On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant. The inspection covered one or more of the key attributes of the security cornerstone of the | On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with you and other members of your staff. | ||
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission | This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license. | ||
=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, no findings of significance were identified. | Based on the results of this inspection, no findings of significance were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. | ||
=s enclosure will not be available for public inspection. PROGRESS ENERGY 2 In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC | |||
=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b) (1). | ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. PROGRESS ENERGY 2 In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b) (1). | ||
Sincerely, | Sincerely, | ||
/RA/ Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 | /RA/ | ||
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 Enclosure: | |||
Enclosure: | NRC Security Inspection Report 05000325/2012403 and 05000324/2012403 w/Attachment: Supp. Info (OUO) | ||
NRC Security Inspection Report | cc w/encl.: (See page 3) ML12054A797 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RI:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA RA RA NAME J. TORNOW J. WALLO R. PATTERSON B. DESAI R. MUSSER DATE 02/01/2012 02/20/2012 02/02/2012 02/21/2012 02/21/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PROGRESS ENERGY 3 cc w/encl: | ||
Edward L. Wills, Jr. Joseph W. Donahue Director Site Operations Vice President Brunswick Steam Electric Plant Nuclear Oversight P. O. Box 10429 Progress Energy Southport, NC 28461-0429 TPP-15 100 E. Davie Street Joseph M. Frisco, Jr. Raleigh, NC 27601 Plant General Manager Brunswick Steam Electric Plant Kelvin Henderson Progress Energy General Manager P. O. Box 10429 Nuclear Fleet Operations Southport, NC 28461-0429 Progress Energy TPP-15 Phyllis N. Mentel 100 E. Davie Street Manager, Support Services Raleigh, NC 27601 Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. Edward T. O'Neil P.O. Box 10429 Director Southport, NC 28461-0429 Nuclear Protective Services and Emergency Preparedness Annette H. Pope Progress Energy Supervisor, Licensing/Regulatory Programs TPP-15 Brunswick Steam Electric Plant 100 East Davie Street Progress Energy Carolinas, Inc. Raleigh, NC 27601 P.O. Box 10429 Southport, NC 28461-0429 Allen K. Brittain Manager Nuclear Security Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429 | |||
05000325/2012403 and 05000324/2012403 w/Attachment: Supp. Info (OUO) cc w/encl.: (See page 3) | |||
ML12054A797 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RI:DRS RII:DRS RII:DRS RII:DRP SIGNATURE | |||
Director Site Operations Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 Joseph M. Frisco, Jr. | |||
Plant General Manager Brunswick Steam Electric Plant Progress Energy P. O. Box 10429 Southport, NC 28461-0429 | |||
Phyllis N. Mentel Manager, Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. | |||
P.O. Box 10429 Southport, NC 28461-0429 Annette H. Pope Supervisor, Licensing/Regulatory Programs Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. P.O. Box 10429 Southport, NC 28461-0429 | |||
Allen K. Brittain Manager Nuclear Security Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429 | |||
}} | }} | ||
Revision as of 07:50, 12 November 2019
| ML12054A797 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/21/2012 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Annacone M Carolina Power & Light Co |
| References | |
| IR-12-403 | |
| Download: ML12054A797 (4) | |
Text
UNITED STATES bruary 21, 2012
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NRC SECURITY INSPECTION REPORT 05000325/2012403 AND 05000324/2012403
Dear Mr. Annacone:
On January 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Brunswick Steam Electric Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with you and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. PROGRESS ENERGY 2 In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b) (1).
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 Enclosure:
NRC Security Inspection Report 05000325/2012403 and 05000324/2012403 w/Attachment: Supp. Info (OUO)
cc w/encl.: (See page 3) ML12054A797 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RI:DRS RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA RA RA NAME J. TORNOW J. WALLO R. PATTERSON B. DESAI R. MUSSER DATE 02/01/2012 02/20/2012 02/02/2012 02/21/2012 02/21/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PROGRESS ENERGY 3 cc w/encl:
Edward L. Wills, Jr. Joseph W. Donahue Director Site Operations Vice President Brunswick Steam Electric Plant Nuclear Oversight P. O. Box 10429 Progress Energy Southport, NC 28461-0429 TPP-15 100 E. Davie Street Joseph M. Frisco, Jr. Raleigh, NC 27601 Plant General Manager Brunswick Steam Electric Plant Kelvin Henderson Progress Energy General Manager P. O. Box 10429 Nuclear Fleet Operations Southport, NC 28461-0429 Progress Energy TPP-15 Phyllis N. Mentel 100 E. Davie Street Manager, Support Services Raleigh, NC 27601 Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. Edward T. O'Neil P.O. Box 10429 Director Southport, NC 28461-0429 Nuclear Protective Services and Emergency Preparedness Annette H. Pope Progress Energy Supervisor, Licensing/Regulatory Programs TPP-15 Brunswick Steam Electric Plant 100 East Davie Street Progress Energy Carolinas, Inc. Raleigh, NC 27601 P.O. Box 10429 Southport, NC 28461-0429 Allen K. Brittain Manager Nuclear Security Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429