{{#Wiki_filter:August 16, 2012
{{#Wiki_filter:UNITED STATES
   
                              NUCLEAR REGULATORY COMMISSION
Mr. Eric W. Olson
                                                REGION I V
Site Vice President
                                          1600 EAST LAMAR BLVD
Entergy Operations, Inc.
                                      ARLINGTON, TEXAS 76011-4511
River Bend Station
                                          August 16, 2012
5485 U.S. Highway 61
Mr. Eric W. Olson
St. Francisville, LA 70775
Site Vice President
  SUBJECT: RIVER BEND STATION
Entergy Operations, Inc.
- NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000458/2012010
River Bend Station
Dear Mr. Olson
5485 U.S. Highway 61
: The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct  
St. Francisville, LA 70775
an augmented inspection team follow
SUBJECT:         RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM
-up inspection at your River Bend Station. The inspection will be comprised of resident inspectors and  
                FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT
a regional reactor inspector
                05000458/2012010
from the NRC Region
Dear Mr. Olson:
IV office. The inspection will be conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight process
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
baseline inspection procedures.
staff will conduct an augmented inspection team follow-up inspection at your River Bend
The schedule for the inspection is as follows:
Station. The inspection will be comprised of resident inspectors and a regional reactor inspector
    In-office preparation
from the NRC Region IV office. The inspection will be conducted in accordance with Inspection
: September 10 - 14, 2012 Onsite inspection
Procedure 93800 and multiple reactor oversight process baseline inspection procedures.
: September 17 - 21, 2012 This inspection is resource intensive both for the NRC inspectors and your staff.
The schedule for the inspection is as follows:
  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents
        In-office preparation: September 10 - 14, 2012
are requested to be provided by September 4, 2012. In addition, we request that appropriate
        Onsite inspection:     September 17 - 21, 2012
personnel knowledgeable  
This inspection is resource intensive both for the NRC inspectors and your staff. In order to
of each of the unresolved items documented in NRC Inspection Report 0500458/201200 9 be available to support the inspector s during the onsite inspection week. We have discussed  
minimize the impact to your onsite resources and to ensure a productive inspection, we have
th is inspection activit
enclosed a request for documents needed for this inspection. Please note that the documents
y with your staff. If there are any questions about this inspection or the material requested, please contact the team lead , Brian Tindell
are requested to be provided by September 4, 2012. In addition, we request that appropriate
, at 254-897-1500 or by email
personnel knowledgeable of each of the unresolved items documented in NRC Inspection
at brian.tindell@nrc.gov
Report 0500458/2012009 be available to support the inspectors during the onsite inspection
.     U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD
week.
A R L I N G T O N , T E X A S 7 6 0 1 1-4511 
We have discussed this inspection activity with your staff. If there are any questions about this
E. Olson - 2 -  This letter does
inspection or the material requested, please contact the team lead, Brian Tindell, at
not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
254-897-1500 or by email at brian.tindell@nrc.gov.
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget
 
Control No. I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
E. Olson                                      -2-
-rm/adams.html
This letter does not contain new or amended information collection requirements subject to the
(the Public Electronic Reading Room).
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
  Sincerely,  /RA/  Vincent G. Gaddy, Chief Project Branch C Division of Reactor Projects 
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.
Docket:  05000458 License:  NPF-4 7  Enclosure:  Augmented Inspection Team Follow
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
-up Inspection Document Request 
information or an information collection requirement unless the requesting document displays a
c c w/ encl:  Electronic Distribution
currently valid Office of Management and Budget Control No.
     
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
E. Olson - 3 -  Electronic distribution by RIV:
its enclosure will be available electronically for public inspection in the NRC Public
Regional Administrator (Elmo.Collins@nrc.gov)
Document Room or from the Publicly Available Records (PARS) component of NRC's
Deputy Regional Administrator (Art.Howell@nrc.gov)
document system (ADAMS). ADAMS is accessible from the NRC Web site at
DRP Director (Kriss.Kennedy@nrc.gov)
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
                                                Sincerely,
Acting DRS Director (Tom.Blount@nrc.gov)
                                                  /RA/
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
                                                Vincent G. Gaddy, Chief
Senior Resident Inspector (Grant.Larkin@nrc.gov)
                                                Project Branch C
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
                                                Division of Reactor Projects
Resident Inspector (Andy.Barrett@nrc.gov)
Docket: 05000458
RBS Administrative Assistant (Lisa.Day@nrc.gov)
License: NPF-47
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
cc w/ encl: Electronic Distribution
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
E. Olson                                  -3-
  Project Manager (Alan.Wang@nrc.gov)
Electronic distribution by RIV:
  Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
  RITS Coordinator (Marisa.Herrera@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
OEMail Resource
Acting DRS Director (Tom.Blount@nrc.gov)
RIV/ETA: OEDO
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
(Silas.Kennedy@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
   
Resident Inspector (Andy.Barrett@nrc.gov)
          R:\_REACTORS\_RB\2012\RBS 20120 10 Inspection Planning Ltr.doc SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials
RBS Administrative Assistant (Lisa.Day@nrc.gov)
VGG Publicly Avail
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
  Yes  No Sensitive  Yes  No Sens. Type Initials
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
VGG RI:DRP/A BC:DR P/C    BTindell VGGaddy    /RA via Email /RA/    08/16/2012 08/16/2012    OFFICIAL RECORD COPY
Public Affairs Officer (Victor.Dricks@nrc.gov)
    T=Telephone          E=E
Public Affairs Officer (Lara.Uselding@nrc.gov)
-mail        F=Fax
Project Manager (Alan.Wang@nrc.gov)
 
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
  - 1 - Enclosure  Augmented Inspection Team Follow
RITS Coordinator (Marisa.Herrera@nrc.gov)
-up Inspection Document Request
Regional Counsel (Karla.Fuller@nrc.gov)
  Inspection Dates:
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
  In-office preparation:  September 10
OEMail Resource
- 14, 2012    Onsite:  September 17
RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)
- 21, 2012  Inspection Procedures:
DRS/TSB STA (Dale.Powers@nrc.gov)
IP 93800 , Augmented Inspection Team
R:\_REACTORS\_RB\2012\RBS2012010 Inspection Planning Ltr.doc      ML 12229A511
Various Reactor Oversight Process
SUNSI Rev          Yes No          ADAMS      Yes  No Reviewer Initials  VGG
Baseline Inspection Procedures
Compl.
  Team Lead:  Brian Tindell, Resident Inspector, Comanche Peak NPP
Publicly Avail    Yes No          Sensitive  Yes  No Sens. Type Initials VGG
      The following information should be sent to the Region IV office in hard copy or electronic format in care of Brian Tindell
RI:DRP/A          BC:DRP/C
, by September 4, 2012.  Please provide requested documentation electronically if possible.  Also, we request that you categorize the documents with the numbered list below.
BTindell          VGGaddy
If you are unable to send the requested information, please inform the inspector s and provide the documentation during the first day of the onsite inspectionThe inspector s will request additional documents during the
  /RA via Email      /RA/
preparation and
08/16/2012        08/16/2012
  onsite inspection week sIf you have any questions regarding this information request, please contact
OFFICIAL RECORD COPY                              T=Telephone    E=E-mail    F=Fax
the team lead. For the following items from Augmented Inspection Team Inspection
 
  Report 050004 58/201200 9 , please provide current copies, as applicable, of related condition reports, work orders, root cause analysis and/or apparent cause evaluations , system design criteria
          Augmented Inspection Team Follow-up Inspection Document Request
, vendor manuals, UFSAR descriptions, technical specification requirements, technical requirements manual requirements, fire protection report
Inspection Dates:              In-office preparation: September 10 - 14, 2012
  descriptions, procedures, drawings, plant safety index records, fire incident report
                                Onsite: September 17 - 21, 2012
s , scram reports, industry operating experience screening s , and post-event risk analysis
Inspection Procedures:          IP 93800, Augmented Inspection Team
: 1. Main Control Room Annunciator Control and Conduct of Operations
                                Various Reactor Oversight Process Baseline Inspection
2. Past Operability of the Reactor Core Isolation Cooling System
                                Procedures
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions
Team Lead:                      Brian Tindell, Resident Inspector, Comanche Peak NPP
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in
The following information should be sent to the Region IV office in hard copy or electronic
February 2011 5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance
format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation
6. Implementation of the Station Cable Reliability Program
electronically if possible. Also, we request that you categorize the documents with the
7. Onsite Safety Review Committee Implementation
numbered list below. If you are unable to send the requested information, please inform the
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation
inspectors and provide the documentation during the first day of the onsite inspection. The
   
inspectors will request additional documents during the preparation and onsite inspection
  - 2 - Enclosure Inspector Contact Information:
weeks. If you have any questions regarding this information request, please contact the team
Brian Tindell
lead.
Resident Inspector 254-897-1500 brian.tindell@nrc.gov
For the following items from Augmented Inspection Team Inspection Report
  Mailing Address:
05000458/2012009, please provide current copies, as applicable, of related condition reports,
US NRC Region
work orders, root cause analysis and/or apparent cause evaluations, system design criteria,
IV Attn: Brian Tindell
vendor manuals, UFSAR descriptions, technical specification requirements, technical
1600 East Lamar Blvd.
requirements manual requirements, fire protection report descriptions, procedures, drawings,
Arlington, TX 76011
plant safety index records, fire incident reports, scram reports, industry operating experience
-4511
screenings, and post-event risk analysis:
    1Main Control Room Annunciator Control and Conduct of Operations
    2. Past Operability of the Reactor Core Isolation Cooling System
    3Implementation of the Procedure for Infrequently Performed Tests or Evolutions
    4Corrective Action Program Implementation for Prior Lockout Relay Failure in
        February 2011
    5.  Implementation of Vendor and Industry Recommended Relay Testing and Maintenance
    6. Implementation of the Station Cable Reliability Program
    7.  Onsite Safety Review Committee Implementation
    8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation
                                                -1-                                    Enclosure
 
Inspector Contact Information:
Brian Tindell
Resident Inspector
254-897-1500
brian.tindell@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Brian Tindell
1600 East Lamar Blvd.
Arlington, TX 76011-4511
                              -2- Enclosure
}}
}}

Revision as of 23:41, 11 November 2019

IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter
ML12229A511
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/16/2012
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-C
To: Olson E
Entergy Operations
Gaddy V
References
IR-12-010
Download: ML12229A511 (5)


See also: IR 05000458/2012010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

August 16, 2012

Mr. Eric W. Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM

FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT

05000458/2012010

Dear Mr. Olson:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV

staff will conduct an augmented inspection team follow-up inspection at your River Bend

Station. The inspection will be comprised of resident inspectors and a regional reactor inspector

from the NRC Region IV office. The inspection will be conducted in accordance with Inspection

Procedure 93800 and multiple reactor oversight process baseline inspection procedures.

The schedule for the inspection is as follows:

In-office preparation: September 10 - 14, 2012

Onsite inspection: September 17 - 21, 2012

This inspection is resource intensive both for the NRC inspectors and your staff. In order to

minimize the impact to your onsite resources and to ensure a productive inspection, we have

enclosed a request for documents needed for this inspection. Please note that the documents

are requested to be provided by September 4, 2012. In addition, we request that appropriate

personnel knowledgeable of each of the unresolved items documented in NRC Inspection

Report 0500458/2012009 be available to support the inspectors during the onsite inspection

week.

We have discussed this inspection activity with your staff. If there are any questions about this

inspection or the material requested, please contact the team lead, Brian Tindell, at

254-897-1500 or by email at brian.tindell@nrc.gov.

E. Olson -2-

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control No. 3150 0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget Control No.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Project Branch C

Division of Reactor Projects

Docket: 05000458

License: NPF-47

Enclosure: Augmented Inspection Team Follow-up Inspection Document Request

cc w/ encl: Electronic Distribution

E. Olson -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Alan.Howe@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\_REACTORS\_RB\2012\RBS2012010 Inspection Planning Ltr.doc ML 12229A511

SUNSI Rev Yes No ADAMS Yes No Reviewer Initials VGG

Compl.

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials VGG

RI:DRP/A BC:DRP/C

BTindell VGGaddy

/RA via Email /RA/

08/16/2012 08/16/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Augmented Inspection Team Follow-up Inspection Document Request

Inspection Dates: In-office preparation: September 10 - 14, 2012

Onsite: September 17 - 21, 2012

Inspection Procedures: IP 93800, Augmented Inspection Team

Various Reactor Oversight Process Baseline Inspection

Procedures

Team Lead: Brian Tindell, Resident Inspector, Comanche Peak NPP

The following information should be sent to the Region IV office in hard copy or electronic

format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation

electronically if possible. Also, we request that you categorize the documents with the

numbered list below. If you are unable to send the requested information, please inform the

inspectors and provide the documentation during the first day of the onsite inspection. The

inspectors will request additional documents during the preparation and onsite inspection

weeks. If you have any questions regarding this information request, please contact the team

lead.

For the following items from Augmented Inspection Team Inspection Report 05000458/2012009, please provide current copies, as applicable, of related condition reports,

work orders, root cause analysis and/or apparent cause evaluations, system design criteria,

vendor manuals, UFSAR descriptions, technical specification requirements, technical

requirements manual requirements, fire protection report descriptions, procedures, drawings,

plant safety index records, fire incident reports, scram reports, industry operating experience

screenings, and post-event risk analysis:

1. Main Control Room Annunciator Control and Conduct of Operations

2. Past Operability of the Reactor Core Isolation Cooling System

3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions

4. Corrective Action Program Implementation for Prior Lockout Relay Failure in

February 2011

5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance

6. Implementation of the Station Cable Reliability Program

7. Onsite Safety Review Committee Implementation

8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation

-1- Enclosure

Inspector Contact Information:

Brian Tindell

Resident Inspector

254-897-1500

brian.tindell@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Brian Tindell

1600 East Lamar Blvd.

Arlington, TX 76011-4511

-2- Enclosure