for reporting issues. These corrective actions have resulted in an increase in the number of condition reports and work requests your staff has generated. We also noted this specific improvement by observing there was only one finding in the most recent end-of-cycle assessment and two findings in the current assessment related to the theme of failure to have an adequate threshold for identifying problems. Finally, we also have observed a declining trend in the number of NRC identified issues, from over 30 NRC identified findings in each of the previous two assessment periods to 18 in the current assessment period. Your corrective actions have shown an improving trend; therefore, this substantive crosscutting theme associated with a low enough threshold for identifying problems

[P.1 (a)] is closed.

At the 2008 midcycle and end-of-cycle assessments, a theme associated with the thoroughness of problem evaluation P.1(c) was also identified as part of a substantive crosscutting issue in problem identification and resolution based on seven and eight related findings, respectively. In both the 2008 midcycle and end-of-cycle assessment letters, we stated that this new substantive crosscutting issue would remain open until we determined that your corrective actions had been effective. During public meetings with the NRC on October 21, 2008, and July 1, 2009, you informed us that you had completed a root cause analysis for noted deficiencies related to problem identification and resolution. You also informed us that you had implemented significant changes in improving the quality of problem evaluation, including root cause evaluator training, conducting a management alignment seminar, and increasing management oversight of problem evaluation. We have noted through recent inspection efforts, including a focused baseline inspection of the residual heat removal system, that you have shown some improvement in this area; however, we did not observe sustained improvement over the entire assessment period. We continue to identify findings associated with this theme including four Green findings associated with this theme identified during this assessment period. Therefore, the substantive crosscutting theme associated with the thoroughness of problem evaluation

P.1(c) will remain open pending further demonstration of the effectiveness of your corrective actions.

Finally, at the 2008 midcycle and end-of-cycle assessments, a theme associated with the appropriateness of corrective actions [P.1 (d)] was also identified as part of a substantive crosscutting issue in problem identification and resolution based on seven and eight related findings, respectively. In both the 2008 midcycle and end-of-cycle assessment letter, we stated that this new substantive crosscutting issue would remain open until we determined that your corrective actions had been effective. During public meetings with the NRC on October 21, 2008 and July 1, 2009, you informed us that you had completed a root cause analysis for noted deficiencies related to problem identification and resolution and implemented corrective actions.

These actions appear to have been effective, since there were only two findings related to the theme of failing to employ effective corrective actions, with none coming in the last three quarters of the assessment period. Therefore, the substantive crosscutting theme associated with the appropriateness of corrective actions [P.1 (d)] is closed.

The substantive crosscutting issue in problem identification and resolution will remain open, based solely on a theme associated with the thoroughness of problem evaluation P.1(c). This

Wolf Creek Nuclear Operating Corp. substantive crosscutting issue will remain open until we determine, through our inspections, that corrective actions implemented in accordance with your improvement plan have resulted in improved performance in this area. Of note, this is the third consecutive assessment with a substantive crosscutting area in problem identification and resolution with this common theme.

NRC Manual Chapter 0305, Operating Reactor Assessment Program, states, that In the third consecutive assessment letter identifying the same substantive crosscutting issue with the same crosscutting aspect, the regional office would typically request that the licensee perform an assessment of safety culture. The regional office could conclude a safety culture assessment is not warranted if the licensee has made reasonable progress in addressing the issue but has not yet met the specific closure criteria for the issue. We note that, although you have not met our criteria for closing this crosscutting theme, you have made reasonable progress in addressing this issue. As such, we have concluded that a safety culture assessment is not warranted at this time. However, we do request that you schedule a public meeting to discuss your continued progress in addressing this area before our next end-of-cycle assessment. We are also evaluating potential changes to the inspection program in the radiation safety cornerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Projects Docket: 50-482 License: NPF-42

Wolf Creek Nuclear Operating Corp.

Enclosure:

Wolf Creek Inspection Activity Plan cc w/

Enclosure:

Vice President Operations/Plant Manager Attorney General Wolf Creek Nuclear Operating Corporation 120 S.W. 10th Avenue, 2nd Floor P.O. Box 411 Topeka, KS 66612-1597 Burlington, KS 66839 County Clerk Jay Silberg, Esq. Coffey County Courthouse Pillsbury Winthrop Shaw Pittman LLP 110 South 6th Street 2300 N Street, NW Burlington, KS 66839 Washington, DC 20037 Chief, Radiation and Asbestos Supervisor Licensing Control Section Wolf Creek Nuclear Operating Corporation Bureau of Air and Radiation P.O. Box 411 Kansas Department of Health and Burlington, KS 66839 Environment 1000 SW Jackson, Suite 310 Chief Engineer Topeka, KS 66612-1366 Utilities Division Kansas Corporation Commission Chief, Technological Hazards 1500 SW Arrowhead Road Branch Topeka, KS 66604-4027 FEMA, Region VII 9221 Ward Parkway Office of the Governor Suite 300 State of Kansas Kansas City, MO 64114-3372 Topeka, KS 66612-1590

Wolf Creek Nuclear Operating Corp. 5 Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRP Director (Roy.Caniano@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Branch Chief, DRP (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP (Rick.Deese@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov)

DRA Secretary (Judy.Kilcrease@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov)

OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov)

OEDO, TRPS (Tamara.Bloomer@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)

Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)

NRR Project Manager (Balwant.Singal@nrc.gov)

RidsNrrDirslpab (Resource@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROP Reports File located: R:\EOC and Midcycle\Midcycle Assessment Letters\2009\WC.doc SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials VGG Publicly Avail Yes No Sensitive Yes No Sens. Type Initials VGG RIV:SPE/DRP/PBB C:DRP/PBB D:DRS D:DRP RWDeese VGGaddy RJCaniano DDChamberlain

/RA/ /RA/ /RA/ /RA/

8/18/09 8/19/09 8/20/09 8/24/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Wolf Creek Nuclear Operating Corp. 6 Page 1 of 2 Wolf Creek 08/17/2009 14:27:55 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL EXAM 3 1 08/31/2009 09/04/2009 X02419 INITIAL EXAM-WC (8/2009)

EB1-08 - INSERVICE INSPECTION 3 1 10/10/2009 10/30/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 1 10/10/2009 10/30/2009 IP 7111108P Inservice Inspection Activities - PWR RP-ORS3 - OCCUPATIONAL RADIATION SAFETY - ALARA 1 1 10/19/2009 10/23/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 10/19/2009 10/23/2009 IP 7112102 ALARA Planning and Controls 1 10/19/2009 10/23/2009 IP 71151 Performance Indicator Verification RP-ORS4 - OCCUPATIONAL RADIATION SAFETY - ACCESS 1 1 10/19/2009 10/23/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 10/19/2009 10/23/2009 IP 7112102 ALARA Planning and Controls 1 10/19/2009 10/23/2009 IP 71151 Performance Indicator Verification RP-ORS1 - OCCUPATIONAL RADIATION SAFETY - ALARA 1 1 03/15/2010 03/19/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 03/15/2010 03/19/2010 IP 7112102 ALARA Planning and Controls 1 03/15/2010 03/19/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 03/15/2010 03/19/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1 04/12/2010 04/16/2010 IP 7111402 Alert and Notification System Testing 1 04/12/2010 04/16/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1 04/12/2010 04/16/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 04/12/2010 04/16/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 04/12/2010 04/16/2010 IP 71151-EP01 Drill/Exercise Performance 1 04/12/2010 04/16/2010 IP 71151-EP02 ERO Drill Participation 1 04/12/2010 04/16/2010 IP 71151-EP03 Alert & Notification System RP-ORS1 - OCCUPATIONAL RADIATION SAFETY-ACRSA 1 1 05/10/2010 05/14/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 05/10/2010 05/14/2010 IP 7112102 ALARA Planning and Controls 1 05/10/2010 05/14/2010 IP 71151 Performance Indicator Verification PSB2-52B - BIENNIAL PI&R 4 1 07/12/2010 07/16/2010 IP 71152B Identification and Resolution of Problems 1 07/26/2010 07/30/2010 IP 71152B Identification and Resolution of Problems EB1-21 - COMPONENT DESIGN BASIS INSPECTION 6 1 09/07/2010 09/10/2010 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Wolf Creek 08/17/2009 14:27:55 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-21 - COMPONENT DESIGN BASIS INSPECTION 6 1 09/20/2010 10/01/2010 IP 7111121 Component Design Bases Inspection BRQ - OPERATOR REQUAL INSP 2 1 10/04/2010 10/08/2010 IP 7111111B Licensed Operator Requalification Program RP TEAM - RADIATION SAFETY TEAM INSPECTION 4 1 10/18/2010 10/22/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1 10/18/2010 10/22/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 10/18/2010 10/22/2010 IP 7112202 Radioactive Material Processing and Transportation 1 10/18/2010 10/22/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1 10/18/2010 10/22/2010 IP 7113011 Material Control and Accounting (MC&A)

EB2-07T - TRIENNIAL HEAT SINK PERFORMANCE 1 1 10/25/2010 10/29/2010 IP 7111107T Heat Sink Performance EXAM - INITIAL EXAM 4 1 11/08/2010 11/12/2010 X02451 INITIAL EXAM -WC (11/2010) 1 12/06/2010 12/17/2010 X02451 INITIAL EXAM -WC (11/2010)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.