{{#Wiki_filter:Accession No. ML092870211  
{{#Wiki_filter:Accession No. ML092870211 From:                     Tam, Peter Sent:                     Wednesday, October 14, 2009 9:47 AM To:                       'Jack Gadzala'; 'Craig D Sly'; 'Thomas Breene (thomas.l.breene@dom.com)'
 
Cc:                       Bailey, Stewart; Lehning, John
From: Tam, Peter Sent: Wednesday, October 14, 2009 9:47 AM To: 'Jack Gadzala'; 'Craig D Sly'; 'Thomas Breene (thomas.l.breene@dom.com)' Cc: Bailey, Stewart; Lehning, John  


==Subject:==
==Subject:==
Kewaunee - Revised Questions 4, 6, 7, and 12 of the 8/14/09 RAI (TAC MC4691) Jack: In the September 15, 2009, meeting by telephone conference, the NRC staff agreed to combine and modify Questions 4, 6, 7, and 12 of the formal RAI dated 8/14/2009 regarding GL 2004-02. Following is the result. When you respond to the 8/14/09 RAI, please refer to the following as "Revised Questions 5, 6, 7, and 12."   Revised Questions 5, 6, 7, and 12 Please provide the following information regarding debris generation, debris transport, and erosion of debris so that the NRC staff can verify that the amounts and size distribution of debris added to the strainer test were appropriate. Please provide this information for fiberglass, TempMat, and Thermobestos.
Kewaunee - Revised Questions 4, 6, 7, and 12 of the 8/14/09 RAI (TAC MC4691)
Jack:
In the September 15, 2009, meeting by telephone conference, the NRC staff agreed to combine and modify Questions 4, 6, 7, and 12 of the formal RAI dated 8/14/2009 regarding GL 2004-
: 02. Following is the result. When you respond to the 8/14/09 RAI, please refer to the following as "Revised Questions 5, 6, 7, and 12."
Revised Questions 5, 6, 7, and 12 Please provide the following information regarding debris generation, debris transport, and erosion of debris so that the NRC staff can verify that the amounts and size distribution of debris added to the strainer test were appropriate. Please provide this information for fiberglass, TempMat, and Thermobestos.
: a. The amount of each debris type generated by the limiting break(s), including the size categorization of the debris as it is initially generated by the LOCA blowdown. Include the bases for this information, such as approved guidance or test data.
: a. The amount of each debris type generated by the limiting break(s), including the size categorization of the debris as it is initially generated by the LOCA blowdown. Include the bases for this information, such as approved guidance or test data.
: b. The amounts of TempMat, fiberglass pipe cover, and Thermobestos that are considered to erode into fine debris over the entire sump mission time and the basis for the amounts provided. Include information regarding how the initial size distribution of the debris affected the erosion results for each type of debris.
: b. The amounts of TempMat, fiberglass pipe cover, and Thermobestos that are considered to erode into fine debris over the entire sump mission time and the basis for the amounts provided. Include information regarding how the initial size distribution of the debris affected the erosion results for each type of debris.
: c. Describe how debris that was considered to reach the strainer by the transport calculation and was added to the head loss test flume, but settled prior to reaching the strainer, was treated with respect to erosion. Did the strainer test include a sufficient quantity of fine debris to account for this source? Debris of interest includes Thermobestos, fiberglass, and TempMat. If a sufficient quantity of fine debris to account for the eroded fines from these components was not added to the test, provide a justification for not doing so or show that the test was not affected non-conservatively by this issue. d. The amount of each debris type added to the head loss test broken down into the size components fine, small, large, intact. Please include a description of what each debris component represents.
: c. Describe how debris that was considered to reach the strainer by the transport calculation and was added to the head loss test flume, but settled prior to reaching the strainer, was treated with respect to erosion. Did the strainer test include a sufficient quantity of fine debris to account for this source? Debris of interest includes Thermobestos, fiberglass, and TempMat. If a sufficient quantity of fine debris to account for the eroded fines from these components was not added to the test, provide a justification for not doing so or show that the test was not affected non-conservatively by this issue.
: d. The amount of each debris type added to the head loss test broken down into the size components fine, small, large, intact. Please include a description of what each debris component represents.
: e. The scaling factor used during strainer testing and the basis for this factor.
: e. The scaling factor used during strainer testing and the basis for this factor.
Peter S. Tam , Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED1026AB0872D)  
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED1026AB0872D)


==Subject:==
==Subject:==
Kewaunee - Revised Questions 4, 6, 7, and 12 of the 8/14/09 RAI (TAC MC4691)
Kewaunee - Revised Questions 4, 6, 7, and 12 of the 8/14/09 RAI (TAC MC4691)
Sent Date:       10/13/2009 5:54:51 PM Received Date:        10/14/2009 9:46:00 AM From:               Tam, Peter  
Sent Date:       10/13/2009 5:54:51 PM Received Date:        10/14/2009 9:46:00 AM From:             Tam, Peter Created By:        Peter.Tam@nrc.gov Recipients:
 
Created By:        Peter.Tam@nrc.gov  
 
Recipients:
jack.gadzala@dom.com ('Jack Gadzala')
jack.gadzala@dom.com ('Jack Gadzala')
Tracking Status: None craig.d.sly@dom.com ('Craig D Sly')
Tracking Status: None craig.d.sly@dom.com ('Craig D Sly')
Tracking Status: None thomas.l.breene@dom.com ('Thomas Breene (thomas.l.breene@dom.com)')                 Tracking Status: None Stewart.Bailey@nrc.gov (Bailey, Stewart)
Tracking Status: None thomas.l.breene@dom.com ('Thomas Breene (thomas.l.breene@dom.com)')
Tracking Status: None Stewart.Bailey@nrc.gov (Bailey, Stewart)
Tracking Status: None John.Lehning@nrc.gov (Lehning, John)
Tracking Status: None John.Lehning@nrc.gov (Lehning, John)
Tracking Status: None  
Tracking Status: None Post Office:
 
HQCLSTR02.nrc.gov Files           Size     Date & Time MESSAGE           19618     10/13/2009 Options Expiration Date:
Post Office:
Priority:                 olImportanceNormal ReplyRequested:         False Return Notification:        False Sensitivity:       olNormal Recipients received:}}
HQCLSTR02.nrc.gov Files               Size       Date & Time  
 
MESSAGE       19618       10/13/2009  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:       False Return Notification:        False  
 
Sensitivity:         olNormal Recipients received:}}

Revision as of 01:32, 14 November 2019

Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02
ML092870211
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/14/2009
From: Tam P
Plant Licensing Branch III
To: Breene T, Gadzala J, Sly C
Dominion Energy Kewaunee
Tam P
References
GL-04-002, TAC MC4691
Download: ML092870211 (2)


Text

Accession No. ML092870211 From: Tam, Peter Sent: Wednesday, October 14, 2009 9:47 AM To: 'Jack Gadzala'; 'Craig D Sly'; 'Thomas Breene (thomas.l.breene@dom.com)'

Cc: Bailey, Stewart; Lehning, John

Subject:

Kewaunee - Revised Questions 4, 6, 7, and 12 of the 8/14/09 RAI (TAC MC4691)

Jack:

In the September 15, 2009, meeting by telephone conference, the NRC staff agreed to combine and modify Questions 4, 6, 7, and 12 of the formal RAI dated 8/14/2009 regarding GL 2004-

02. Following is the result. When you respond to the 8/14/09 RAI, please refer to the following as "Revised Questions 5, 6, 7, and 12."

Revised Questions 5, 6, 7, and 12 Please provide the following information regarding debris generation, debris transport, and erosion of debris so that the NRC staff can verify that the amounts and size distribution of debris added to the strainer test were appropriate. Please provide this information for fiberglass, TempMat, and Thermobestos.

a. The amount of each debris type generated by the limiting break(s), including the size categorization of the debris as it is initially generated by the LOCA blowdown. Include the bases for this information, such as approved guidance or test data.
b. The amounts of TempMat, fiberglass pipe cover, and Thermobestos that are considered to erode into fine debris over the entire sump mission time and the basis for the amounts provided. Include information regarding how the initial size distribution of the debris affected the erosion results for each type of debris.
c. Describe how debris that was considered to reach the strainer by the transport calculation and was added to the head loss test flume, but settled prior to reaching the strainer, was treated with respect to erosion. Did the strainer test include a sufficient quantity of fine debris to account for this source? Debris of interest includes Thermobestos, fiberglass, and TempMat. If a sufficient quantity of fine debris to account for the eroded fines from these components was not added to the test, provide a justification for not doing so or show that the test was not affected non-conservatively by this issue.
d. The amount of each debris type added to the head loss test broken down into the size components fine, small, large, intact. Please include a description of what each debris component represents.
e. The scaling factor used during strainer testing and the basis for this factor.

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED1026AB0872D)

Subject:

Kewaunee - Revised Questions 4, 6, 7, and 12 of the 8/14/09 RAI (TAC MC4691)

Sent Date: 10/13/2009 5:54:51 PM Received Date: 10/14/2009 9:46:00 AM From: Tam, Peter Created By: Peter.Tam@nrc.gov Recipients:

jack.gadzala@dom.com ('Jack Gadzala')

Tracking Status: None craig.d.sly@dom.com ('Craig D Sly')

Tracking Status: None thomas.l.breene@dom.com ('Thomas Breene (thomas.l.breene@dom.com)')

Tracking Status: None Stewart.Bailey@nrc.gov (Bailey, Stewart)

Tracking Status: None John.Lehning@nrc.gov (Lehning, John)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 19618 10/13/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: